Related Documents

Summary

2013/5403/P
116

Application Documents

The links below are to PDF files. To view PDFs you need to download and install Adobe Acrobat Reader onto your computer. Help for people with visual disabilities: The files contained scanned documents that cannot be read by screen readers. If this is a problem for you please use the Planning online support form to request an alternative format.


Drawings can be large files. The quality of the image depends on the quality of the original submission.


Date Created Title Document Type
27/10/2015 10:21:55 Decision notice Decision Notice
29/05/2015 11:29:45 Legal Agreement - 100 100A 100B Chalk Farm Road Section 106
03/10/2014 18:50:59 RESPONSE FROM NETWORK RAIL (Redacted) Consultation Response
03/10/2014 18:49:28 DAVEY (ROUNDHOUSE) (Redacted) Consultation Response
03/10/2014 18:49:16 FUNGSUN KITCHEN (Redacted) Consultation Response
03/10/2014 18:02:29 2ND NETWORK RAIL RESPONSE (Redacted) Consultation Response
03/10/2014 17:55:09 ENGLISH HERITAGE RESPONSE (Redacted) Consultation Response
21/07/2014 22:08:58 REVISED LANDSCAPING Revised Drawing
21/07/2014 22:08:57 REVISED DETAILED ELEV 3 Revised Drawing
21/07/2014 22:08:56 REVISED DETAILED ELEV 2 Revised Drawing
21/07/2014 22:08:55 REVISED DETAILED ELEV 1 Revised Drawing
21/07/2014 22:08:54 REVISED SECTIONS Revised Drawing
21/07/2014 22:08:53 REVISED GARDEN ELEVATIONS Revised Drawing
21/07/2014 22:08:52 REVISED EAST WEST ELEVATIONS Revised Drawing
21/07/2014 22:08:51 REVISED NORTH SOUTH ELEVATIONS Revised Drawing
21/07/2014 22:08:51 REVISED 7TH FLOOR AND ROOF Revised Drawing
21/07/2014 22:08:50 REVISED 5TH AND 6TH FLOOR Revised Drawing
21/07/2014 22:08:49 REVISED GROUND FLOOR Revised Drawing
21/07/2014 21:34:24 REVISED ACCOM SCHEDULE SUMMARY REV J Revised Drawing
21/07/2014 21:34:24 REVISED ACCOM SCHEDULE REV J Revised Drawing
21/07/2014 21:34:23 REVISED 3RD AND 4TH FLOOR PLANS Revised Drawing
21/07/2014 21:34:22 REVISED 1ST AND 2ND FLOOR PLANS Revised Drawing
21/07/2014 21:34:22 REVISED AIR QUALITY ASSESSMENT Revised Drawing
21/07/2014 21:34:20 REVISED ENERGY ASSESSMENT Revised Drawing
21/07/2014 21:27:04 Revised Drawing Revised Drawing
26/06/2014 20:04:58 TRANSPORT STATEMENT & TRAVEL PLAN Supporting Documents
26/06/2014 20:04:57 SECTION EE Drawing
26/06/2014 20:04:57 ELEVATION ON EXISTING ESCAPE STAIRS TO ROUNDHOUSE Drawing
26/06/2014 20:04:56 GROUND FLOOR & FOUNDATION PLAN Drawing
26/06/2014 20:04:54 SECTION AA SHOWING PARTY WALL INTERFACE DETAILS Drawing
26/06/2014 20:04:51 ACOUSTIC ASSESSMENT Supporting Documents
26/06/2014 20:04:50 ARBORICULTURAL IMPACT ASSESSMENT Supporting Documents
26/06/2014 20:04:49 HERITAGE ENGINEERING STATEMENT Supporting Documents
26/06/2014 20:04:47 CONSULTATION STATEMENT Supporting Documents
26/06/2014 20:04:46 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 5 Supporting Documents
26/06/2014 20:04:45 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 4(4) Supporting Documents
26/06/2014 20:04:44 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 4(3) Supporting Documents
26/06/2014 20:04:42 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 4(2) Supporting Documents
26/06/2014 20:04:41 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 4(1) Supporting Documents
26/06/2014 20:04:39 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 3 Supporting Documents
26/06/2014 20:04:38 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 2 Supporting Documents
26/06/2014 20:04:37 FLOOD RISK ASSESSMENT & SUSTAINABLE DRAINAGE STRATEGY - PART 1 Supporting Documents
26/06/2014 20:04:36 ENERGY AND SUSTAINABILITY ASSESSMENT Supporting Documents
26/06/2014 20:04:36 COVER LETTER Correspondence
26/06/2014 20:04:35 CODE FOR SUSTAINABLE HOMES PRE-ASSESSMENT Supporting Documents
26/06/2014 20:04:34 CERTIFICATE B NOTICE ( 2) Other
26/06/2014 20:04:34 CERTIFICATE B NOTICE ( 1) Other
26/06/2014 20:04:33 BREEAM 2011 PRE-ASSESSMENT RETAIL(SUMMARY) Supporting Documents
26/06/2014 20:04:32 BREEAM 2011 PRE-ASSESSMENT RETAIL Supporting Documents
26/06/2014 20:04:31 BREEAM OFFICE SUMMARY Supporting Documents
26/06/2014 20:04:30 BREEAM 2011 NEW CONSTRUCTION PRE-ASSESSMENT OFFICE Supporting Documents
26/06/2014 20:04:29 Application Form Application Form
