Related Documents

Summary

90

Application Documents

The links below are to PDF files. To view PDFs you need to download and install Adobe Acrobat Reader onto your computer. Help for people with visual disabilities: The files contained scanned documents that cannot be read by screen readers. If this is a problem for you please use the Planning online support form to request an alternative format.


Drawings can be large files. The quality of the image depends on the quality of the original submission.


Title
PDF
Financial Viability Assessment Executive Summary 26.11.20
PDF
Health Impact Assessment
PDF
Heritage Statement and TVIA 24 November 2020
PDF
Parameter Plans
PDF
Planning Statement
PDF
Plant Noise Assessment
PDF
Proposed Drawings Outline 13538-A-04
PDF
Site Plan + Location Plan 13538-A-03
PDF
Statement of community involvement
PDF
Structural report Large File
PDF
Surface Water Drainage Statement
PDF
Sustainability Statement - Outline Application 201120
PDF
Transport Assessment
PDF
Tree Schedule 200914-PD-10
PDF
Tree Survey 200914-P-10
PDF
Viability submission - 261120
PDF
Workplace Travel Plan
PDF
Access Statement
PDF
Air Quality Assessment
PDF
Application Cover Letter
PDF
ApplicationFormRedacted
PDF
Archaeology desk based assessment DBA v2 11-11-2020
PDF
Construction Management Plan Appendices
PDF
Construction Management Plan Proforma
PDF
Daylight sunlight Report
PDF
Demolition Drawings 13538-A-02
PDF
Design & Access Statement Large File
PDF
Development Specification
PDF
Ecology Report
PDF
Existing Drawings with revised ground floor 13538-A-01
PDF
Pre-app Design Feedback Network and Tottenham Mews 19th june 2020
PDF
Combined pre-app advance details 190116_13538
PDF
Strategic Panel Notes issued 23 sept 2019
PDF
Design Review Panel Report 200911_FR_Network Building
DOCX
Crossrail Response
DOC
1 x Response - HE
MSG
1 x Response - Thames Water
PDF
Rees Response
PDF
Initial report of Independent Audit of Basement Impact Assessment (author: Campbell Reith)
PDF
Letter from AKT-II re RM02
PDF
BIA comment tracker by CGL 09528 24.02.21-1
PDF
Network - Basement Plan
PDF
Network - Sections
PDF
Revised Design & Access Statement including Design Guidelines
XLSX
Office Life Science- Stage 2 WLCA comments (2021.08.23)
PDF
Fire Statement v 3 (Appendix 1 in Response to GLA Stage 1)
PDF
Schedule of Applicants response to GLA Stage 1 Report Network Building Issued 01.04.21
PDF
Appendix 3 N01-AS-London Underground Trip Distribution Note (210317)
PDF
Appendix 2 : Circularity Strategy (Table 1 of completed GLA Circular Economy Guidance)
PDF
Response to GLA: Appendix 2 Network Building - Lab GLA CE Guidance Appendix C
PDF
Response to GLA: Appendix 2 Network Building - Office GLA CE Guidance Appendix C
PDF
TFT_Piercy & Co Mail - Network Urban Green Factor
PDF
Rooftop UGF 13538-A-P-L09-LEVEL 09_UGF
PDF
Revised Surface Water Drainage Statement 2170754-EWP-ZZ-XX-RP-C-0001-P2
PDF
Arboricultural Impact Assessment 200914-PD-11
PDF
Basement Impact Assessment Audit by Campbell Reith (CBemb 13398-74 190521 Network Building-F1)
PDF
Financial Viability Appraisal update
XLSX
GLA WLC Template_TNB Office_V4_TFT
PDF
1 x Response CSA (Redacted)
XLSX
GLA_WLC_assessment_template_TFT_v4 Life Science
PDF
Schedule of Applicants response GLA Stage 1 Report Network Building Issued 01.04.21
PDF
Appendix 3 to GLA note N01-AS-London Underground Trip Distribution Note (210317)
PDF
Revised Development Specification 28 May 2021 V2
JPG
LVMF Winter Zoom update 3508_LVMF 2B1_200mm_EP_FullRes_280521
JPG
LVMF Winter Zoom update 3508_LVMF 2B1_200mm_E_Corridor_FullRes_280521
JPG
LVMF Winter Zoom update 3508_LVMF 2B1_200mm_E_FullRes_280521
JPG
LVMF Winter Zoom update 3508_LVMF 2B1_200mm_EP_Corridor_FullRes_280521
PDF
1 x Response - Objection - Charlotte Street (Redacted)
PDF
Wire Line images of views of BT tower 20 april 2021
PDF
Committee Report 30 June 2021. Item 3. Network Outline Report incl Appendix A updated 16 june
PDF
WLC considerations Pre-app July20
PDF
Revised Fire Statement v3 (in Response to GLA Stage 2 referral)
XLSX
Updated Circular Economy Memo_ Stage required by GLA in Stage 2 Referral
PDF
Network Building FDN 2020 5624 P
PDF
Network Building Completed S106
MSG
Energy (IV, Part a) - Schedule 3, Part 5- Be Seen spreadsheet
PDF
CMP- Construction Management Plan revised
MSG
1 x response Charlotte Street Assoc
PDF
Network Building - Development Delivery Plan Letter
PDF
CMP ADDENDUM 1 - Network Building Traffic & Logistics Protochol Enhancements JUNE 2023
PDF
CMP ADDENDUM Appendix A - Network Building Booking in Form
PDF
CMP ADDENDUM Appendix B - Network Building Drivers Information Card - Site Deliveries
PDF
CMP ADDENDUM Appendix C - Network Building Drivers Information Card - Leaving the Site
PDF
CMP ADDENDUM Appendix D - Network Building Weekly Vehicle Tracking Report
PDF
Network Building - Extension to working hours form (Planing Ref 2020.5624.P)
PDF
Network & Tottenham Mews - Development Delivery Plan Q4 2023 v2.0
ZIP
CMP Addendum B- Network Building 95-100 Tottenham Court Road
000039297-S106_Discharge_Notice_-_DP9 - CMP
PDF
000039297-S106_Discharge_Notice_-_DP9(2)
PDF
CMP Request for Extension of Working Hours 26.04.24

Copyright Warning

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.