05/07/2022 08:38:46 |
Post Construction Viability Assessment prepared by BPS 4.7.22
|
Supporting Documents
|
07/03/2022 08:50:03 |
Private Members Club Management Plan + Noise Management Plan_amended
|
Supporting Documents
|
21/02/2022 18:16:46 |
Private Members Club Management Plan + Noise Management Plan
|
Superseded
|
13/01/2022 09:46:18 |
Koko Camden - S106 Post-Construction Viability Review September 2021 (Executive Summary)
|
Supporting Documents
|
13/01/2022 09:36:27 |
Koko Report 10 (Final) Redacted for LPA Issue_Redacted
|
Supporting Documents
|
08/11/2021 09:18:47 |
2021 11 08 Camden High Street 1A 2017_6058_P AG
|
S106 submission
|
08/11/2021 09:18:18 |
3126 Pre-Occupation Travel Plan (October 2021) Approved Travel Plan
|
S106 submission
|
06/05/2021 14:14:17 |
Post completion certification of the DBCP 5/5/21
|
Supporting Documents
|
09/04/2019 14:03:15 |
Officer Committee Report
|
Officer Committee Report
|
05/10/2018 14:39:26 |
CMP Addendum - signed by Mains Contractor
|
S106 submission
|
05/10/2018 14:39:01 |
Camden CMP for KOKO Rev 1- Approved CMP
|
S106 submission
|
18/06/2018 10:47:11 |
Hope & Anchor TM&LP rev 3(2) Approved DMP
|
S106 submission
|
18/06/2018 10:46:37 |
DMP Pro-forma KOKO Hope & Anchor 150618 rev 3- Approved DMP
|
S106 submission
|
02/05/2018 16:27:23 |
Decision Notice
|
Decision Notice
|
02/05/2018 15:06:05 |
Koko 1A Camden High Street - Decision
|
Decision Notice
|
02/05/2018 15:05:42 |
Koko 1A Camden High Street - Agreement part 2
|
Legal Agreement
|
02/05/2018 15:05:26 |
Koko 1A Camden High Street - Agreement part 1
|
Legal Agreement
|
05/02/2018 15:19:52 |
Thames Water consultation - 3rd Party Planning Application - 2017/6058/P
|
Consultation Response
|
30/01/2018 08:29:48 |
BIA Audit February 2017
|
Supporting Documents
|
24/01/2018 16:04:21 |
Historic England response (Redacted)
|
Consultation Response
|
22/01/2018 17:05:33 |
rpt.011. Operational Management Plan - - Update - 22/01/18
|
Supporting Documents
|
15/01/2018 16:12:35 |
2402-Energy Assessment
|
Supporting Documents
|
15/01/2018 16:12:02 |
KOKO SCI Addendum 201217
|
Supporting Documents
|
15/01/2018 15:13:47 |
AHA-KKC-GA-104 [B] Proposed 4F Plan_Rev B
|
Revised Drawing
|
15/01/2018 15:13:29 |
AHA-KKC-GA-105 [C] Proposed Roof Plan_Rev C(2)
|
Revised Drawing
|
15/01/2018 15:11:47 |
AHA-KKC-PR-201 [B] Proposed Crowndale Road Elevation_Rev B
|
Revised Drawing
|
15/01/2018 15:11:26 |
KOKO Schedule of Works Part 3_Rev B
|
Revised Drawing
|
15/01/2018 15:11:01 |
AHA-KKC-GA-001 [A] Proposed Site Plan_Rev A
|
Revised Drawing
|
15/01/2018 13:06:22 |
1444 - Koko - Drainage Strategy Report v.02(2)
|
Supporting Documents
|
15/01/2018 10:03:18 |
1444 - Koko - Drainage Strategy Report v.02
|
Supporting Documents
|
27/12/2017 15:29:33 |
Theatres Trust response (Redacted)
|
Consultation Response
|
22/12/2017 14:57:56 |
Comments from Theatres Trust
|
Consultation Response
|
21/12/2017 14:42:08 |
Designing out Crime Addendum - KOKO Option B
|
Supporting Documents
|
