PDF
|
A1 Site Plan.pdf
|
PDF
|
A1 LocationPlan_included_in_SiteandOtherPlans.pdf
|
PDF
|
A1 Application Form (No Personal Data)
|
PDF
|
A9 Basement Impact Assessment Part 2 of 3
|
PDF
|
A9 Basement Impact Assessment Part 3 of 3
|
PDF
|
A10 Construction Management Plan LBC Pro Forma
|
PDF
|
A11 Construction Management Plan
|
PDF
|
A12 Economic and Regeneration Impact Statement
|
PDF
|
A13 Framework Travel Plan Part 1 of 2
|
PDF
|
A13 Framework Travel Plan Part 2 of 2
|
PDF
|
A14 Health Impact Assessment
|
PDF
|
A15 Noise and Vibration Impact Assessment
|
PDF
|
A16 Pre-Development Arboricultural Survey
|
PDF
|
A17 Preliminary Bat Roost Assessment
|
PDF
|
A18 Preliminary Ecological Assessment
|
PDF
|
A19 Servicing Management Plan Part 1 of 1
|
PDF
|
A19 Servicing Management Plan Part 2 of 2
|
PDF
|
A20 Statement of Community Involvement Part 1 of 3
|
PDF
|
A20 Statement of Community Involvement Part 2 of 3
|
PDF
|
A20 Statement of Community Involvement Part 3 of 3
|
PDF
|
A21 Sus Design & Constr Vol 1 - Main Report
|
PDF
|
A21 Sus Design & Constr Vol 2 Energy Statement EST48232 Issue 2 - Part 1 of 2
|
PDF
|
A21 Sus Design & Constr Vol 2 Energy Statement EST48232 Issue 2 - Part 2 of 2
|
PDF
|
A21 Sus Design & Constr Vol 3 - BREEAM Pre-Assessment
|
PDF
|
A21 Sus Design & Constr Vol 4 - Thermal Comfort
|
PDF
|
A2 CIL Form 04 07 2017
|
PDF
|
A4 Cover Letter
|
PDF
|
A5 Affordable Housing Statement
|
PDF
|
A6 Air Quality Assessment
|
PDF
|
A7 Arboricultural Impact Assessment
|
PDF
|
A8 Archaeological Desk Based Assessment Part 1 of 2
|
PDF
|
A8 Archaeological Desk Based Assessment Part 2 of 2
|
PDF
|
A9 Basement Impact Assessment Audit Form
|
PDF
|
A9 Basement Impact Assessment Part 1 of 3
|
PDF
|
BB Block B Elevations 200 to 203
|
PDF
|
BB Block B Plans 99 to 108
|
PDF
|
BB Block B residential layouts 500 to 503
|
PDF
|
BB Block B Sections 204 to 207
|
PDF
|
BC Block C bay studies 400 to 402
|
PDF
|
BC Block C north east north west elevations 203 204
|
PDF
|
BC Block C plans 100 to 110
|
PDF
|
BC Block C residential layouts 1095_03_07_500
|
PDF
|
BC Block C sections 300 to 302
|
PDF
|
BC Block C south east south west elevations 201 202
|
PDF
|
BD Block D bay studies 400 to 402
|
PDF
|
BD Block D elevations 200 to 203 and sections 300 301
|
PDF
|
BD Block D plans and resi layouts
|
PDF
|
BE1 Block E1 elevations sections
|
PDF
|
BE1 Block E1 plans gnd to roof
|
PDF
|
BE2 Block E2 bay studies 400 to 403
|
PDF
|
BE2 Block E2 elevations 200 to 203 and sections 300 301
|
PDF
|
BE2 Block E2 plans and resi layouts
|
PDF
|
BF Block F bay studies 400 to 407
|
PDF
|
BF Block F elevations 200 to 203 sections 300 to 302
|
PDF
|
BF Block F plans 100 to 109 resi layouts 500 501
|
PDF
|
BPFS PFS demolition 50 51
|
PDF
|
BPFS PFS Drawing Release Sheet 1605-IS-Planning
|
PDF
|
BPFS PFS existing drawings
|
PDF
|
BPFS PFS plans 2nd to roof
|
PDF
|
BPFS PFS plans final phase basement to 1st
|
PDF
|
BPFS PFS plans first phase gnd to 1st
