2017/0001/P - 176 Prince of Wales Road London NW5 3PT
|
|
2017/0002/P - 19 John Street London WC1N 2DL
|
|
2017/0003/P - Former 277a Grays Inn Road London WC1X 8OF
|
|
2017/0004/L - 19 John Street London WC1N 2DL
|
|
2017/0005/P - 29-30 King's Mews London WC1N 2JB
|
|
2017/0006/P - 28 Fellows Road London NW3 3LH
|
|
2017/0007/P - 20-21 King's Mews London WC1N 2JB
|
PDF
|
1 x comment (Redacted)
|
|
EN17/0001 - 1 Gayton Crescent London NW3 1TT
|
|
EN17/0002 - 47 - 48 Hatton Garden London EC1N 8EX
|
|
2017/0009/P - BT Tower 60 Cleveland Street London W1T 4JZ
|
PDF
|
1 x response
|
|
2017/0011/L - 22 Church Row London NW3 6UP
|
PDF
|
1 x response (Cllr Berry)
|
PDF
|
Decision Notice
|
PDF
|
DEC listed bldg approval (2016-4672-L)
|
PDF
|
Final Decision Notice
|
|
2017/0012/INVALID - 172 Royal College Street London NW1 0SP
|
PDF
|
14 - Energy Assessment
|
PDF
|
15 - M&E Report
|
PDF
|
16 - BREEAM Report
|
PDF
|
17 - Statement of Need
|
PDF
|
18 - Service Management Plan
|
PDF
|
19 - Construction Management Plan
|
PDF
|
20 - CIL Form
|
PDF
|
01 - Schedule PWR1 Application Material
|
PDF
|
02 - Application Covering Letter
|
PDF
|
04 - Site Location Plan
|
PDF
|
05 - Schedule PWR2 Application Drawings
|
PDF
|
06 - Application Drawings - Demolition
|
PDF
|
07 - Design and Access Statement_Part1
|
PDF
|
07 - Design and Access Statement_Part2
|
PDF
|
07 - Design and Access Statement_Part3
|
PDF
|
07 - Design and Access Statement_Part4
|
PDF
|
07 - Design and Access Statement_Part5
|
PDF
|
09 - Heritage Statement
|
PDF
|
10 - Part 01 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 02 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 03 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 04 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 05 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 06 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 07 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 08 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 09 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 10 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 11 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 12 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 13 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 14 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 15 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 16 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 17 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 18 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 19 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 20 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 21 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 22 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 23 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
10 - Part 24 - PB-1691-BIA00 - 176 Prince of Wales Road - Basement Impact Assessment [REV0]
|
PDF
|
11 - Daylight and Sunlight Assessment
|
PDF
|
12 - Noise Assessment
|
PDF
|
13 - Thermal Cooling Analysis
|
PDF
|
Consultation response
|
PDF
|
ApplicationFormNoPersonalData
|
PDF
|
Construction Management Plan
|
PDF
|
Superseded (Design and Access Statement)
|
PDF
|
Superseded (Design & Access Statement (2 of 2)
|
PDF
|
Door & Window Schedule
|
PDF
|
Drawing Issue Sheet
|
PDF
|
Photographic Room Survey
|
PDF
|
Covering Letter
|
PDF