21/12/2017 14:18:06 |
AHA-KKC-GA-100DDA [-] Proposed GF Plan DDA KOKO Route
|
Supporting Documents
|
20/12/2017 15:33:09 |
KOKO_AHA Design & Access Statement part 2_Rev A(2)
|
Design and Access Statement
|
20/12/2017 15:32:52 |
KOKO_AHA Design & Access Statement part 1_Rev A(2)
|
Design and Access Statement
|
20/12/2017 15:32:13 |
KOKO Schedule of Works Part 3A_Rev A(2)
|
Supporting Documents
|
20/12/2017 15:31:55 |
KOKO Schedule of Works Part 3_Rev A(2)
|
Superseded
|
20/12/2017 15:31:36 |
KOKO Schedule of Works Part 2_Rev A(2)
|
Supporting Documents
|
20/12/2017 15:31:20 |
KOKO Schedule of Works Part 1_Rev A(2)
|
Supporting Documents
|
20/12/2017 15:31:07 |
AHA-KKC-PR-203 [B] Proposed Bayham Place Elevation_Rev B(2)
|
Revised Drawing
|
20/12/2017 15:30:38 |
AHA-KKC-PR-202 [A] Proposed Bayham Street Elevation_Rev A(2)
|
Revised Drawing
|
20/12/2017 15:30:19 |
AHA-KKC-GA-105 [B] Proposed Roof Plan_Rev B(2)
|
Superseded
|
20/12/2017 15:30:06 |
AHA-KKC-GA-102 [C] Proposed 2F Plan_Rev C(2)
|
Revised Drawing
|
20/12/2017 15:29:52 |
AHA-KKC-GA-101 [C] Proposed 1F Plan_Rev C(2)
|
Revised Drawing
|
20/12/2017 15:29:39 |
AHA-KKC-GA-100 [C] Proposed GF Plan_Rev C(2)
|
Revised Drawing
|
20/12/2017 15:29:21 |
AHA-KKC-GA-099 [B] Proposed BF Plan_Rev B(2)
|
Revised Drawing
|
20/12/2017 15:29:09 |
AHA-KKC-GA-098 [B] Proposed LBF Plan_Rev B(2)
|
Revised Drawing
|
20/12/2017 15:28:53 |
AHA-KKC-DM-203 [A] Demolition Bayham Place Elevation_Rev A(2)
|
Revised Drawing
|
20/12/2017 15:28:41 |
AHA-KKC-DM-100 [C] Demolition GF Plan_Rev C(2)
|
Revised Drawing
|
20/12/2017 15:28:25 |
AHA-KKC-DM-099 [B] Demolition BF Plan_Rev B(2)
|
Revised Drawing
|
20/12/2017 15:28:09 |
AHA-KKC-DM-098 [B] Demolition LBF Plan_Rev B(2)
|
Revised Drawing
|
19/12/2017 09:12:12 |
Updated area schedule - GEA GIA
|
Supporting Documents
|
14/12/2017 18:49:30 |
AHA-KKC-EX-306 [-] Existing Section FF
|
Existing Drawing
|
13/12/2017 17:28:17 |
AHA-KKC-DM-200 [-] Demolition Front Elevation
|
Drawing
|
13/12/2017 17:27:43 |
AHA-KKC-PR-311 [A] Proposed Section GG_RevA
|
Revised Drawing
|
13/12/2017 17:27:11 |
AHA-KKC-DM-303 [B] Demolition Section DD_Rev B(2)
|
Revised Drawing
|
12/12/2017 17:15:56 |
COMMENTS from CT CAAC
|
Consultation Response
|
07/12/2017 17:00:26 |
1x response - LAMAS
|
Consultation Response
|
06/12/2017 16:47:39 |
London Underground Infrastructure Protection response
|
Consultation Response
|
24/11/2017 15:51:39 |
Operational Management Plan - Update - 24.11.2017
|
Superseded
|
20/11/2017 11:20:48 |
TfLs Response (Redacted)
|
Consultation Response
|
15/11/2017 16:03:30 |
1x Response
|
Consultation Response
|
08/11/2017 08:56:26 |
rpt.011. Operational Management Plan - Final PART 1 A
|
Superseded
|
30/10/2017 15:38:11 |
AHA-KKC-DM-200 [-] Demolition Front Elevation(2)
|
Superseded
|
30/10/2017 15:37:48 |
AHA-KKC-PR-200 [A] Proposed Front Elevation_Rev A
|
Proposed Drawing
|
30/10/2017 15:11:46 |
Energy Assessment
|
Superseded
|
30/10/2017 10:09:48 |
View 8 SA237-008-171018
|