|
PDF
|
BPFS PFS sections elevations final phase
|
PDF
|
BPFS PFS sections elevations first phase
|
PDF
|
B Drawings AAM Issue Sheet 1095_CGY_Issue Register
|
PDF
|
B Drawings Area Schedule
|
PDF
|
BA Block A 13508-PCO-Drawing register
|
PDF
|
BA Block A plans
|
PDF
|
BA Block A sections and elevations
|
PDF
|
BB Block B Bay studies 400 to 405
|
PDF
|
BM Masterplan Demolition plans 1095_00_07_002
|
PDF
|
BM Masterplan Existing Demolition elevations 1095_00_07_003
|
PDF
|
BM Masterplan ground floor 1095_00_07_100
|
PDF
|
BM Masterplan lower car parking (basement) 1095_00_07_098
|
PDF
|
BM Masterplan lower ground (Chalk Farm Road level) 1095_00_07_099
|
PDF
|
BM Masterplan lower ground floor 4 plans 115 to 118
|
PDF
|
BM Masterplan sections AA BB 1095_00_07_300
|
PDF
|
BM Masterplan sections DD EE 1095_00_07_301
|
PDF
|
BM Masterplan sections FF GG 1095_00_07_302
|
PDF
|
BM Masterplan sections HH 1095_00_07_303
|
PDF
|
BM Masterplan site location 1095_00_07_001
|
PDF
|
BM AAM Drawing Issue Sheet 1095_CGY_Issue Register_170706
|
PDF
|
BM Camden Yard plans and elevations 1095_00_07_200
|
PDF
|
BM Masterplan 1st floor 1095_00_07_101
|
PDF
|
BM Masterplan 2nd floor 1095_00_07_102
|
PDF
|
BM Masterplan 3rd floor 1095_00_07_103
|
PDF
|
BM Masterplan 4th floor 1095_00_07_104
|
PDF
|
BM Masterplan 5th floor 1095_00_07_105
|
PDF
|
BM Masterplan 6th floor 1095_00_07_106
|
PDF
|
BM Masterplan 7th floor 1095_00_07_107
|
PDF
|
BM Masterplan 8th floor 1095_00_07_108
|
PDF
|
BM Masterplan 9th floor 1095_00_07_109
|
PDF
|
BM Masterplan 10th floor 1095_00_07_110
|
PDF
|
BM Masterplan 11th floor 1095_00_07_111
|
PDF
|
BM Masterplan 12th floor 1095_00_07_112
|
PDF
|
BM Masterplan 13th floor 1095_00_07_113
|
PDF
|
BM Masterplan 14th floor 1095_00_07_114
|
PDF
|
A3 Planning Statement
|
PDF
|
D0 Environmental Statement Non technical Summary (high res) VERY LARGE FILE
|
PDF
|
D0 Environmental Statement Non technical Summary (low res)
|
PDF
|
D3 ES Vol 2B Built Heritage Appdx 2 Statement of Significance Listed Buildings part 2 of 3
|
PDF
|
D3 ES Vol 2B Built Heritage with Appendix 1 Heritage Asset plans part 1 of 3
|
PDF
|
D3 ES Vol 2B Built Heritage Appdices 3 to 7 part 3 of 3
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 13 to 16 Part5 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 9 to 12 Part4 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 5 to 8 Part3 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 1 to 4 Part2 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 to end Part12 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 1 to 6 Part1 of 15
|
PDF
|
D2 ES Vol2A TVIA complete VERY LARGE FILE
|
PDF
|
D2 ES Vol2A TVIA Ch 7 Views A11 to END Part15 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 7 Views A7 to A10 Part14 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 7 Views A1 to A6 Part13 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 32 to 37 Part11 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 29 to 31 Part10 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 25 to 28 Part9 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 24 Part8 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 21 to 23 Part7 of 15