|
Energy & Sustainability Statement
|
PDF
|
3 x responses (Redacted)
|
PDF
|
1 x response
|
PDF
|
ApplicationForm
|
MSG
|
Roller shutter
|
PDF
|
Location Plan
|
MSG
|
London Underground Response - add condition
|
PDF
|
1 x response (Redacted)
|
PDF
|
1 x response (Redacted)
|
PDF
|
1 x response (Redacted)
|
DOC
|
TREE DEC S.211 no obj
|
PDF
|
Letter from Iceni Projects dated 17/10/15 in relation to Condition 9(b) (Ground Contamination)
|
PDF
|
Iceni Projects - Section 73 Supporting Statement dated December 2016
|
PDF
|
CIL Form
|
PDF
|
Letter from XC2 Energy dated 25/02/2016 - SUDs Proposal
|
PDF
|
Acoustic Report dated 26/06/2014
|
PDF
|
Acoustic Tricle Vent Details
|
PDF
|
1_529-A-PL-470 - Roof Plan
|
PDF
|
1 x response (Redacted)
|
PDF
|
Landscape Report - Part 1 of 5
|
PDF
|
Landscape Report - Part 2 of 5
|
PDF
|
Landscape Report - Part 3 of 5
|
PDF
|
Landscape Report - Part 4 of 5
|
PDF
|
Landscape Report - Part 5 of 5
|
PDF
|
2 x responses (Redacted)
|
PDF
|
Decision Notice 2015/2283/P - Conditions 6 (landscaping), 21 (living roofs) and 22 (ecology) dated 13/08/2015
|
PDF
|
Decision Notice 2015/4118/P - Condition 17 (Piling) dated 09/10/2015
|
PDF
|
Preliminary Residential Internal Building Fabric Report 20890/IBF
|
PDF
|
Letter from Iceni Projects dated 24/10/14 in relation to Condition 27 (Trees)
|
PDF
|
Public Access Plan dated February 2015
|
PDF
|
Letter from Iceni Projects dated 16/04/15 in relation to Conditions 6 (Landscaping), 21 (Living roofs) and 22 (Habitat Management Plan)
|
PDF
|
Letter from Iceni Projects dated 27/04/15 in relation to Condition 9 (Ground contamination)
|
PDF
|
Letter from Iceni Projects dated 20/05/15 in relation to Conditions 20 (Apointment of Engineer) and 26 (Scheme of Implementation)
|
PDF
|
Letter from Iceni Projects dated 28/05/15 in relation to Condition 10 (Cycle storage) and 24 (Noise)
|
PDF
|
Letter from Iceni Projects dated 15/07/15 in relation to Condition 17 (piling)
|
PDF
|
Planting and maintenance specification Report Rev A (19.11.16)
|
PDF
|
2016.6432.T
|
PDF
|
4 x responses (Redacted)
|
PDF
|
Bin_store_detail-02
|
PDF
|
Heath & Hampstead response
|
PDF
|
Risk Management Strategy - Part 1 of 2
|
PDF
|
Risk Management Strategy - Part 2 of 2
|
PDF
|
Signed Deed of Appointment dated 19/05/15
|
PDF
|
St Pancras Place - JLL planning letter dated 21/10/16
|
PDF
|
Thames Water Asset Location Search
|
PDF
|
Thames Water Sewer Flooding History
|
PDF
|
8598/01 Rev C Tree Protection Plan
|
PDF
|
Habitat Management Plan - Part 1 of 2
|
PDF
|
Habitat Management Plan - Part 2 of 2
|
PDF
|
Application Form (No Personal Data)
|
PDF
|
Risk Assessment & Method Statement CFA Loadbearing Piles @ Grays Inn Road
|
PDF
|
Decision Notice 2014/6798/P - Condition 27 (tree protection) dated 13/04/2015
|
PDF
|
Decision Notice 2015/2874/P - Conditions 20 (apointment of qualified engineer) and 26 (basement works method statement/report) dated 05/08/2015
|
PDF
|
Decision Notice 2015/3091/P - Condition 24 (Acoustic Report) dated 17/08/2015
|
PDF
|
Decision Notice 2015/6011/P - Condition 9 (b) (Remediation) dated 05/02/2016
|
PDF
|
Ground Investigation Report
|
PDF
|
Structural Design Statement - Part 1 of 6
|
PDF
|
REVISION 1608-L-172_REV-G_Proposed-Landscape-Plan
|
PDF
|
Structural Design Statement - Part 2 of 6
|
PDF
|
Structural Design Statement - Part 3 of 6
|
PDF
|
Structural Design Statement - Part 4 of 6
