04/03/2025 13:01:14 |
Decision notice
|
Decision Notice
|
04/03/2025 13:00:45 |
British Museum (SWEC) - S106 Agreement - COMPLETED AGREEMENT
|
Legal Agreement
|
28/08/2024 11:37:26 |
Committee report and draft decision notice
|
Officer Committee Report
|
26/03/2024 23:39:36 |
1 x Response
|
Consultation Response
|
19/03/2024 16:28:47 |
1 x Response (Redacted)
|
Consultation Response
|
11/03/2024 12:16:21 |
DAS - Chapter 07 Enabling Works_RevF
|
Design and Access Statement
|
11/03/2024 12:15:49 |
DAS - Chapter 04 South West Energy Centre (SWEC)_RevF_Part 2
|
Design and Access Statement
|
11/03/2024 12:15:23 |
DAS - Chapter 04 South West Energy Centre (SWEC)_RevF_Part 1
|
Design and Access Statement
|
11/03/2024 12:04:18 |
Proposed ISS East Elevation A
|
Proposed Drawing
|
11/03/2024 12:03:50 |
Proposed ISS Section DD & EE
|
Proposed Drawing
|
11/03/2024 12:00:06 |
Overheating Analysis
|
Supporting Documents
|
07/03/2024 10:37:52 |
Transport Statement (REVISED)
|
Supporting Documents
|
28/02/2024 15:49:25 |
Comments from Thames Water
|
Consultation Response
|
27/02/2024 10:14:53 |
Transport for London (TfL) No comment
|
Consultation Response
|
26/02/2024 17:17:12 |
BCAAC- response
|
Consultation Response
|
26/02/2024 13:26:58 |
GLAAS (Archaeology) - consultation response
|
Consultation Response
|
23/02/2024 12:07:05 |
TfL - Crossrail Safeguarding consultation response
|
Consultation Response
|
21/02/2024 17:14:36 |
Transport Statement (updated)
|
Supporting Documents
|
21/02/2024 17:14:01 |
Part_l_2021_gla_carbon_emission_reporting_spreadsheet
|
Supporting Documents
|
21/02/2024 17:13:40 |
Energy and Sustainability Proforma
|
Supporting Documents
|
21/02/2024 17:07:19 |
Energy and Sustainability Statement
|
Supporting Documents
|
21/02/2024 17:03:53 |
Below Ground Drainage and SuDS
|
Supporting Documents
|
21/02/2024 16:56:37 |
Drawing issue record sheet
|
Supporting Documents
|
21/02/2024 16:56:08 |
Proposed enabling works new wing
|
Proposed Drawing
|
21/02/2024 16:55:47 |
Proposed enabling works south west elevation
|
Proposed Drawing
|
21/02/2024 16:55:27 |
Proposed enabling works south west gates
|
Proposed Drawing
|
21/02/2024 16:54:52 |
Proposed ISS East Road south elevation
|
Proposed Drawing
|
21/02/2024 16:54:34 |
Proposed ISS East Road north elevation
|
Proposed Drawing
|
21/02/2024 16:54:15 |
Proposed ISS East Road elevation
|
Proposed Drawing
|
21/02/2024 16:53:51 |
Proposed ISS East Road elevation B
|
Proposed Drawing
|
21/02/2024 16:12:52 |
Proposed ISS East Road elevation
|
Proposed Drawing
|
21/02/2024 16:12:31 |
Proposed ISS Section AA
|
Proposed Drawing
|
21/02/2024 15:54:46 |
Proposed ISS section BB and CC
|
Proposed Drawing
|
21/02/2024 15:54:17 |
Proposed ISS Landscape Plan
|
Proposed Drawing
|
21/02/2024 15:53:58 |
Proposed ISS Level 01 Plan
|
Proposed Drawing
|
21/02/2024 15:53:40 |
Proposed ISS Roof Plan
|
Proposed Drawing
|
21/02/2024 15:29:28 |
Schedule of Works Rev F
|
Supporting Documents
|
21/02/2024 15:28:44 |
Design and Access Statement - Chapter 05 Incoming Substation (ISS) Rev F
|
Design and Access Statement
|
21/02/2024 15:27:34 |
Design and Access Statement - Chapter 03 Consultation & Scheme Development Rev F
|
Design and Access Statement
|
21/02/2024 15:26:43 |
Design and Access Statement - Chapter 02 Brief Rev F
|
Design and Access Statement
|
21/02/2024 15:25:15 |
Design and Access Statement - Chapter 01 Site Context Rev F
|
Design and Access Statement
|
21/02/2024 13:06:38 |
Design and Access Statement - Chapter 00 Executive Summary Rev F
