PDF
|
LIBRARY DOOR REPORT
|
PDF
|
WINDOW REPORT
|
PDF
|
SCHEDULE OF DOCS (AS OF 15/02/2014)
|
PDF
|
BASEMENT PLAN
|
PDF
|
ENFORCEMENT NOTICE SCHEDULE
|
PDF
|
WINTER GARDEN DETAILS
|
PDF
|
OS Extract
|
PDF
|
MORTAN ANALYSIS REPORT
|
PDF
|
MORTAN ANALYSIS BY METHODS REPORT
|
PDF
|
DRAWING ISSUE 1
|
PDF
|
DRAWING ISSUE 2
|
PDF
|
DRAWING ISSUE - GENERAL ARRANGEMENTS
|
DOC
|
ASSESSMENT OF TIMBER (BY LUARD CONSERVATION LTD)
|
PDF
|
REPORT ON DOORS (BY LUARD CONSERVATION LTD)
|
PDF
|
REPORT ON FLOORS (BY LUARD CONSERVATION LTD)
|
PDF
|
REPORT ON SKIRTING, CORNICES, ETC (BY LUARD CONSERVATION LTD)
|
PDF
|
REPORT ON WINDOWS (BY LUARD CONSERVATION LTD)
|
PDF
|
REPORT ON WINDOWS OPENINGS (BY LUARD CONSERVATION LTD)
|
PDF
|
RESPONSE TO CAMDEN COUNCIL BY LUARD CONSERVATION LTD
|
PDF
|
ATRIUM DESIGN REVIEW
|
PDF
|
CONCRETE FLOOR REVIEW
|
PDF
|
ROOF OPTIONS - PLANS & SECTIONS
|
PDF
|
HERITAGE STATEMENT
|
PDF
|
WINDOW PAINT REPORT
|
DOCX
|
THE ELMS MECHANICAL AND ELECTRICAL METHOD STATEMENT
|
PDF
|
ROOF LEVEL VENTILATION SERVICES LAYOUT
|
PDF
|
ROOF LEVEL SMALL POWER & ANCILLARY LAYOUT
|
PDF
|
ROOF LEVEL LIGHTING LAYOUT
|
PDF
|
ROOF PLAN
|
PDF
|
WINTER GARDEN SECTION EAST - WEST
|
PDF
|
WEST ELEVATION
|
PDF
|
SOUTH ELEVATION
|
PDF
|
SECTION CC
|
PDF
|
SECTION BB
|
PDF
|
SECTION AA
|
PDF
|
SECOND FLOOR PLAN
|
PDF
|
NORTH ELEVATION
|
PDF
|
GROUND FLOOR PLAN
|
PDF
|
FIRST FLOOR PLAN
|
PDF
|
EAST ELEVATION
|
PDF
|
BASEMENT PLAN
|
PDF
|
PROPOSED PLANS & ELEVATIONS DRAWING SCHEDULE
|
DOCX
|
SPECIFICATIONS OF WORK
|
DOCX
|
SCHEDULE OF WORKS
|
PDF
|
BASEMENT WINE CELLAR (ROOM B15)
|
PDF
|
BASEMENT WINE BAR (ROOM B15)
|
PDF
|
BASEMENT WC (ROOM B23)
|
PDF
|
GROUND FLOOR WC (ROOM G19)
|
PDF
|
UPPER GALLERY/HALLWAY (ROOM 1.9)
|
PDF
|
BASEMENT TENNIS ROOM (ROOM B13) 2 OF 2
|
PDF
|
BASEMENT TENNIS ROOM (ROOM B13) 1 OF 2
|
PDF
|
GROUND FLOOR STUDY (ROOM G.16) 2 OF 2
|
PDF
|
GROUND FLOOR STUDY (ROOM G.16) 1 OF 2
|
PDF
|
BASEMENT STORE (ROOM B12
|
PDF
|
FIRST FLOOR LANDING STAIR (ROOM 1.13
|
PDF
|
GROUND FLOOR SITTING ROOM (ROOM G11) 2 OF 2
|
PDF
|
GROUND FLOOR SITTING ROOM (ROOM G11) 1 OF 2
|
PDF
|
FIRST FLOOR SHOWER (ROOM 1.10)
|
PDF
|
BASEMENT SHOWER (ROOM B11)
|
PDF
|
BASEMENT SECURITY ROOM (ROOM B8)
|
PDF
|
GROUND FLOOR ORIGINAL HALLWAY (ROOM G12)
|
PDF
|
BASEMENT LOBBY (ROOM B24)
|
PDF
|
GROUND FLOOR LIBRARY (ROOM G10)
|
PDF
|
BASEMENT LAUNDRY ROOM (ROOM B6)
|
PDF
|
BASEMENT KITCHEN (ROOM B10)
|
PDF
|
JOINERY ( 1 OF 2)
|
PDF
|
JOINERY ( 2 OF 2)
|
PDF
|
INTERNAL DOORS
|
PDF
|
EXISTING DRAWING GENERAL ARRANGEMENT SCHEDULE 3
|
PDF
|
EXISTING DRAWING GENERAL ARRANGEMENT SCHEDULE 2
|