|
PDF
|
Structural Design Statement - Part 5 of 6
|
PDF
|
Structural Design Statement - Part 6 of 6
|
PDF
|
L1706-S-17-005 Rev 02 General Arrangement of Piling
|
PDF
|
Letter from Pringuer-James Consulting Engineers dated 19/05/2015
|
PDF
|
Phase 2a Site Investigation and GQRA - Part 1 of 2
|
PDF
|
Phase 2a Site Investigation and GQRA - Part 2 of 2
|
PDF
|
Application Form
|
PDF
|
Covering Letter
|
PDF
|
ApplicationFormNoPersonalData
|
PDF
|
Existing Site Plan
|
PDF
|
Proposed Side Elevation
|
PDF
|
Supporting Statement
|
PDF
|
Approved ground floor plan
|
PDF
|
Approved roof plan
|
PDF
|
Approved rear and side elevation
|
PDF
|
Aproved front and side elevation
|
PDF
|
Photo montage
|
PDF
|
Existing ground floor plan
|
PDF
|
Existing roof plan
|
PDF
|
Existing side and rear elevation
|
PDF
|
Existing front and side extension
|
PDF
|
Site plan
|
PDF
|
Proposed ground floor plan
|
PDF
|
Proposed roof plan
|
PDF
|
Proposed rear and side elevation
|
PDF
|
Legal Agreement 49-53 Caversham Road
|
PDF
|
Jeffreys Street Garages - Programme 7- CMP part
|
DOCX
|
CMP - Jeffreys St Garages - TRACKED RJL 19.07.16
|
PDF
|
Proforma Revision ref 64 Charlotte Street CMP
|
DOCX
|
CMP- Camden Proforma 64 Charlotte Street
|
PDF
|
A870-FJA-CMP-APPENDIX C.1-Phase1-SweptPathAnalysis
|
PDF
|
A870-FJA-CMP-APPENDIX C.2
|
PDF
|
A870-FJA-CMP-APPENDIX C.3.1-Phase2-SweptPathAnalysisWiderNewtork
|
PDF
|
A870-FJA-CMP-APPENDIX C.4-Phase2-SweptPathAnalysis
|
PDF
|
A870-FJA-CMP-B1-V1-SUB1-050716
|
PDF
|
A870-FJA-CMP-APPENDIX A
|
PDF
|
A870-FJA-CMP-APPENDIX B
|
DOCX
|
CMP for Lyndhurst Road 31.10.16 rev A after LB of Ccomments, GB
|
PDF
|
Historic England response
|
PDF
|
Historic England authorisation
|
PDF
|
See reference 2016/4212/P for related documents
|
PDF
|
Proposed front and side elevations
|
PDF
|
2016.6468.T
|
PDF
|
Application Form - No Personal Data
|
PDF
|
Cover Letter
|
PDF
|
D_07 Demolition Rear (East) Elevation
|
PDF
|
D_09 Demolition Section AA
|
PDF
|
D_10 Demolition Section BB
|
PDF
|
L1528412_505 Rev T1_A Section
|
PDF
|
P_01 Demolition & Proposed Ground Floor
|
PDF
|
P_02 Demolition & Proposed Basement Floor Plan
|
PDF
|
P_07 Proposed Rear (East) Elevation
|
PDF
|
P_09 Proposed Section AA
|
PDF
|
P_10 Proposed Section BB
|
PDF
|
SUDS Report - Appendix 3 - MicroDrainage Calcs
|
PDF
|
1 x response (Redacted)
|
PDF
|
REVISION 1608-L-170_REV-D_Proposed-Front-Elevations
|
PDF
|
REVISION 1608-L-169_REV-D_Proposed-Side-Elevation
|
PDF
|
REVISION 1608-L-167_REV-D_Proposed-Section-AA
|
PDF
|
Basement Impact Audit - Campbell Reith Dec 2016
|
PDF
|
REVISION 1608-L-162_REV-B_Proposed-Ground-Floor-Plan
|
PDF
|
REVISION 1608-L-161_REV-B_Proposed-Basement-Plan
|
PDF
|
REVISION 1608-L-160_REV-D_Proposed-Site-Plan
|
PDF
|
REVISION 1608-L-181_REV-B_Proposed-Bin-Store
|
PDF
|
REVISION 1608-L-180_REV-B_Proposed-Bike-Store
|
PDF
|
2016.6435.T
|
PDF
|
Belsize CAAC response (Redacted)
|
PDF
|
APPENDIX 3-A_revA
|
PDF
|
APPENDIX 3-B_revA
|
PDF
|
TFL Response
|
PDF
|
Decision Notice
|
PDF
|
Earlham Street MB Pack Final
|
DOCX
|
Camden CMP Pro Forma LIVE DOC part 1
|
PDF
|
CMP-2016-08-26 [Final3]
|
PDF
|
2x Responses (Redacted)
|
PDF
|
Caac's Response (Redacted)
|
PDF
|
1x Response (Redacted)
|
PDF
|
4x Responses (Redacted)
|
PDF
|
1x Response
|
PDF
|
Cover Letter (Redacted)
|
PDF
|
Application Form (Redacted)
|
PDF
|
Dish & Equipment Schedules
|
PDF
|
Proposed Plans
|