|
Design and Access Statement
|
11/01/2024 11:59:33 |
Metropolitan Policy consultation response
|
Consultation Response
|
11/01/2024 11:51:21 |
Historic England consultation response
|
Consultation Response
|
10/11/2023 11:52:44 |
27. Statement of Community Involvement
|
Supporting Documents
|
10/11/2023 11:52:37 |
26. Fire Statement
|
Supporting Documents
|
10/11/2023 11:52:27 |
25. Sustainable Drainage Systems Strategy_Part2
|
Supporting Documents
|
10/11/2023 11:52:19 |
25. Sustainable Drainage Systems Strategy_Part1
|
Supporting Documents
|
10/11/2023 11:52:07 |
24. Framework Travel Plan **SUPERSEDED**
|
Superseded
|
10/11/2023 11:51:58 |
23. Construction Management Plan - Appendix M - Noise Receptors
|
Supporting Documents
|
10/11/2023 11:51:42 |
23. Construction Management Plan - Appendix L - Noise Surveys
|
Supporting Documents
|
10/11/2023 11:51:34 |
23. Construction Management Plan - Appendix K - Noisy Operations
|
Supporting Documents
|
10/11/2023 11:51:27 |
23. Construction Management Plan - Appendix J - Vehicle SPA Site Access and Egress
|
Supporting Documents
|
10/11/2023 11:51:21 |
23. Construction Management Plan - Appendix E - Construction Vehicle Route Risk
|
Supporting Documents
|
10/11/2023 11:51:16 |
23. Construction Management Plan - Appendix A - CIA Checklist Central London
|
Supporting Documents
|
10/11/2023 11:51:07 |
23. Construction Management Plan
|
Supporting Documents
|
10/11/2023 11:50:55 |
22. Lighting Assessment
|
Supporting Documents
|
10/11/2023 11:50:44 |
21. Tree Survey
|
Supporting Documents
|
10/11/2023 11:50:37 |
21. Tree Protection Plan
|
Supporting Documents
|
10/11/2023 11:50:32 |
21. Tree Constraints Plan
|
Supporting Documents
|
10/11/2023 11:50:15 |
21. Arboricultural Method Statement
|
Supporting Documents
|
10/11/2023 11:50:09 |
21. Arboricultural Implication Assessment
|
Supporting Documents
|
10/11/2023 11:50:01 |
20. Preliminary Ecological Appraisal
|
Supporting Documents
|
10/11/2023 11:49:55 |
19. Archaeological Desk-Based Assessment
|
Supporting Documents
|
10/11/2023 11:49:50 |
18. Air Quality Assessment
|
Supporting Documents
|
10/11/2023 11:49:44 |
17. Daylight Sunlight and Overshadowing Assessment Appendices
|
Supporting Documents
|
10/11/2023 11:49:38 |
17. Daylight Sunlight and Overshadowing Assessment
|
Supporting Documents
|
10/11/2023 11:49:33 |
16. Environmental Noise Impact Assessment
|
Supporting Documents
|
10/11/2023 11:49:19 |
15. Energy and Sustainability Statement
|
Supporting Documents
|
10/11/2023 11:49:13 |
14. Preliminary BREEAM Assessment
|
Supporting Documents
|
10/11/2023 11:49:08 |
13. Structural Report_Part3
|
Supporting Documents
|
10/11/2023 11:49:02 |
13. Structural Report_Part2
|
Supporting Documents
|
10/11/2023 11:48:56 |
13. Structural Report_Part1
|
Supporting Documents
|
10/11/2023 11:48:51 |
12. Demolition Schedule of Works_Part 3
|
Supporting Documents
|
10/11/2023 11:48:44 |
12. Demolition Schedule of Works_Part 2
|
Supporting Documents
|
10/11/2023 11:48:39 |
12. Demolition Schedule of Works_Part 1
|
Supporting Documents
|
10/11/2023 11:48:34 |
11. Heritage Statement
|
Supporting Documents
|
10/11/2023 11:48:29 |
10. Planning Statement
|
Supporting Documents
|
10/11/2023 11:48:24 |
09. Community Infrastructure Levy Form
|
CIL
|
10/11/2023 11:48:14 |
08. DAS - Chapter 07 Enabling Works(2)
|
Design and Access Statement
|
10/11/2023 11:48:07 |
08. DAS - Chapter 06 Distribution_Part 5(2)
|
Design and Access Statement
|
10/11/2023 11:48:01 |
08. DAS - Chapter 06 Distribution_Part 4(2)