|
PDF
|
D2 ES Vol2A TVIA Ch 6 Views 17 to 20 Part6 of 15
|
PDF
|
C DAS Ch6 Design Statement Block B
|
PDF
|
C DAS Ch6 Design Statement Block C
|
PDF
|
C DAS Ch6 Design Statement Block D
|
PDF
|
C DAS Ch6 Design Statement Block E1
|
PDF
|
C DAS Ch6 Design Statement Block E2
|
PDF
|
C DAS Ch6 Design Statement Block F
|
PDF
|
C DAS Ch6 Design Statement PFS LARGE FILE
|
PDF
|
C DAS Ch7 Public Realm and Landscape
|
PDF
|
C DAS Ch9 Appendix A FutureProofing
|
PDF
|
C DAS Ch9 Appendix B Lighting WhiteCode LARGE FILE
|
PDF
|
C DAS Ch9 Appendix E Fire Strategy
|
PDF
|
C DAS Ch9 Appendix F Statement of Public consultation To End LARGE FILE *Superseded*
|
PDF
|
C DAS Ch1-3 Intro Vision Site context
|
PDF
|
C DAS Ch4 Design Evolution
|
PDF
|
C DAS Ch5 Proposed Scheme Part 1 of 4 Uses
|
PDF
|
C DAS Ch5 Proposed Scheme Part 2 of 4 Layout LARGE FILE
|
PDF
|
C DAS Ch5 Proposed Scheme Part 3 of 4 Connectivity Public Spaces
|
PDF
|
C DAS Ch5 Proposed Scheme Part 4 of 4 Massing & Scale Site Wide Strategies Safer Places
|
PDF
|
C DAS Ch6 Design Statement Block A
|
PDF
|
D5 ES Vol 3B Trans Assess Traffic Survey Data Part 3 of 9
|
PDF
|
D5 ES Vol 3B Transport Assessment Appdx H I Site Layout Road Safety Audit Part 7 of 9
|
PDF
|
D5 ES Vol 3B Transport Assessment Appdx J K TRICS Data Census Data Part 8 of 9
|
PDF
|
D5 ES Vol 3B Transport Assessment Appdx L M LinSIG Results POERS Audit Part 9 of 9
|
PDF
|
D5 ES Vol 3B Trans Assess Appdx D to G Boundary Traffic Flow Injury Data WebCAT PTAL Part 6 of 9
|
PDF
|
D5 ES Vol 3B Trans Assess Appendix B parking technical notes Part 4 of 9
|
PDF
|
D5 ES Vol 3B Trans Assess Appendix C TfL Advice Letters Part 5 of 9
|
PDF
|
D5 ES Vol 3B Trans Assess Chs 1 to 10 and Figures part 1 of 9
|
PDF
|
D5 ES Vol 3B Trans Assess Drawings and Appendix A Scoping note Part 2 of 9
|
PDF
|
D4 ES Vol 3A Tech Appx 10.4 Solar Glare Assessment part 3 of 3
|
PDF
|
D4 ES Vol 3A Tech Appx 10.5 Light Pollution Assessment
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 1 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 2 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 3 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 4 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 5 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 6 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 7 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Internal daylight sunlight assessment part 8 of 8
|
PDF
|
D4 ES Vol 3A Tech Appx 11.1 Pedestrian Level Wind Microclimate Assessment
|
PDF
|
D4 ES Vol 3A Tech Appx 1.1-2.1 IEMA Quality Scoping Opinion Part 1 of 3
|
PDF
|
D4 ES Vol 3A Tech Appx 2.1 Scoping Opinion App 4 Prelim Risk Assess App 5 Viewpoints Part 3 of 3 VERY LARGE FILE
