Related Documents

Summary

90

Application Documents

The links below are to PDF files. To view PDFs you need to download and install Adobe Acrobat Reader onto your computer. Help for people with visual disabilities: The files contained scanned documents that cannot be read by screen readers. If this is a problem for you please use the Planning online support form to request an alternative format.


Drawings can be large files. The quality of the image depends on the quality of the original submission.


Title
PDF
superseded 39 Fitzjohns Tree Protection Plan April18
PDF
superseded 39 Fitzjohns Tree Survey and AMS April 2018
PDF
2018.05.01 BREEAM Pre-Assessment 39 Fitzjohns Avenue
PDF
2018.05.01 Energy and Sustainability Statement 39 Fitzjohns Avenue
PDF
superseded 3169 D_A Statement April 2018-min
PDF
3686 39 Fitzjohns Avenue. Planning Application Basement Impact Assessment 03-05-18 rev e-min
PDF
20180411_12470_Sunlight Daylight
PDF
ApplicationFormNoPersonalData
PDF
Covering Letter 39 Fitzjohns Avenue
PDF
Existing Plans-Elevations-East-North
PDF
Proposed Plans-Elevations-East-North st
PDF
Existing Plans-Elevations-West-South
PDF
Superseded Proposed Plans-Elevations-West-South
PDF
Existing Plans-First Floor
PDF
Existing Plans-Lower Ground Floor
PDF
Existing Plans-Raised Ground Floor
PDF
Existing Plans-Roof Floor
PDF
Existing Plans-Second Floor
PDF
superseded Proposed Plans-First Floor
PDF
superseded Proposed Plans-Garden Level
PDF
superseded Proposed Plans-Lower Ground Floor
PDF
superseded Proposed Plans-Raised Ground Floor
PDF
superseded Proposed Plans-Roof Level
PDF
superseded Proposed Plans-Second Floor
PDF
superseded Proposed Plans-Third Floor
PDF
Planning Statement Fitzjohns
PDF
R02-Transport Statement - 2018-05-01
PDF
Existing Plans-Sections
PDF
superseded Proposed Plans-Sections
PDF
Site plan-Existing
PDF
Site plan-Location plan(1)
PDF
Site plan-Proposed
PDF
superseded 180627_GEA GIA - Floorspace schedule comparison
PDF
1 x Response
PDF
1 x Response Thames Water (Redacted)
PDF
1 x Online Response (Redacted)
PDF
Basement Impact Assessment Audit Revision: D1 August 2018
PDF
Campbell Reith final audit report
PDF
Addendum to Basement Impact Assessment Ver. 1.3 - LBH4498
PDF
1x response (Historic England)
PDF
LBH Addendum to Basement Impact Assessment Ver. 1.3 - LBH4498(2)
PDF
1 x Response
PDF
Air Quality Assessment
PDF
Air Quality Mitigation 20jun19 + appendix
PDF
BREEAM Pre-Assessment 39 Fitzjohns Avenue
PDF
Energy and Sustainability Statement 2019.06.20
PDF
Revised Arb construction method statement
PDF
Demolition Construction Phase Arb report
PDF
REVISED D_A Statement JULY 2019
PDF
Superseded REVISED PROPOSED Raised Ground Floor Plan
PDF
REVISED PROPOSED Roof Plan
PDF
REVISED PROPOSED Second Floor Plan
PDF
supersed PROPOSED Site plan
PDF
REVISED PROPOSED Third Floor Plan
PDF
SUPERSEDED REVISED PROPOSED Basement Plan
PDF
SUPERSEDED FitzjohnsAvenue_Diagram_Garden Level Plan
PDF
SUPERSEDED REVISED PROPOSED First Floor Plan
PDF
SUPERSEDED PROPOSED Garden Level Plan
PDF
Fitzjohns Ave AQ Mitigation 20jun19 + appendix
PDF
39 Fitzjohns Avenue Health Impact Assessment(2)
PDF
SUDS Strategy Ver. 1.1 - LBH4498suds
PDF
Campbell Reith audit of BIA dated August 2018-D1
PDF
Revised Tree Protection Plan Construction Phase July 2019
PDF
Revised Tree Removal Plan and Demolition Phase July 2019
PDF
Demolition drawings
PDF
1:1250 Location Site Plan
PDF
Superseded Revised Proposed Site Plan
PDF
Superseded Revised Proposed Basement Level Plan
PDF
Superseded Revised Proposed Garden Level Plan
PDF
Superseded Proposed Raised Ground Floor Plan
PDF
Revised Proposed First Floor Plan
PDF
Revised proposed South-West Street Elevation
PDF
REVISED 39 Fitzjohns Avenue GEA GIA
PDF
REVISED Demolition set 24-7-19(2)
PDF
Sections proposed - mark up with land levels
PDF
Revised Site plan
PDF
Revised Basement plan
PDF
Revised Proposed Garden Level
PDF
Amended appraisal 24 July 2019
PDF
Proposed Raised Ground Floor
PDF
Letter from Cunnane Planning re basement levels (Redacted)
PDF
FV summary 39 Fitzjohns Avenue(2)
PDF
Energy Statement and AQA additional info
PDF
Revised Energy and Sustainability Statement August 2019
PDF
BPS Addendum Report August 2019
PDF
LBH Wembley letter to Camden 06.08.2019
PDF
Committee Report
PDF
Final Decision Notice(2)
PDF
scan_camhm049_2022-03-30-15-16-10(3) (Redacted)
PDF
scan_camhm049_2022-03-30-15-20-12(4)

Copyright Warning

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.