|
Design and Access Statement
|
10/11/2023 11:47:55 |
08. DAS - Chapter 06 Distribution_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:47:41 |
08. DAS - Chapter 06 Distribution_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:47:36 |
08. DAS - Chapter 06 Distribution_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:47:31 |
08. DAS - Chapter 05 Incoming Substation_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:47:25 |
08. DAS - Chapter 05 Incoming Substation_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:47:18 |
08. DAS - Chapter 04 South West Energy Centre_Part 4(2)
|
Design and Access Statement
|
10/11/2023 11:47:13 |
08. DAS - Chapter 04 South West Energy Centre_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:47:07 |
08. DAS - Chapter 04 South West Energy Centre_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:47:01 |
08. DAS - Chapter 04 South West Energy Centre _Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:46:54 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 6(2)
|
Design and Access Statement
|
10/11/2023 11:46:49 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 5(2)
|
Design and Access Statement
|
10/11/2023 11:46:44 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 4(2)
|
Design and Access Statement
|
10/11/2023 11:46:38 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:46:31 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:46:24 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:46:24 |
23. Construction Management Plan - Appendix E - Construction Vehicle Route Risk(2)
|
Supporting Documents
|
10/11/2023 11:46:22 |
23. Construction Management Plan - Appendix A - CIA Checklist Central London(2)
|
Supporting Documents
|
10/11/2023 11:46:18 |
08. DAS - Chapter 02 Brief(2)
|
Design and Access Statement
|
10/11/2023 11:46:16 |
23. Construction Management Plan(2)
|
Supporting Documents
|
10/11/2023 11:46:14 |
22. Lighting Assessment(2)
|
Supporting Documents
|
10/11/2023 11:46:13 |
08. DAS - Chapter 01 Site and Context_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:46:11 |
21. Tree Survey(2)
|
Supporting Documents
|
10/11/2023 11:46:07 |
21. Tree Protection Plan(2)
|
Supporting Documents
|
10/11/2023 11:46:07 |
08. DAS - Chapter 01 Site and Context_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:46:05 |
21. Tree Constraints Plan(2)
|
Supporting Documents
|
10/11/2023 11:46:02 |
21. Arboricultural Method Statement(2)
|
Supporting Documents
|
10/11/2023 11:46:01 |
08. DAS - Chapter 01 Site and Context_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:46:00 |
21. Arboricultural Implication Assessment(2)
|
Supporting Documents
|
10/11/2023 11:45:55 |
20. Preliminary Ecological Appraisal(2)
|
Supporting Documents
|
10/11/2023 11:45:52 |
08. DAS - Chapter 00 Executive Summary(2)
|
Design and Access Statement
|
10/11/2023 11:45:47 |
19. Archaeological Desk-Based Assessment(2)
|
Supporting Documents
|
10/11/2023 11:45:46 |
07. SWEC - Proposed Location Plan and Site Plan - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:45:43 |
18. Air Quality Assessment(2)
|
Supporting Documents
|
10/11/2023 11:45:40 |
07. SWEC - Proposed GA Sections - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:45:37 |
17. Daylight Sunlight and Overshadowing Assessment Appendices(2)
|
Supporting Documents
|
10/11/2023 11:45:36 |
07. SWEC - Proposed GA Plans - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:45:33 |
17. Daylight Sunlight and Overshadowing Assessment(2)
|
Supporting Documents
|