Supporting Documents
|
30/10/2017 10:09:21 |
View 7 SA237-007-171013
|
Supporting Documents
|
30/10/2017 10:09:10 |
View 6 SA237-006-171018
|
Supporting Documents
|
30/10/2017 10:08:52 |
View 5 SA237-005-171018
|
Superseded
|
30/10/2017 10:08:29 |
View 4 SA237-004-171018
|
Supporting Documents
|
30/10/2017 10:08:15 |
View 3 SA237-003-171018
|
Supporting Documents
|
30/10/2017 10:08:01 |
View 2 SA237-002-171018
|
Supporting Documents
|
30/10/2017 10:07:52 |
View 1 SA237-001-171018
|
Supporting Documents
|
30/10/2017 10:07:40 |
The Hope Project Noise Impact Assessment rev04
|
Supporting Documents
|
30/10/2017 10:07:05 |
The Hope Project Daylight & Sunlight Rep
|
Supporting Documents
|
30/10/2017 10:06:53 |
SLHA The Hope Project - Heritage Statement_Full App_Oct2017 (3of3)
|
Supporting Documents
|
30/10/2017 10:06:08 |
SLHA The Hope Project - Heritage Statement_Full App_Oct2017 (2of3)
|
Supporting Documents
|
30/10/2017 10:05:54 |
SLHA The Hope Project - Heritage Statement_Full App_Oct2017 (1of3)
|
Supporting Documents
|
30/10/2017 10:05:36 |
Sky Lobby Details
|
Proposed Drawing
|
30/10/2017 10:04:46 |
Site Plan
|
OS Extract
|
30/10/2017 10:04:33 |
Schedule of Works_Part 3_merged_1
|
Superseded
|
30/10/2017 10:04:19 |
Schedule of Works_Part 3_merged
|
Superseded
|
30/10/2017 10:04:08 |
Schedule of Works_Part 2_merged
|
Superseded
|
30/10/2017 10:03:55 |
Schedule of Works_Part 1_merged
|
Superseded
|
30/10/2017 10:03:38 |
Schedule of Works_Part 1_merged
|
Superseded
|
30/10/2017 10:03:27 |
RSK 442720.AQ.01 (5) Camden High Street KOKO Air Quality Assessment
|
Supporting Documents
|
30/10/2017 10:03:16 |
rpt.011. Operational Management Plan - Final PART 3
|
Supporting Documents
|
30/10/2017 10:03:03 |
rpt.011. Operational Management Plan - Final PART 2
|
Supporting Documents
|
30/10/2017 10:02:53 |
rpt.011. Operational Management Plan - Final PART 1
|
Superseded
|
30/10/2017 10:02:39 |
Roof Terrace Study 4
|
Supporting Documents
|
30/10/2017 10:02:30 |
Roof Terrace Study 3
|
Supporting Documents
|
30/10/2017 10:02:21 |
Roof Terrace Study 2
|
Supporting Documents
|
30/10/2017 10:02:11 |
Roof Terrace Study
|
Supporting Documents
|
30/10/2017 10:02:00 |
Proposed Site Plan
|
Superseded
|
30/10/2017 10:01:51 |
Proposed Section KK
|
Proposed Drawing
|
30/10/2017 10:01:41 |
Proposed Section JJ
|
Proposed Drawing
|
30/10/2017 10:01:31 |
Proposed Section GG
|
Superseded
|
30/10/2017 10:01:22 |
Proposed Section FF
|
Proposed Drawing
|
30/10/2017 10:01:11 |
Proposed Section DD
|
Proposed Drawing
|
30/10/2017 10:01:01 |
Proposed Section CC
|
Proposed Drawing
|
30/10/2017 10:00:52 |
Proposed Section BB
|
Proposed Drawing
|
30/10/2017 10:00:43 |
Proposed Section AA
|
Proposed Drawing
|
30/10/2017 10:00:33 |
Proposed Roof Plan_Rev A(1)
|
Superseded
|
30/10/2017 10:00:19 |
Proposed Roof Plan_Rev A
|
Superseded
|
30/10/2017 10:00:09 |
Proposed LBF Plan_Rev A
|
Superseded
|
30/10/2017 10:00:00 |
Proposed GF Plan_Rev B
|
Superseded
|
30/10/2017 09:59:51 |
Proposed Crowndale Road Elevation_RevA
