Related Documents

Summary

2022/4259/P
79

Application Documents

The links below are to PDF files. To view PDFs you need to download and install Adobe Acrobat Reader onto your computer. Help for people with visual disabilities: The files contained scanned documents that cannot be read by screen readers. If this is a problem for you please use the Planning online support form to request an alternative format.


Drawings can be large files. The quality of the image depends on the quality of the original submission.


Date Created Title Document Type
26/06/2024 10:13:58 CMP- DMP addendum first element Other
01/02/2024 13:38:12 DMP- Demolition Management Plan (CMP-first element) Other
02/01/2024 15:50:13 Completed S106 Agreement - 100 Gray s Inn 20.12.23 Legal Agreement
02/01/2024 15:49:49 Planning Permission 20.12.23 Decision Notice
03/10/2023 17:05:18 GLA0883 Grays Inn Road Stage 2 report Correspondence
03/10/2023 17:04:56 GLA0883 Grays Inn Road Stage 2 letter Correspondence
19/04/2023 20:08:31 Energy and sustainability comments responses 06/03/2023 Supporting Documents
21/03/2023 15:54:51 London Plan Fire Statement (Revised) 21.03.23 Supporting Documents
30/01/2023 16:11:38 13636 _100 Grays Inn Road Document Register 27.01.23 Supporting Documents
30/01/2023 16:10:46 Piercy_Gray's Inn Road_Agreed rooftop changes 27.01.23 Supporting Documents
30/01/2023 16:09:57 Revised drawing pack (roof level alterations) 27.01.23 Revised Drawing
21/12/2022 13:03:38 SuDs Strategy - Revised (17.11.22) Supporting Documents
21/12/2022 13:01:24 Flood Risk Assessment - Revised (17.11.22) Supporting Documents
19/12/2022 15:48:28 221212 Heritage Assets planning assessment 12.12.22 Supporting Documents
05/12/2022 16:50:48 13636-A-100-L00-00-100_RevB (Proposed ground floor plan) 22.11.22 Revised Drawing
05/12/2022 16:49:23 13636-A-100-B01-00-099_RevB (Proposed basement plan) 22.11.22 Revised Drawing
14/11/2022 12:42:08 1 x Response (Redacted) Consultation Response
28/10/2022 15:14:22 Thames Water comments Consultation Response
20/10/2022 13:50:21 THVIA Supporting Documents
20/10/2022 13:50:08 Ventilation and Extraction Statement Supporting Documents
17/10/2022 11:23:32 Travel Plan Supporting Documents
17/10/2022 11:23:15 Transport Assessment Supporting Documents
11/10/2022 14:25:27 Sustainability Statement 2 of 2 Other
07/10/2022 14:19:52 Circular Economy Statement - 4 of 4 Supporting Documents
07/10/2022 14:19:40 Circular Economy Statement - 3 of 4 Supporting Documents
07/10/2022 14:19:30 Facade material pack Supporting Documents
07/10/2022 14:17:55 DAS (Combined pack) Design and Access Statement
05/10/2022 16:05:10 Sustainability Statement 1 of 2 Other
05/10/2022 16:02:39 Structural Methodology Statement Appendix C Embodied Carbon Assessment Other
05/10/2022 16:02:26 Structural Methodology Statement Appendix B Design Parameters Other
05/10/2022 15:58:32 Structural Methodology Statement Appendix A Structural Drawings 2 Drawing
05/10/2022 15:56:19 Structural Methodology Statement Appendix A Structural Drawings 1 Drawing
05/10/2022 15:55:36 Structural Methodology Statement Other
05/10/2022 15:54:43 Statement of Community Involvement Other
05/10/2022 15:45:50 Site Waste Management Plan Plans
05/10/2022 15:45:14 Proposed sections Other
05/10/2022 15:43:18 Proposed plans Plans
05/10/2022 15:40:52 Proposed elevations Proposed Drawing
05/10/2022 15:32:32 Preliminary Ecological Assessment Other
05/10/2022 15:21:02 Planning Statement Other
05/10/2022 15:20:16 Noise Impact Assessment Other
05/10/2022 15:19:16 GEA Ground Investigation Report Part 4 Other
05/10/2022 15:13:01 GEA Ground Investigation Report Part 3 Other
05/10/2022 15:11:32 GEA Ground Investigation Report Part 2 Other
05/10/2022 15:09:30 GEA Ground Investigation Report Part 1 Other
05/10/2022 15:04:54 GEA Ground Investigation Report Appendix 1-4 (part 9) Other
05/10/2022 15:03:37 GEA Ground Investigation Report Appendix 1-4 (part 8) Other
05/10/2022 15:01:13 GEA Ground Investigation Report Appendix 1-4 (part 7) Other
05/10/2022 15:00:14 GEA Ground Investigation Report Appendix 1-4 (part 6) Other
05/10/2022 14:59:29 GEA Ground Investigation Report Appendix 1-4 (part 5) Other
05/10/2022 14:36:36 GEA Ground Investigation Report Appendix 1-4 (part 4) Other
05/10/2022 14:31:08 GEA Ground Investigation Report Appendix 1-4 (part 3) Other
05/10/2022 14:30:39 GEA Ground Investigation Report Appendix 1-4 (part 2) Other
05/10/2022 14:27:27 GEA Ground Investigation Report Appendix 1-4 (part 1) Other
05/10/2022 14:23:10 GEA Ground Investigation Report Appendix 1-3 Other
05/10/2022 14:16:31 GEA Ground Investigation Report Appendix 1-2 Other
05/10/2022 14:16:01 GEA Ground Investigation Report Appendix 1 -1 Other
05/10/2022 13:41:39 Financial Viability Assessment Other
05/10/2022 13:38:23 Existing drawings Drawing
05/10/2022 13:36:03 Energy Statement - 2 of 2 Other
05/10/2022 13:32:00 Energy Statement - 1 of 2 Other
05/10/2022 13:31:48 Employment and Training Plan Other
05/10/2022 13:29:49 Drawings register Drawing
05/10/2022 13:28:20 Drainage Strategy Other
05/10/2022 13:26:51 Demolition drawings Other
05/10/2022 13:24:43 Delivery and Servicing Plan Other
05/10/2022 13:23:29 Daylight and Sunlight Report Other
05/10/2022 12:27:12 Cover letter Correspondence
05/10/2022 12:25:50 Circular Economy Statement - 2 of 4 Other
05/10/2022 12:22:13 Circular Economy Statement - 1 of 4 Other
05/10/2022 12:22:02 CIL Form CIL
05/10/2022 12:21:29 Biodiversity Net Gain Plan Plans
05/10/2022 12:20:40 Archaeological Desk Based Assessment Other
05/10/2022 12:16:59 Arboricultural Impact Assessment and Method Statement Other
05/10/2022 12:16:43 ApplicationFormRedacted Application Form
05/10/2022 12:13:46 Air Quality Assessment Other
05/10/2022 12:12:34 Affordable Housing Statement Other
05/10/2022 12:11:36 Site Location Plan OS Extract
05/10/2022 10:57:34 Construction Management Plan Plans

Copyright Warning

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.