PDF
|
EXISTING DRAWING GENERAL ARRANGEMENT SCHEDULE 1
|
PDF
|
BASEMENT ENTRANCE HALL & DRESSING ROOM (ROOM B7)
|
PDF
|
GROUND FLOOR ENTRANCE HALL & DRESSING ROOM (ROOM G14 & 15) 2 OF 2
|
PDF
|
GROUND FLOOR ENTRANCE HALL & DRESSING ROOM (ROOM G14 & 15) 1 OF 2
|
PDF
|
FIRST FLOOR DRESSING ROOM (ROOM 1.14)
|
PDF
|
BASEMENT CENTRAL STAIR (ROOM B 22) 2 OF 2
|
PDF
|
BASEMENT CENTRAL STAIR (ROOM B 22) 1 OF 2
|
PDF
|
FIRST FLOOR BEDROOM (ROOM 1.12) 2 OF 2
|
PDF
|
FIRST FLOOR BEDROOM (ROOM 1.12) 1 OF 2
|
PDF
|
FIRST FLOOR BEDROOM, BATHROOM, LOBBY (ROOM 1.16, 17 & 20) 2 OF 2
|
PDF
|
FIRST FLOOR BEDROOM, BATHROOM, LOBBY (ROOM 1.16, 17 & 20) 1 OF 2
|
PDF
|
BASEMENT BEDROOM (ROOM B9)
|
PDF
|
FIRST FLOOR BEDROOM (ROOM 1.18 & 19)
|
PDF
|
FIRST FLOOR BEDROOM (ROOM 1.11)
|
PDF
|
FIRST FLOOR BATHROOM (ROOM 1.15)
|
PDF
|
GROUND FLOOR STUDY (ROOF G13)
|
PDF
|
ROOF LEVEL FIRE PROTECTION LAYOUT
|
PDF
|
ROOF LEVEL ELECTRIC CONTAINMENT LAYOUT
|
PDF
|
ROOF LEVEL COORDINATED ELECTRICAL SERVICES LAYOUT
|
PDF
|
MECHANICAL SERVICES ISSUE SHEET
|
PDF
|
GROUND FLOOR VENTILATION SERVICES LAYOUT
|
PDF
|
GROUND FLOOR SMALL POWER & ANCILLARY LAYOUT
|
PDF
|
GROUND FLOOR LIGHTING LAYOUT
|
PDF
|
GROUND FLOOR HEATING SERVICES LAYOUT
|
PDF
|
GROUND FLOOR FIRE PROTECTION ZONES
|
PDF
|
GROUND FLOOR DRAINAGE SERVICES LAYOUT
|
PDF
|
GROUND FLOOR DOMESTIC WATER SERVICES LAYOUT
|
PDF
|
GROUND FLOOR COORDINATED SERVICES SECTIONS 3
|
PDF
|
GROUND FLOOR COORDINATED SERVICES SECTIONS 2
|
PDF
|
GROUND FLOOR COORDINATED SERVICES SECTIONS 1
|
PDF
|
GROUND FLOOR COORDINATED MECHANICAL SERVICES LAYOUT
|
PDF
|
GROUND FLOOR COORDINATED ELECTRICAL SERVICES LAYOUT
|
PDF
|
GROUND FLOOR CONTAINMENT & CABLING LAYOUT
|
PDF
|
FIRST FLOOR VENTILATION SERVICES LAYOUT
|
PDF
|
FIRST FLOOR SMALL POWER & ANCILLARY LAYOUT
|
PDF
|
FIRST FLOOR LIGHTING LAYOUT
|
PDF
|
FIRST FLOOR HEATING SERVICES LAYOUT
|
PDF
|
FIRST FLOOR FIRE PROTECTION ZONES LAYOUT
|
PDF
|
FIRST FLOOR DRAINAGE SERVICES LAYOUT
|
PDF
|
FIRST FLOOR DOMESTIC WATER SERVICES LAYOUT
|
PDF
|
FIRST FLOOR COORDINATED SERVICES SECTIONS 3.PDF
|
PDF
|
FIRST FLOOR COORDINATED SERVICES SECTIONS 2
|
PDF
|
FIRST FLOOR COORDINATED SERVICES SECTIONS 1
|
PDF
|
FIRST FLOOR COORDINATED MECHANICAL SERVICES LAYOUT
|
PDF
|
FIRST FLOOR COORDINATED ELECTRICAL SERVICES LAYOUT
|
PDF
|
FIRST FLOOR CONTAINMENT & CABLING LAYOUT
|
PDF
|
ELECTRICAL SERVICES ISSUE SHEET
|
PDF
|
BASEMENT VENTILATION SERVICES LAYOUT
|
PDF
|
BASEMENT SMALL POWER & ANCILLARY LAYOUT
|
PDF
|
BASEMENT LIGHTING LAYOUT
|
PDF
|
BASEMENT HEATING SERVICES LAYOUT
|
PDF
|
BASEMENT FIRE PROTECTION ZONES LAYOUT
|
PDF
|