26/06/2014 20:04:28 CONSTRUCTION MANAGEMENT PLAN Supporting Documents
26/06/2014 20:04:27 AFFORDABLE HOUSING STATEMENT Supporting Documents
26/06/2014 20:04:26 ECOLOGY REPORT Supporting Documents
26/06/2014 20:04:26 HERITAGE APPRAISAL Supporting Documents
26/06/2014 20:04:25 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 3(VI) Supporting Documents
26/06/2014 20:04:24 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 3(V) Supporting Documents
26/06/2014 20:04:22 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 3(IV) Supporting Documents
26/06/2014 20:04:19 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 3(III) Supporting Documents
26/06/2014 20:04:16 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 3(II) Supporting Documents
26/06/2014 20:04:15 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 3(I) Supporting Documents
26/06/2014 20:04:14 GEOTECHNICAL CONTAMINATED LAND ASSESSMENT - PART 2 Supporting Documents
26/06/2014 20:04:11 DESIGN AND ACCESS STATEMENT COVER Supporting Documents
26/06/2014 20:04:08 PART 13 Design and Access Statement
26/06/2014 20:04:06 PART 12 Design and Access Statement
26/06/2014 20:04:04 PART 11 Design and Access Statement
26/06/2014 20:04:02 PART 10 Design and Access Statement
26/06/2014 20:04:00 PART 9 Design and Access Statement
26/06/2014 20:03:58 PART 8 Design and Access Statement
26/06/2014 20:03:55 PART 7 Design and Access Statement
26/06/2014 20:03:53 PART 6 Design and Access Statement
26/06/2014 20:03:51 PART 5 Design and Access Statement
26/06/2014 20:03:48 PART 4 (II) Design and Access Statement
26/06/2014 20:03:45 PART 4 (I) Design and Access Statement
26/06/2014 20:03:42 PART 3 Design and Access Statement
26/06/2014 20:03:40 PART 2 OF PART 2 Design and Access Statement
26/06/2014 20:03:38 PART 2 OF PART 1 Design and Access Statement
26/06/2014 20:03:37 PART 1 Design and Access Statement
26/06/2014 20:03:36 AIR QUALITY ASSESSMENT Supporting Documents
26/06/2014 20:03:35 PLANNING STATEMENT Supporting Documents
26/06/2014 20:03:33 Supporting Documents Supporting Documents
26/06/2014 20:03:33 REFURBISHMENT FEASILITY REPORT Supporting Documents
26/06/2014 20:03:31 DAYLIGHT SUNLIGHT REPORT Supporting Documents
26/06/2014 19:57:28 ISSUE SHEET - 2 Other
26/06/2014 19:57:27 ISSUE SHEET - 1 Other
26/06/2014 19:57:27 SECTIONS AND DETAILS Proposed Drawing
26/06/2014 19:57:26 SITE SHOWING PROPOSED DEMOLITION - 3 Proposed Drawing
26/06/2014 19:57:25 SITE SHOWING PROPOSED DEMOLITION - 2 Proposed Drawing
26/06/2014 19:57:25 SITE SHOWING PROPOSED DEMOLITION - 1 Proposed Drawing
26/06/2014 19:57:24 LANDSCAPING Proposed Drawing
26/06/2014 19:57:24 DETAILED ELEVATION: SHEET 3 Proposed Drawing
26/06/2014 19:57:23 DETAILED ELEVATION: SHEET 2 Proposed Drawing
26/06/2014 19:57:22 DETAILED ELEVATION: SHEET 1 Proposed Drawing
26/06/2014 19:57:21 SECTION Proposed Drawing
26/06/2014 19:57:20 GARDEN ELEVATIONS Proposed Drawing
26/06/2014 19:57:18 EAST & WEST ELEVATION Proposed Drawing
26/06/2014 19:57:17 NORTH & SOUTH ELEVATION Proposed Drawing
26/06/2014 19:57:16 CHALK FARM ROAD ELEVATION Existing & Proposed Drawing
26/06/2014 19:57:15 SEVENTH & ROOF PLANS Proposed Drawing
26/06/2014 19:57:14 FIFTH & SIXTH FLOOR PLANS Proposed Drawing
26/06/2014 19:57:12 THIRD & FOURTH FLOOR PLANS Proposed Drawing
26/06/2014 19:57:11 FIRST & SECOND FLOOR PLANS Proposed Drawing
26/06/2014 19:57:09 SITE LAYOUT & GROUND FLOOR PLAN Proposed Drawing
26/06/2014 19:57:08 BLOCK PLAN Proposed Drawing
26/06/2014 19:57:08 SECTION Existing Drawing
26/06/2014 19:57:07 EAST & WEST ELEVATIONS Existing Drawing
26/06/2014 19:57:06 NORTH & SOUTH ELEVATIONS Existing Drawing
26/06/2014 19:57:05 ROOF PLAN Existing Drawing
26/06/2014 19:57:05 THIRD & FOURTH FLOOR PLANS Existing Drawing
26/06/2014 19:57:04 FIRST & SECOND FLOOR PLANS Existing Drawing
26/06/2014 19:57:04 UPPER GROUND FLOOR PLAN Existing Drawing
26/06/2014 19:57:03 LOWER GROUND FLOOR PLAN Existing Drawing
26/06/2014 19:57:02 OS Extract OS Extract
26/06/2014 18:07:26 RESPONSE FROM LONDON UNDERGROUND Consultation Response
26/06/2014 17:53:23 LONDON UNDERGROUND INFRASTRCUTURE RESPONSE Consultation Response

Copyright Warning

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.