|
Superseded
|
30/10/2017 09:59:42 |
Proposed BF Plan_Rev A
|
Superseded
|
30/10/2017 09:59:33 |
Proposed Bayham Street Elevation_Rev A
|
Superseded
|
30/10/2017 09:59:24 |
Proposed Bayham Place Elevation_Rev A
|
Superseded
|
30/10/2017 09:59:15 |
Proposed 4F Plan_Rev A
|
Superseded
|
30/10/2017 09:59:02 |
Proposed 3F Plan_Rev A
|
Proposed Drawing
|
30/10/2017 09:58:53 |
Proposed 2F Plan_Rev B
|
Superseded
|
30/10/2017 09:58:41 |
Proposed 1F Plan_Rev B
|
Superseded
|
30/10/2017 09:58:29 |
Location Plan 1:250
|
OS Extract
|
30/10/2017 09:58:12 |
let.016..DP Hope Project Cover Letter
|
Supporting Documents
|
30/10/2017 09:57:59 |
KOKO_AHA Design Access Statement
|
Superseded
|
30/10/2017 09:57:45 |
KOKO Planning Statement Option B_Part4
|
Supporting Documents
|
30/10/2017 09:57:35 |
KOKO Planning Statement Option B_Part3
|
Supporting Documents
|
30/10/2017 09:57:26 |
KOKO Planning Statement Option B_Part2
|
Supporting Documents
|
30/10/2017 09:57:17 |
KOKO Planning Statement Option B_Part1
|
Supporting Documents
|
30/10/2017 09:57:08 |
Koko Club - Economic Statement - DRAFT FINAL - 26 October 2017
|
Supporting Documents
|
30/10/2017 09:56:43 |
HUDU-Rapid-Health Impact Assessment -Tool-3rd-edition-April-2017-self-completion-form
|
Supporting Documents
|
30/10/2017 09:56:17 |
Existing Section DD
|
Existing Drawing
|
30/10/2017 09:56:08 |
Existing Section CC
|
Existing Drawing
|
30/10/2017 09:55:59 |
Existing Section BB
|
Existing Drawing
|
30/10/2017 09:55:50 |
Existing Section AA
|
Existing Drawing
|
30/10/2017 09:55:41 |
Existing Roof Plan
|
Existing Drawing
|
30/10/2017 09:55:31 |
Existing Lower BF Plan
|
Existing Drawing
|
30/10/2017 09:55:21 |
Existing GF Plan
|
Existing Drawing
|
30/10/2017 09:55:00 |
Existing Front Elevation
|
Existing Drawing
|
30/10/2017 09:54:52 |
Existing Elevation Crowndale Road Elevation
|
Existing Drawing
|
30/10/2017 09:54:43 |
Existing BF Plan
|
Existing Drawing
|
30/10/2017 09:54:31 |
Existing Bayham Street Elevation
|
Existing Drawing
|
30/10/2017 09:54:21 |
Existing Bayham Place Elevation
|
Existing Drawing
|
30/10/2017 09:54:10 |
Existing 4F Plan
|
Existing Drawing
|
30/10/2017 09:54:01 |
Existing 3F Plan
|
Existing Drawing
|
30/10/2017 09:53:51 |
Existing 2F Plan
|
Existing Drawing
|
30/10/2017 09:53:29 |
Existing 1F Plan
|
Existing Drawing
|
30/10/2017 09:53:18 |
Dormer Window Details
|
Proposed Drawing
|
30/10/2017 09:52:59 |
Demolition Section FF
|
Drawing
|
30/10/2017 09:52:50 |
Demolition Section DD_Rev A
|
Superseded
|
30/10/2017 09:52:40 |
Demolition Section CC
|
Drawing
|
30/10/2017 09:52:30 |
Demolition Section BB
|
Drawing
|
30/10/2017 09:52:18 |
Demolition Section AA
|
Drawing
|
30/10/2017 09:52:03 |
Demolition Roof Plan(1)
|
Drawing
|
30/10/2017 09:51:51 |
Demolition Roof Plan
|
Drawing
|
30/10/2017 09:51:42 |
Demolition LBF Plan_Rev A
|
Superseded
|
30/10/2017 09:51:32 |
Demolition GF Plan_Rev B
|
Superseded
|
30/10/2017 09:51:22 |
Demolition Crowndale Road Elevation_Rev A
|
Drawing
|