PDF
|
Site Location Plan
|
PDF
|
Cover Letter (Redacted)
|
PDF
|
Application Form
|
DOCX
|
Design and Access Statement
|
PDF
|
Location Plan
|
PDF
|
Site plan
|
PDF
|
Balcony Stone Replacement 1
|
PDF
|
Balcony Stone Replacement 2
|
PDF
|
Roof Light Replacement 1
|
PDF
|
Design & Access Statement (Redacted)
|
PDF
|
Roof Light Replacement 2
|
|
2017/0013/P - Garden Flat 62 Belsize Park Gardens London NW3 4NE
|
PDF
|
(Superseded) Demolition plans and elevation drawings
|
PDF
|
(Superseded) Proposed plans and elevation drawings
|
PDF
|
(SUPERSEDED) Design Access Statement
|
PDF
|
(Superseded) Existing floor plans and elevations
|
PDF
|
(SUPERSED) 087_001_OS Plan_.pdf
|
PDF
|
(Superseded) Application Form
|
PDF
|
Application Form (Redacted)
|
|
2017/0014/P - Belvard Point 17 Murray Street London NW1 9RE
|
PDF
|
Proposed roof plan
|
PDF
|
Proposed ground floor plan
|
JPG
|
344_External Materials.jpg
|
PDF
|
Bike Storage Details
|
PDF
|
Sedum blanket technical summary
|
PDF
|
Maintenance schedule of Sedum blanket
|
PDF
|
Application Form
|
PDF
|
2016.6338.T
|
PDF
|
2016.6441.T
|
PDF
|
2016.6692.T
|
|
EN17/0003 - 6 Percy Street London W1T 1DQ
|
PDF
|
11-12 Grenville St Pre-App Response 2014
|
MSG
|
UPDATED Drawing Register
|
PDF
|
ALL PROPOSED DRAWINGS
|
DOC
|
Decision Notice
|
PDF
|
All Existing Drawings
|
PDF
|
(Superseded) Construction Method Plan
|
PDF
|
FDN
|
|
2017/0016/P - Eleanor Palmer Primary School Lupton Street London NW5 2JA
|
PDF
|
2016.6677.T
|
PDF
|
2016.6676.T
|
PDF
|
A3_PR1386 - plan and section (roof 1)
|
PDF
|
A3_PR1386 - plan and section (roof 2)
|
PDF
|
A3_PR1386 - plan and section (roof 3)
|
PDF
|
A3_PR1386 - site & roof location plan
|
PDF
|
Product specification document
|
PDF
|
Cover letter
|
PDF
|
Site location plan
|
PDF
|
Application form (Redacted)
|
PDF
|
Council Own form (Redacted)
|
|
EN17/0004 - 101 Brecknock Road London N7 0DA
|
PDF
|
Existing and Proposed Sections
|
PDF
|
Existing and Proposed Ground Floor Plans and Rear and Side Elevations
|
PDF
|
1415-PL-ST-802- Second Floor Site Plan(2)
|
PDF
|
1415-PL-GA-B-603- Building B Third Floor Plan(2)
|
PDF
|
SUPERSEDED 1415-PL-GA-B-602- Building B Second Floor Plan(2)
|
PDF
|
SUPERSEDED 1415-PL-ST-803- Third Floor Site Plan(2)
|
PDF
|
Application Form (Redacted)
|
PDF
|
117 Priory Road - previously approved drawings
|
PDF
|
Decision Notice
|
PDF
|
Decision Notice
|
|
2017/0017/NEW - 14 Bedford Row London WC1R 4ED
|
PDF
|
P3457-01 rev A - elevations & plans
|
PDF
|
Site Location Plan
|
PDF
|
External Lighting Installation Locations
|
PDF
|
Basement & Ground Floor Plans
|
PDF
|
First Floor Plans
|
PDF
|
Fourth Floor Plans
|
PDF
|
Second Floor Plans
|
PDF
|
Third Floor Plans
|
PDF
|
Final Decision Notice
|
PDF
|
FDN - 7 New End - 2016.5751.P
|
PDF
|
Site Location Plan and Existing Ground Floor Plan
|
PDF
|
Final Decision Notice
|
PDF
|
Application Form (Redacted)
|
PDF
|
mvmt112
|
|
2017/0018/L - 3-4 Guilford Place London WC1N 1EA
|
PDF
|
mvmt112
|
JPG
|
GRP slate
|
PDF
|
CTIL 145761_TEF 46236_VF 80332_Planning Drawing_E(2)
|
|
2017/0019/P - 23 Crediton Hill London NW6 1HS
|
PDF
|
ST620-03 - elevations, plans & section
|
PDF
|
ST620-01 - site & location plan
|
PDF
|
Application Form - see 2016/6425/P for documents
|
PDF
|
7 New End - MB pack
|
PDF
|
Members Briefing Pack
|
PDF
|
581197-SK.20160531-P2-Piles_and_TW_Plan THAMES WATER ASSET
LOCATIONS & PILE LAYOUT
|