|
PDF
|
D4 ES Vol 3A Tech Appx 2.1 Scoping Opinion Archaeology Desk Assessment Part 2 of 3 LARGE FILE
|
PDF
|
D4 ES Vol 3A Tech Appx 2.3 Flood Risk assess and Surface Water Drainage Strategy LARGE FILE
|
PDF
|
D4 ES Vol 3A Tech Appx 9.1 Acoustic Term 9.2 Baseline Noise and Vibration
|
PDF
|
D4 ES Vol 3A Tech Appx 9.3 to 10.1 Traffic Flow Amenity Space Glazing Mitigation Scenarios
|
PDF
|
D4 ES Vol 3A Tech Appx 10.2 Daylight Sunlight Assessment
|
PDF
|
D4 ES Vol 3A Tech Appx 10.3 Overshadowing Assessment LARGE FILE
|
PDF
|
D4 ES Vol 3A Tech Appx 10.4 Solar Glare Assessment part 1 of 3
|
PDF
|
D4 ES Vol 3A Tech Appx 10.4 Solar Glare Assessment part 2 of 3
|
PDF
|
D1 ES Main Report Ch 5 to 10 Demo Consttuct Socio Economics Transport Air Quality Noise Daylight part 3 of 4
|
PDF
|
D1 ES Main Report Ch 11 to end Wind Microclimate Cumulative Summary of Residuals part 4 of 4
|
PDF
|
D1 ES Main Report Ch 1 to 3 Intro Methodology Alternatives part 1 of 4
|
PDF
|
D1 ES Main Report Ch 4 Proposed Development part 2 of 4
|
PDF
|
Responses #1a/1b
|
PDF
|
BL Landscape Hardworks plan P10606-00-001-102
|
PDF
|
BL Landscape sections 200 to 203
|
PDF
|
BL Landscape Softworks P10606-00-001-103
|
PDF
|
BL Landscape general arrangement P10606-00-001-101
|
PDF
|
A9a BIA extracts from LORP0004 FRA showing TWU assets
|
PDF
|
aA0 Paper Copy of application is in Primrose Hill Community Library - details attached
|
PDF
|
A22 Contextual Daylight and Density Research
|
PDF
|
Response #1
|
PDF
|
Pre-application advice
|
PDF
|
CGY: Camden Design Review Panel report from 1st session
|
PDF
|
CGY: Camden Design Review Panel report from 2nd session
|
PDF
|
CGY: Camden Design Review Panel report from 3rd session
|
PDF
|
C DAS Ch9 Appendix B Signage Strategy
|
PDF
|
C DAS Ch9 Appendix D Competition Brief for External Lift
|
PDF
|
Response #2 (Redacted)
|
MSG
|
Thames Water comments
|
PDF
|
Response #3 (Redacted)
|
PDF
|
Historic England GLAAS advice. (Redacted)
|
PDF
|
Environment Agency comments
|
PDF
|
Canal & River Trust Response
|
PDF
|
Response #4 (Redacted)
|
PDF
|
Response #5 (Redacted)
|
PDF
|
Response #6
|
PDF
|
C DAS Ch9 Appendix F Statement of Public consultation To End LARGE FILE
|
PDF
|
C DAS Ch8 Access Statement
|
PDF
|
Responses #7-11
|
PDF
|
Response #12 (Redacted)
|
PDF
|
Response #13 (Redacted)
|
PDF
|
Responses #14-21
|
PDF
|
Responses #22-24
|
PDF
|
D4 ES Vol 3A Tech Appx 10.6 Overshadowing assessment part 8a of 8
|
PDF
|
Historic England Response (redacted)
|
PDF
|
1 x Response - HS2 (Redacted)
|
PDF
|
Revised Basement Impact Assessment 2017_Version 03 (Issued)
|
PDF
|
Geo-environmental Appraisal. C3821 - June 2010
|
PDF
|
Natural England consultation response
|
PDF
|
Camden and Islington Public Health response
|
PDF
|
Responses #25-33 (Redacted)
|
PDF
|
Primrose Hill CAAC response (Redacted)
|
PDF
|
Cllr Pat Callaghan response (Redacted)
|
PDF
|
Camden Cycling Campaign response (Redacted)
|
