Related Documents

Summary

75

Application Documents

The links below are to PDF files. To view PDFs you need to download and install Adobe Acrobat Reader onto your computer. Help for people with visual disabilities: The files contained scanned documents that cannot be read by screen readers. If this is a problem for you please use the Planning online support form to request an alternative format.


Drawings can be large files. The quality of the image depends on the quality of the original submission.


Title
PDF
Youth Space Vision Document FINAL
PDF
Transport Technical Note
PDF
Proposed West Elevation_P1(2)
PDF
GROUND FLOOR PLAN - MASTERPLAN DRAWINGS TENURE_P1(2)
PDF
SECTIONS CC & DD - MASTERPLAN DRAWINGS SECTIONS_P1(2)
PDF
SECTIONS EE & FF - MASTERPLAN DRAWINGS SECTIONS_P1(2)
PDF
Bay Study - North Facade_P1(2)
PDF
Bay Study - East Facade_P1(2)
PDF
Proposed Section AA_P1(2)
PDF
Proposed Section BB_P1(2)
PDF
Proposed Section CC_P1(2)
PDF
Proposed Section DD_P1(2)
PDF
Proposed Site Section AA_P1(2)
PDF
Proposed Site Section BB_P1(2)
PDF
Proposed Site Elevation - North_P1(2)
PDF
_Proposed North Elevation_P1(2)
PDF
Proposed South Elevation_P1(2)
PDF
Proposed East Elevation_P1(2)
PDF
EV Charging Station - Outline Management Framework FINAL
PDF
Vehicle Circulation Plan
PDF
Juniper Building Landscape Proposal
PDF
Landscape General Arrangement
PDF
Landscape Hardworks Plan
PDF
Landscape Softworks Plan
PDF
Tree Planting Strategy
PDF
Tree Retention and Removal Strategy
PDF
Landscape Sections 4
PDF
Existing and Proposed Drawings
PDF
Proposed Roof Plan_P1
PDF
Existing Location Plan_P1
PDF
ApplicationFormRedacted
PDF
Air Quality Technical Note FINAL
PDF
BREEAM Pre-Assessment Report FINAL
PDF
CIL Additional Information Form FINAL
PDF
CIL Covering Letter FINAL
PDF
Consultation Statement FINAL
PDF
Cover Letter FINAL
PDF
Design and Access Statement
PDF
Detailed Circular Economy Statement FINAL
PDF
Energy Strategy Addendum FINAL
PDF
Environmental Implications Letter Part 1 FINAL
PDF
Environmental Implications Letter Part 2 FINAL
PDF
Environmental Implications Letter Part 3 FINAL
PDF
Environmental Implications Letter Part 4 FINAL
PDF
Fire Statement FINAL
PDF
Gateway 1 Form FINAL
PDF
Heritage Statement Addendum FINAL
PDF
Noise Assessment Addendum FINAL
PDF
Planning Statement FINAL
PDF
Sustainability Strategy FINAL
PDF
transport Statement FINAL_Part1
PDF
Transport Statement FINAL_Part2
PDF
Whole Life-Cycle Carbon Assessment FINAL
PDF
Granted proposed plans: Phase 1A (as built) - Temporary store
PDF
Granted proposed plans: Phase 1B - permanent PFS building ref. 2017/3847/P
PDF
Natural England response 1x
PDF
HS2 response x1 (Redacted)
PDF
historic England response x1
PDF
GLA response x1
PDF
1 x (natural england) response
PDF
1 x response (TFL infrastructure)
PDF
Regents Canal CAAC Objection
XLSX
WLCA_GLA_ReportingTemplate
PDF
1 x Response (Redacted)
PDF
CGY Fourth Planning Permission - 2022.3646.P
PDF
Camden Goods Yard - Third Complete DOV (Redacted)
PDF
Final Decision Notice 2022.3646.P
PDF
CGY-MAK-XX-00-DR-A-00-050 - Ground Floor Masterplan P2
PDF
Revised CGY-MAK-XX-ZZ-DR-A-06-304_Proposed West Elevation_P2
PDF
Revised CGY-MAK-XX-ZZ-DR-A-06-203 - Proposed Section DD_P2
PDF
Revised CGY-MAK-XX-00-DR-A-06-161_Proposed Ground Floor Mezzanine Plan_P2
PDF
revised CGY-MAK-XX-00-DR-A-06-160_Proposed Ground Floor Plan_P2
PDF
revised CGY-MAK-XX-00-DR-A-02-150 - Proposed Site Plan_P2
XLSX
Revised WLCA GLA_ReportingTemplate
PDF
Revised whole life carbon assessment

Copyright Warning

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.