25/10/2023 15:58:07 |
COMPLETED AGREEMENT(3) (Redacted)
|
Legal Agreement
|
02/07/2021 10:45:33 |
Overheating risk assessment (updated)
|
Supporting Documents
|
30/06/2021 16:42:40 |
Independent audit of DBCP
|
Other
|
15/06/2021 11:42:51 |
DBCP 2210155-EWP-ZZ-XX-RP-S-0001-Certified Engineer's Report on Basement Construction Plan_AKTIIComments 210610
|
Other
|
15/06/2021 11:42:33 |
DBCP 2210155-EWP-ZZ-XX-RP-S-0001-Certified Engineer's Report on Basement Construction Plan
|
Other
|
15/06/2021 11:42:17 |
DBCP 4409 AKTII BCP Letter of Professional Certification
|
Other
|
15/06/2021 11:42:00 |
DBCB 1801 _ Elliott Wood _ DBCP Letter _ 24.5.21
|
Other
|
15/06/2021 11:38:37 |
DBCP Letter of Professional Certification
|
Other
|
15/06/2021 11:38:22 |
DBCP Certifying Engineer Review Report
|
Other
|
15/06/2021 11:37:01 |
DBCP Covering Letter - SPCC
|
Other
|
21/05/2021 15:31:45 |
1 x Response (Redacted)
|
Consultation Response
|
15/04/2021 11:24:30 |
Construction Management Plan 01-04-21
|
Other
|
23/03/2021 09:53:06 |
CMP - Construction Management plan
|
Other
|
27/01/2021 16:25:23 |
Decision SPCC 24.12.20
|
Decision Notice
|
27/01/2021 16:24:56 |
S106 SPCC 241220_SCAN 3 Draft decision(2)
|
Legal Agreement
|
27/01/2021 16:24:19 |
S106 SPCC 241220_SCAN 5 Sch 3-12(2)
|
Legal Agreement
|
27/01/2021 16:17:45 |
S106 SPCC 241220_SCAN 4 Plans(2) (Redacted)
|
Legal Agreement
|
27/01/2021 16:04:39 |
S106 SPCC 241220_SCAN 2 Pages 26-55(2) (Redacted)
|
Legal Agreement
|
27/01/2021 15:46:07 |
S106 SPCC 241220_SCAN 1 Pages 1-25(2)
|
Legal Agreement
|
01/05/2020 15:14:47 |
Stage 2 letter and report from GLA
|
Other
|
04/02/2020 11:04:19 |
SP108_00_ET_P2 - Existing / tree removals plan
|
Revised Drawing
|
04/02/2020 10:59:24 |
SPCC - Tabled paper
|
Officer Committee Report
|
04/02/2020 10:58:52 |
SPCC - Supplementary Agenda
|
Officer Committee Report
|
04/02/2020 10:58:13 |
SPCC - committee report
|
Officer Committee Report
|
21/01/2020 14:15:38 |
CIL form_12_further_charitable_social_housing_relief_claim
|
CIL
|
21/01/2020 14:15:03 |
CIL form_2_assumption_of_liability (004)
|
CIL
|
21/01/2020 14:14:33 |
CIL form_1_cil_additional_information
|
CIL
|
21/01/2020 14:05:57 |
BIA Audit report by Campbell Reith vF1
|
Other
|
13/12/2019 10:51:44 |
BIA Appendix 11
|
Supporting Documents
|
13/12/2019 10:51:24 |
BIA Appendix 10
|
Supporting Documents
|
13/12/2019 10:51:00 |
BIA Appendix 9
|
Supporting Documents
|
13/12/2019 10:50:38 |
BIA Appendix 8
|
Supporting Documents
|
13/12/2019 10:50:14 |
BIA Appendix 7
|
Supporting Documents
|
13/12/2019 10:49:49 |
BIA Appendix 6
|
Supporting Documents
|
13/12/2019 10:49:29 |
BIA Appendix 5
|
Supporting Documents
|
13/12/2019 10:49:05 |
BIA Appendix 4
|
Supporting Documents
|
13/12/2019 10:48:44 |
BIA Appendix 3 FRA
|
Supporting Documents
|
13/12/2019 10:47:59 |
BIA Appendix 2
|
Supporting Documents
|
13/12/2019 10:47:23 |
BIA Appendix 1
|
Supporting Documents
|
13/12/2019 10:46:24 |