PDF
|
Responses #34-74
|
PDF
|
Responses #75-76 (Redacted)
|
DOCX
|
Camden Railway Heritage Trust Response
|
DOC
|
1 x Response - Network Rail
|
PDF
|
Response 78 (Redacted)
|
PDF
|
Response 80 (Redacted)
|
PDF
|
D4 ES Vol 3A Tech 10.1 Additional appendix Daylighting Scenarios Neighbouring window maps
|
PDF
|
Response 81 (Redacted)
|
PDF
|
Response 82 (Redacted)
|
DOCX
|
Regents Canal Conservation Area Advisory Committee Response
|
PDF
|
Camden Goods Yard Working Group Response
|
PDF
|
1x response (Redacted)
|
PDF
|
Response 84 (Redacted)
|
PDF
|
Response 85
|
PDF
|
Revised Statement of Community Involvement
|
PDF
|
Response 86
|
PDF
|
Response 87 - One Housing Group Response (Redacted)
|
PDF
|
Further Revised Basement Impact Assessment Version 04
|
PDF
|
BC Block C Revised elevations
|
PDF
|
BC Block C Revised plans
|
PDF
|
BC Block C Revised sections
|
PDF
|
BC Block C Bay studies
|
PDF
|
BD Block D Unit types 500 501
|
PDF
|
BD Block D Revised Bay Studies 400 to 402
|
PDF
|
BD Block D Revised elevations 200 to 203
|
PDF
|
BD Block D Revised plans 100 to 105
|
PDF
|
BD Block D Revised sections 300 301
|
PDF
|
BE1 Block E1 Revised sections 155 156
|
PDF
|
BE1 Block E1 Revised Drawing register
|
PDF
|
BE1 Block E1 Revised elevations 144 145
|
PDF
|
BE1 Block E1 Revised gnd floor 13508-A-E1-L00-100
|
PDF
|
BE2 Block E2 Revised sections 300 301
|
PDF
|
BE2 Block E2 Unit types 500 to 502
|
PDF
|
BE2 Block E2 Revised bay studies 400 to 403
|
PDF
|
BE2 Block E2 Revised elevations 200 to 203
|
PDF
|
BE2 Block E2 Revised plans 100 to 105
|
PDF
|
BF Block F Revised plans 100 to 109
|
PDF
|
BF Block F Revised sections 300 302 303
|
PDF
|
BF Block F revised bay studies 401 404 406
|
PDF
|
BF Block F Revised elevations 200 to 203
|
PDF
|
BL Landscape Addendum to Design & Access Statement High Res LARGE file
|
PDF
|
BL Landscape Revised Overall Masterplan P10606-00-001-100
|
PDF
|
BL Landscape Revised general arrangement P10606-00-001-101
|
PDF
|
BL Landscape Addendum to Design & Access Statement Low Res
|
PDF
|
BB Block B Revised Bay studies 402 405
|
PDF
|
BB Block B Revised elevations 201 to 204
|
PDF
|
BB Block B Revised plans 099 100 101 107 108
|
PDF
|
BB Block B Revised Issue Register 171011_1095_CGY_Issue Register
|
PDF
|
BM Masterplan Revised 8th floor 1095_00_07_108_P3
|
PDF
|
BM Masterplan Revised 9th floor 1095_00_07_109_P3
|
PDF
|
BM Masterplan Revised 10thfloor 1095_00_07_110_P3
|
PDF
|
BM Masterplan Revised 11th floor 1095_00_07_111_P3
|
PDF
|
BM Masterplan Revised 12th floor 1095_00_07_112_P3
|
PDF
|
BM Masterplan Revised 13th floor 1095_00_07_113_P3
|
PDF
|
BM Masterplan Revised 14th floor 1095_00_07_114_P3
|
PDF
|
BM Masterplan Revised ground floor Oval Road Level 1095_00_07_100_P3
|
PDF
|
BM Masterplan Revised lower ground Chalk Farm Road Level 1095_00_07_099_P3
|
PDF
|
BM Masterplan Revised 1st floor 1095_00_07_101_P3
|
PDF
|
BM Masterplan Revised 2nd floor 1095_00_07_102_P3
|
PDF
|