BASEMENT DRAINAGE SERVICES LAYOUT
|
PDF
|
BASEMENT DOMESTIC WATER SERVICES LAYOUT
|
PDF
|
BASEMENT COORDINATED SERVICES SECTIONS 3
|
PDF
|
BASEMENT COORDINATED SERVICES SECTIONS 2
|
PDF
|
BASEMENT COORDINATED SERVICES SECTIONS 1
|
PDF
|
BASEMENT COORDINATED MECHANICAL SERVICES LAYOUT
|
PDF
|
BASEMENT COORDINATED ELECTRICAL SERVICES LAYOUT
|
PDF
|
BASEMENT CONTAINING & CABLING LAYOUT
|
PDF
|
BATHROOM DETAILS
|
PDF
|
SCHEDULE OF WORKS
|
PDF
|
VERANDA CONDITION REPORT
|
PDF
|
VERANDA REPORT COVER LETTER
|
PDF
|
FOR FURTHER INFORMATION SEE 2013/5764/P
|
PDF
|
SITE PLAN
|
PDF
|
BASEMENT PLAN
|
PDF
|
GROUND FLOOR PLAN
|
PDF
|
FIRST FLOOR PLAN
|
PDF
|
EAST ELEVATION
|
PDF
|
SOUTH ELEVATION
|
PDF
|
WEST ELEVATION
|
PDF
|
WINTER GARDEN SECTION
|
PDF
|
REPORT ON THE SIGNIFICANCE OF 'THE ELMS'
|
PDF
|
COVER LETTER
|
PDF
|
APPENDIX 1
|
PDF
|
APPENDIX 2
|
PDF
|
APPENDIX 3 (PART 1)
|
PDF
|
APPENDIX 3 (PART 2)
|
PDF
|
APPENDIX 3 (PART 3)
|
PDF
|
APPENDIX 3 (PART 4)
|
PDF
|
APPENDIX 4
|
PDF
|
PART 1-2
|
PDF
|
PART 3
|
PDF
|
PART 4
|
PDF
|
PART 5-6
|
PDF
|
PART 7
|
PDF
|
DRAWING ISSUE 3
|
PDF
|
PROTOCOL FOR THE REPAIR OF THE TIMBER WINDOWS
|
PDF
|
SCHEDULE OF DOCUMENTS
|
PDF
|
WINDOW REPORT - WINDOW 11
|
PDF
|
WINDOW REPORT - WINDOW 13
|
PDF
|
WINDOW REPORT - WINDOW 20
|
PDF
|
AS EXISTING DRAWING SCHEDULE
|
PDF
|
AS EXISTING BASEMENT PLAN
|
PDF
|
AS EXISTING BASEMENT PLAN - PHOTO
|
PDF
|
AS EXISTING GROUND FLOOR PLAN
|
PDF
|
AS EXISTING GROUND FLOOR PLAN - PHOTO
|
PDF
|
AS EXISTING FIRST FLOOR PLAN
|
PDF
|
AS EXISTING FIRST FLOOR PLAN - PHOTO
|
PDF
|
AS EXISTING SECOND FLOOR PLAN
|
PDF
|
AS EXISTING ROOF PLAN
|
PDF
|
AS EXISTING EAST ELEVATION
|
PDF
|
AS EXISTING SOUTH ELEVATION
|
PDF
|
AS EXISTING WEST ELEVATION
|
PDF
|
AS EXISTING WINTER GARDEN SECTION
|
PDF
|
AS EXISTING SECTION AA
|
PDF
|
AS EXISTING SECTION BB
|
PDF
|
AS EXISTING SECTION CC
|
PDF
|
MORTAR ANALYSIS COVER LETTER
|
PDF
|
MORTAR ANALYSIS REPORT
|
PDF
|
492 - Revised The Elms Windows Drawings Package EFP 001-022
|
PDF
|
492-109D - First Floor Plan Revised v2015
|
PDF
|
492-111C - Second Floor Plan Revised v2015
|
PDF
|
492-112C - Roof Plan Revised v2015
|
PDF
|
492-210C East Elevation Revised v2015
|
PDF
|
492-213C Winter Gdn Section E-W Revised v2015
|
PDF
|
Proposed Second Floor v2015 - 492-111F
|
PDF
|
492-109D - First Floor Plan v2015(2)
|
PDF
|
492-210C East Elevation v2015
|
PDF
|
492-111C - Second Floor Plan v2015
|
PDF
|
492-213C Winter Gdn Section E-W v2015
|
PDF
|
492-112C - Roof Plan v2015
|
PDF
|
150212 Drawing cover letter copy (Redacted)
|
DOC
|
Delegated Report
|
PDF
|
Decision Notice Final
|