30/10/2017 09:50:38 |
Demolition BF Plan_Rev A
|
Superseded
|
30/10/2017 09:50:29 |
Demolition Bayham Street Elevation_Rev A
|
Drawing
|
30/10/2017 09:50:18 |
Demolition Bayham Place Elevation
|
Superseded
|
30/10/2017 09:50:03 |
Demolition 4F Plan_Rev A
|
Drawing
|
30/10/2017 09:49:33 |
Demolition 3F Plan_Rev A
|
Drawing
|
30/10/2017 09:49:22 |
Demolition 2F Plan_Rev B
|
Drawing
|
30/10/2017 09:49:12 |
Demolition 1F Plan_Rev B
|
Drawing
|
30/10/2017 09:48:58 |
CIL form(1)
|
Other
|
30/10/2017 09:48:37 |
Bayham Place Elevational Study
|
Proposed Drawing
|
30/10/2017 09:48:10 |
Application Form (No Personal Data)
|
Application Form
|
30/10/2017 09:46:39 |
371475-02 (04) Basement Impact Assessment FINAL_Part3
|
Supporting Documents
|
30/10/2017 09:46:14 |
371475-02 (04) Basement Impact Assessment FINAL_Part2
|
Supporting Documents
|
30/10/2017 09:42:21 |
371475-02 (04) Basement Impact Assessment FINAL_Part1
|
Supporting Documents
|
30/10/2017 09:42:10 |
371475-01 (05) Geo-environmental site assessment Final_Part14
|
Supporting Documents
|
30/10/2017 09:41:58 |
371475-01 (05) Geo-environmental site assessment Final_Part13
|
Supporting Documents
|
30/10/2017 09:41:46 |
371475-01 (05) Geo-environmental site assessment Final_Part12
|
Supporting Documents
|
30/10/2017 09:41:33 |
371475-01 (05) Geo-environmental site assessment Final_Part11
|
Supporting Documents
|
30/10/2017 09:41:22 |
371475-01 (05) Geo-environmental site assessment Final_Part10
|
Supporting Documents
|
30/10/2017 09:41:00 |
371475-01 (05) Geo-environmental site assessment Final_Part9
|
Supporting Documents
|
30/10/2017 09:40:49 |
371475-01 (05) Geo-environmental site assessment Final_Part8
|
Supporting Documents
|
30/10/2017 09:27:29 |
1444 - The Hope Project - Structural Methodology Statement (SMS) - 171027 - Part1
|
Supporting Documents
|
30/10/2017 09:27:43 |
1444 - The Hope Project - SMS - 171027 - Part2
|
Supporting Documents
|
30/10/2017 09:27:56 |
1444 - The Hope Project - SMS - 171027 - Part3
|
Supporting Documents
|
30/10/2017 09:28:13 |
1444 - The Hope Project - SMS - 171027 - Part4
|
Supporting Documents
|
30/10/2017 09:28:31 |
1444 - The Hope Project - SMS - 171027 - Part5
|
Supporting Documents
|
30/10/2017 09:28:43 |
1444 - The Hope Project - SMS - 171027 - Part6
|
Supporting Documents
|
30/10/2017 09:28:56 |
1444 - The Hope Project - SMS - 171027 - Part7
|
Supporting Documents
|
30/10/2017 09:29:06 |
1444 - The Hope Project - SMS - 171027 - Part8
|
Supporting Documents
|
30/10/2017 09:29:14 |
1444 - The Hope Project - SMS - 171027 - Part9
|
Supporting Documents
|
30/10/2017 09:29:26 |
1444 - The Hope Project - SMS - 171027 - Part10
|
Supporting Documents
|
30/10/2017 09:29:38 |
1444 - The Hope Project - SMS - 171027 - Part11
|
Supporting Documents
|
30/10/2017 09:29:50 |
1444 - The Hope Project - SMS - 171027 - Part12
|
Supporting Documents
|
30/10/2017 09:30:01 |
1444 - The Hope Project - SMS - 171027 - Part13
|
Supporting Documents
|
30/10/2017 09:30:14 |