BM Masterplan Revised 3rd floor 1095_00_07_103_P3
|
PDF
|
BM Masterplan Revised 4th floor 1095_00_07_104_P3
|
PDF
|
BM Masterplan Revised 5th floor 1095_00_07_105_P3
|
PDF
|
BM Masterplan Revised 6th floor 1095_00_07_106_P3
|
PDF
|
BM Masterplan Revised 7th floor 1095_00_07_107_P3
|
PDF
|
BPFS PFS Revised elevations final phase 300 to 304
|
PDF
|
BPFS PFS Revised plans final phase 010 to 012 and 099 to 106
|
PDF
|
BPFS PFS Revised sections 200 to 205
|
PDF
|
BPFS PFS Revised site and plans first phase 010 011 100 101
|
PDF
|
BPFS PFS Revised elevations first phase 301 to 304
|
PDF
|
BPFS PFS Bay Studies
|
PDF
|
BPFS PFS Revised Accommodation Schedule NIA
|
PDF
|
BPFS PFS Revised 170930-1605 Issue Sheet
|
PDF
|
BA Block A Revised ground floor plan 13508-A-A1_2-L00-100
|
PDF
|
BA Block A Revised sections 151 to 154
|
PDF
|
BA Revised Drawing register-Block A
|
PDF
|
BA Block A Revised elevations 140 to 143
|
PDF
|
Design Development Notes for Revisions 171011
|
PDF
|
A15 Addendum to Noise and Vibration Impact Assessment Final
|
PDF
|
D4 ES Vol 3A Tech Appx 10.4 Revised solar glare assessment LARGE FILE
|
PDF
|
D5 ES Vol 3B Addendum to Transport Assessment LARGE FILE
|
PDF
|
D4 ES Vol 3A Tech Appx 2.3 Revised Flood Risk Assessment and Drainage Strategy
|
PDF
|
A21 Sus Design & Construction Statement Addendum
|
PDF
|
A10 Revised Construction Management Plan Rev 4 - 041017
|
PDF
|
D4 ES Vol 3A Tech Appx 2.3 Comments on Revised FRA 031017
|
PDF
|
A6 Revised Air Quality Assessment Rev B
|
PDF
|
Supplementary Note Impact of Proposed Development on Regent's Park
|
PDF
|
A9 Basement Impact Assessment Groundwater Characteristics D4 ES Vol 3A Tech Appx 2.3
|
PDF
|
BL Landscape typical tree details P10606-00-001-810
|
PDF
|
BL Landscape Revised Tree Retention strategy 105
|
PDF
|
Revisions cover Letter - draft - CGY amendments and clarifications - 12 10 2017
|
PDF
|
A13 Framework Travel Plan Revised extracted from slh23160 - CGY - TP Addendum FINAL
|
PDF
|
A20 Statement of Community Involvement Revised
|
PDF
|
D4 ES Vol 3A Tech 10.1 Revised ADF Levels 100A Chalk Farm Road
|
PDF
|
BBS Response to GLA-LBC Accessibility Comments 18-09-17 provisional
|
PDF
|
Camden issued request for revisions clarifications
|
PDF
|
Camden Railway Heritage Trust Response 89
|
PDF
|
Response 88 (Redacted)
|
PDF
|
Response 90 to 96 (Redacted)
|
PDF
|
Response 97 (Redacted)
|
PDF
|
Response 98 (Redacted)
|
PDF
|
Response 99 (Redacted)
|
PDF
|
Response 100 (Redacted)
|
PDF
|
Response 101 (Redacted)
|
PDF
|
Response 102 (Redacted)
|
PDF
|
Response 103 (Redacted)
|
PDF
|
Response 104 (Redacted)
|
PDF
|
Response 105 (Redacted)
|
PDF
|
Building for Life assessment for Camden Goods Yard
|
PDF
|
BL Landscape typical tree details P10606-00-001-810
|
PDF
|
BL Landscape revised Softworks plan P10606-00-001-103
|
PDF
|
BL Landscape revised Hardworks plan P10606-00-001-102
|
PDF
|
BL Landscape revised Tree Planting Plan P10606-00-001-104
|
PDF
|