10/11/2023 11:45:31 |
07. SWEC - Proposed GA Elevations - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:45:30 |
16. Environmental Noise Impact Assessment(2)
|
Supporting Documents
|
10/11/2023 11:45:25 |
07. SWEC - Existing - Combined(2)
|
Existing Drawing
|
10/11/2023 11:45:20 |
15. Energy and Sustainability Statement(2)
|
Supporting Documents
|
10/11/2023 11:45:19 |
07. SWEC - Enabling Works - Combined(2)
|
Plans
|
10/11/2023 11:45:18 |
14. Preliminary BREEAM Assessment(2)
|
Supporting Documents
|
10/11/2023 11:45:14 |
13. Structural Report_Part3(2)
|
Supporting Documents
|
10/11/2023 11:45:14 |
07. SWEC - Demolition - Combined_Part2(2)
|
Proposed Drawing
|
10/11/2023 11:45:08 |
13. Structural Report_Part2(2)
|
Supporting Documents
|
10/11/2023 11:45:04 |
07. SWEC - Demolition - Combined_Part1(2)
|
Other
|
10/11/2023 11:45:00 |
13. Structural Report_Part1(2)
|
Supporting Documents
|
10/11/2023 11:44:59 |
07. ISS (Substation) - Proposed GA Sections
|
Proposed Drawing
|
10/11/2023 11:44:54 |
07. ISS (Substation) - Proposed GA Plans
|
Proposed Drawing
|
10/11/2023 11:44:51 |
12. Demolition Schedule of Works_Part 3(2)
|
Supporting Documents
|
10/11/2023 11:44:48 |
07. ISS - Proposed GA Elevations - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:44:43 |
07. ISS - Existing - Combined(2)
|
Existing Drawing
|
10/11/2023 11:44:38 |
12. Demolition Schedule of Works_Part 2(2)
|
Supporting Documents
|
10/11/2023 11:44:37 |
07. ISS - Demolition - Combined(2)
|
Plans
|
10/11/2023 11:44:30 |
12. Demolition Schedule of Works_Part 1(2)
|
Supporting Documents
|
10/11/2023 11:44:29 |
07. Distribution - Proposed - Combined_Part2(2)
|
Proposed Drawing
|
10/11/2023 11:44:21 |
07. Distribution - Proposed - Combined_Part1(2)
|
Proposed Drawing
|
10/11/2023 11:44:21 |
11. Heritage Statement(2)
|
Supporting Documents
|
10/11/2023 11:44:18 |
10. Planning Statement(2)
|
Supporting Documents
|
10/11/2023 11:44:15 |
07. Distribution - Existing - Combined_Part2(2)
|
Existing Drawing
|
10/11/2023 11:44:13 |
09. Community Infrastructure Levy Form(2)
|
CIL
|
10/11/2023 11:44:06 |
07. Distribution - Existing - Combined_Part1(2)
|
Existing Drawing
|
10/11/2023 11:44:02 |
08. DAS - Chapter 07 Enabling Works(2)
|
Design and Access Statement
|
10/11/2023 11:43:57 |
07. Distribution - Demolition - Combined_Part2(2)
|
Other
|
10/11/2023 11:43:53 |
08. DAS - Chapter 06 Distribution_Part 5(2)
|
Design and Access Statement
|
10/11/2023 11:43:51 |
07. Distribution - Demolition - South West level 01
|
Proposed Drawing
|
10/11/2023 11:43:48 |
08. DAS - Chapter 06 Distribution_Part 4(2)
|
Design and Access Statement
|
10/11/2023 11:43:45 |
06. SWEC Drawing Issue Sheet(2)
|
Other
|
10/11/2023 11:43:42 |
08. DAS - Chapter 06 Distribution_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:43:40 |
06. ISS Drawing Issue Sheet(2)
|
Other
|
10/11/2023 11:43:35 |
08. DAS - Chapter 06 Distribution_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:43:34 |
06. Distribution Drawing Issue Sheet(2)
|
Other
|
10/11/2023 11:43:31 |
08. DAS - Chapter 06 Distribution_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:43:29 |
05. Site Plan(2)
|
Plans
|
10/11/2023 11:43:24 |
08. DAS - Chapter 05 Incoming Substation_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:43:23 |
04. Location Plan
|
OS Extract
|
10/11/2023 11:43:18 |
03. Covering Letter(2)
|
Other
|
10/11/2023 11:43:18 |
08. DAS - Chapter 05 Incoming Substation_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:43:11 |
01. Document Schedule(2)
|