1444 - The Hope Project - SMS - 171027 - Part14
|
Supporting Documents
|
30/10/2017 09:30:24 |
1444 - The Hope Project - SMS - 171027 - Part15
|
Supporting Documents
|
30/10/2017 09:30:34 |
1444 - The Hope Project - SMS - 171027 - Part16
|
Supporting Documents
|
30/10/2017 09:30:43 |
1444 - The Hope Project - SMS - 171027 - Part17
|
Supporting Documents
|
30/10/2017 09:30:53 |
1444 - The Hope Project - SMS - 171027 - Part18
|
Supporting Documents
|
30/10/2017 09:31:02 |
1444 - The Hope Project - SMS - 171027 - Part19
|
Supporting Documents
|
30/10/2017 09:31:11 |
1444 - The Hope Project - SMS - 171027 - Part20 includes SUDS and Sustainable Urban Drainage pro-forma
|
Supporting Documents
|
30/10/2017 09:31:21 |
1444 - The Hope Project - SMS - 171027 - Part21
|
Supporting Documents
|
30/10/2017 09:31:30 |
1444 - The Hope Project - SMS - 171027 - Part22
|
Supporting Documents
|
30/10/2017 09:31:40 |
1444 - The Hope Project - SMS - 171027 - Part23
|
Supporting Documents
|
30/10/2017 09:32:06 |
1444 - The Hope Project - SMS - 171027 - Part24
|
Supporting Documents
|
30/10/2017 09:32:21 |
2169 - KOKO Ecology BREEAM report - 1710-23rc (003)_Part1
|
Supporting Documents
|
30/10/2017 09:32:32 |
2169 - KOKO Ecology BREEAM report - 1710-23rc (003)_Part2
|
Supporting Documents
|
30/10/2017 09:32:45 |
2169 - KOKO Ecology BREEAM report - 1710-23rc (003)_Part3
|
Supporting Documents
|
30/10/2017 09:32:59 |
2169 - KOKO Ecology Management Plan - 1710-24rc
|
Supporting Documents
|
30/10/2017 09:33:09 |
2402-KOKO-Club Member-Overheating Analysis and Thermal Comfort-1708-11yp(1)
|
Supporting Documents
|
30/10/2017 09:33:26 |
2410-KOKO Option B- BREEAM 2014 -Refurbishment & Fit Out Prelim-1710-18ad
|
Supporting Documents
|
30/10/2017 09:33:35 |
2410-KOKO-Option B-BREEAM New Construction -Prelim-1710-18ad
|
Supporting Documents
|
30/10/2017 09:33:47 |
3126 Hope Project CMP Draft (October 2017)
|
Supporting Documents
|
30/10/2017 09:37:35 |
3126 Hope Project FRAMEWORK TRAVEL PLAN (October 2017)
|
Supporting Documents
|
30/10/2017 09:37:47 |
3126 Hope Project Interim DELIVERY AND SERVICING MANAGEMENT PLAN (October 2017)
|
Supporting Documents
|
30/10/2017 09:38:01 |
3126 Hope project TRANSPORT STATEMENT (October 2017)
|
Supporting Documents
|
30/10/2017 09:39:03 |
371475-01 (05) Geo-environmental site assessment Final_Part1
|
Supporting Documents
|
30/10/2017 09:39:13 |
371475-01 (05) Geo-environmental site assessment Final_Part2
|
Supporting Documents
|
30/10/2017 09:39:39 |
371475-01 (05) Geo-environmental site assessment Final_Part3
|
Supporting Documents
|
30/10/2017 09:39:50 |
371475-01 (05) Geo-environmental site assessment Final_Part4
|
Supporting Documents
|
30/10/2017 09:40:15 |
371475-01 (05) Geo-environmental site assessment Final_Part5
|
Supporting Documents
|
30/10/2017 09:40:24 |
371475-01 (05) Geo-environmental site assessment Final_Part6
|
Supporting Documents
|
30/10/2017 09:40:35 |
371475-01 (05) Geo-environmental site assessment Final_Part7
|
Supporting Documents
|