Environmental Implications Letter LUK11-23069_1
|
PDF
|
Met Police Reconsult Response
|
PDF
|
LBC initial design and landscape comments
|
PDF
|
BA Block A Bay drawings_Rev A
|
PDF
|
BE1 Block E1 Bay drawings_Rev A
|
PDF
|
Historic England response (Redacted)
|
PDF
|
NATIONAL_GRID_Response
|
PDF
|
Markettech Response (Redacted)
|
PDF
|
Response 1 (reconsult) (Redacted)
|
PDF
|
Response 2 (reconsult) (Redacted)
|
PDF
|
Response 3 (reconsult) (Redacted)
|
PDF
|
Natural England (reconsult) (Redacted)
|
PDF
|
HS2 Response (reconsult) (Redacted)
|
PDF
|
Responses 4-6 (reconsult) (Redacted)
|
PDF
|
Primrose Hill CAAC response (reconsult) (Redacted)
|
PDF
|
GLAAS response (reconsult)
|
PDF
|
Response 7 (reconsult) (Redacted)
|
PDF
|
Canal & River Trust Response (reconsult) (Redacted)
|
PDF
|
1 x Response (Redacted)
|
PDF
|
1 x Response - GYTA
|
PDF
|
1 x Response - Thames Water
|
PDF
|
1 x Response (Markettech) (Redacted)
|
PDF
|
Campbell Reith BIA Audit report [ASPemb12466-88 -081117 Camden Goods Yard - F1]
|
PDF
|
A9 Basement Impact Assessment 2017_Version 05
|
PDF
|
1 x Response - Cllr Cotton
|
PDF
|
1 x Response (Redacted)
|
PDF
|
1 x Response 8 (Re-consult)
|
PDF
|
Newlon Housing Trust Response (reconsult)
|
PDF
|
C DAS Ch6 Design Statement Block E1 addendum
|
PDF
|
C DAS Ch6 Design Statement Block E2 addendum
|
PDF
|
C DAS Ch6 Design Statement Block F addendum
|
PDF
|
C DAS Ch6 Design Statement Block PFS addendum
|
PDF
|
C DAS Ch6 Design Statement Block A addendum
|
PDF
|
C DAS Ch6 Design Statement Block B addendum VERY LARGE FILE
|
PDF
|
C DAS Ch6 Design Statement Block C addendum LARGE FILE
|
PDF
|
C DAS Ch6 Design Statement Block D addendum
|
PDF
|
A9 BIA addendum GY Dbl Hght Basement Wall 301017
|
PDF
|
160630-006B Highway Layout
|
PDF
|
Applicants notes on Bus Delays
|
PDF
|
Applicants Response to CGY Planning Framework 03 11 17
|
PDF
|
Applicants response re AQ : ENER-G 150 (Low NOx) CHP- Technical Datasheet
|
PDF
|
A9 BIA Addendum GY Basement Wall southwest bdy_SLS 301017
|
PDF
|
CGY Committee Report (Text only)
|
PDF
|
CGY Committee Report (complete) optimised for screen LARGE FILE
|
PDF
|
CGY Committee Report (optimised for print) VERY Large File
|
PDF
|
Daylight & Sunlight Review Report by Delva Patman Redler - November 2017
|
PDF
|
Env Health Noise Obs Camden Goods Yard
|
PDF
|
1 x response
|
PDF
|
1x response (Redacted)
|
PDF
|
1 x response (Redacted)
|
PDF
|
89x Responses (Redacted)
|
PDF
|
Main site & PFS Site 1095_00_07_022 (Rev P1)
|
PDF
|
Camden Goods Yard - Final Decision Notice 2017 3847 P
|
PDF
|
Legal agreement
|
ZIP
|
Construction Management Plan Phase 1 for PFS site only
|
ZIP
|
CMP- Construction Management Plan
|
ZIP
|
Construction Management Plan (CMP) - Phase 2B (Version 4)
|
ZIP
|
Bus Infrastructure Safeguarding Plan First Schedule, Part 3, Clause 38.1 – Phase 2B and 3
|
ZIP
|
Construction Management Plan (CMP)- updated phase 2B
|
PDF
|
Extension to working hours form - CMP SM Suite - Final v2
|