Other
|
10/11/2023 11:43:10 |
08. DAS - Chapter 04 South West Energy Centre_Part 4(2)
|
Design and Access Statement
|
10/11/2023 11:43:03 |
08. DAS - Chapter 04 South West Energy Centre_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:42:57 |
08. DAS - Chapter 04 South West Energy Centre_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:42:51 |
08. DAS - Chapter 04 South West Energy Centre _Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:42:48 |
ApplicationFormRedacted(2)
|
Application Form
|
10/11/2023 11:42:42 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 6(2)
|
Design and Access Statement
|
10/11/2023 11:42:36 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 5(2)
|
Design and Access Statement
|
10/11/2023 11:42:29 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 4(2)
|
Design and Access Statement
|
10/11/2023 11:42:23 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:42:16 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:42:09 |
08. DAS - Chapter 03 Consultation and Scheme Development_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:42:03 |
08. DAS - Chapter 02 Brief(2)
|
Design and Access Statement
|
10/11/2023 11:41:54 |
08. DAS - Chapter 01 Site and Context_Part 3(2)
|
Design and Access Statement
|
10/11/2023 11:41:47 |
08. DAS - Chapter 01 Site and Context_Part 2(2)
|
Design and Access Statement
|
10/11/2023 11:41:41 |
08. DAS - Chapter 01 Site and Context_Part 1(2)
|
Design and Access Statement
|
10/11/2023 11:41:32 |
08. DAS - Chapter 00 Executive Summary(2)
|
Design and Access Statement
|
10/11/2023 11:41:24 |
07. SWEC - Proposed Location Plan and Site Plan - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:41:18 |
07. SWEC - Proposed GA Sections - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:41:14 |
07. SWEC - Proposed GA Plans - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:41:09 |
07. SWEC - Proposed GA Elevations - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:41:02 |
07. SWEC - Existing - Combined(2)
|
Existing Drawing
|
10/11/2023 11:40:56 |
07. SWEC - Enabling Works - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:40:50 |
07. SWEC - Demolition - Combined_Part2(2)
|
Proposed Drawing
|
10/11/2023 11:40:43 |
07. SWEC - Demolition - Combined_Part1(2)
|
Proposed Drawing
|
10/11/2023 11:40:39 |
07. ISS - Proposed GA Sections - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:40:37 |
07. ISS - Proposed GA Plans - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:40:34 |
07. ISS - Proposed GA Elevations - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:40:30 |
07. ISS - Existing - Combined(2)
|
Existing Drawing
|
10/11/2023 11:40:25 |
07. ISS - Demolition - Combined(2)
|
Proposed Drawing
|
10/11/2023 11:40:16 |
07. Distribution - Proposed - Combined_Part2(2)
|
Proposed Drawing
|
10/11/2023 11:40:08 |
07. Distribution - Proposed - Combined_Part1(2)
|
Proposed Drawing
|
10/11/2023 11:40:02 |
07. Distribution - Existing - Combined_Part2(2)
|
Existing Drawing
|
10/11/2023 11:39:54 |
07. Distribution - Existing - Combined_Part1(2)
|
Existing Drawing
|
10/11/2023 11:39:41 |
07. Distribution - Demolition - Combined_Part2(2)
|
Supporting Documents
|
10/11/2023 11:39:32 |
07. Distribution - Demolition - Combined_Part1(2)
|
Supporting Documents
|
10/11/2023 11:39:27 |
06. SWEC Drawing Issue Sheet(2)
|
Supporting Documents
|
10/11/2023 11:39:25 |
06. ISS Drawing Issue Sheet(2)
|
Supporting Documents
|
10/11/2023 11:39:22 |
06. Distribution Drawing Issue Sheet(2)
|
Supporting Documents
|