BIA Rev 4 (revised)
|
Supporting Documents
|
29/11/2019 14:05:36 |
Landscaping details - updated
|
Supporting Documents
|
29/11/2019 13:56:47 |
Landscaping plans, Tree Strategy Statement and Matrix
|
Supporting Documents
|
26/11/2019 13:53:06 |
**superseded** Tree Strategy Statement + Matrix and removals plan - updated 25.1.19
|
Supporting Documents
|
26/11/2019 13:51:41 |
**superseded** Landscaping details - updated
|
Proposed Drawing
|
26/11/2019 13:02:34 |
**superseded** Basement Impact Assessment (revised) + appendices
|
Supporting Documents
|
25/11/2019 21:33:12 |
Daylight and Sunlight - Independent Review Report from pre-app stage
|
Other
|
25/11/2019 21:32:18 |
Daylight and sunlight Independent Review report - August 2019
|
Other
|
25/11/2019 20:45:21 |
Proposed Public Open Space - SP108_11_01_P2
|
Proposed Drawing
|
25/11/2019 20:44:44 |
Ground floor (waste) 477_CSJ_M1_GF_SK_A_071_S1_C
|
Proposed Drawing
|
25/11/2019 20:44:11 |
Ground floor (waste) 477_CSJ_A1_GF_SK_A_081_S1_C
|
Proposed Drawing
|
25/11/2019 20:41:36 |
SPCC Camden Waste Strategy Response
|
Supporting Documents
|
25/11/2019 20:41:11 |
Waste Strategy Response
|
Applicant Correspondence
|
25/11/2019 20:35:47 |
Additional sketch views of the central public open space and updated Tree Strategy Statement
|
Applicant Correspondence
|
25/11/2019 20:34:30 |
SPCC Official Copy (Title Plan) - NGL160613
|
Supporting Documents
|
25/11/2019 20:33:58 |
SPCC LBC TfL & GLA Transport Response Appendices
|
Supporting Documents
|
25/11/2019 20:33:38 |
SPCC LBC TfL & GLA Transport Response
|
Supporting Documents
|
22/11/2019 14:55:25 |
Sustainability and Energy statement Appendix E - Operational costs_Electricity vs gas_20191024
|
Supporting Documents
|
22/11/2019 14:54:58 |
Sustainability and Energy statement Appendix D - future heat exchanger space
|
Supporting Documents
|
22/11/2019 14:54:37 |
Sustainability and Energy statement Appendix C - green roof details
|
Supporting Documents
|
22/11/2019 14:53:24 |
Sustainability and Energy statement Appendix B - Consultant Advice - energy and sustainability, water efficiency and SUDS
|
Supporting Documents
|
22/11/2019 14:52:42 |
Sustainability and Energy statement - Appendix A - SAP worksheet and layout
|
Supporting Documents
|
22/11/2019 14:42:34 |
Sustainability and Energy statement - Response to Camden Council’s comments
|
Supporting Documents
|
22/11/2019 14:42:10 |
Noise Impact Assessment (Ref. Ref. 25789NIA3- Rev0)
|
Supporting Documents
|
22/11/2019 14:41:33 |
General - Response to Greater London Authority Water & Green Infrastructure Memo Stage 1 - Final
|
Supporting Documents
|
22/11/2019 14:40:23 |
Applicant Response to Planning Application Comments
|
Supporting Documents
|
19/11/2019 18:26:18 |
Tree Strategy Statement (updated)
|
Supporting Documents
|
19/11/2019 18:24:31 |
London Wildlife (Nature Conservation) comments (Redacted)
|
Consultation Response
|
18/11/2019 12:17:03 |
1 x response (Royal Mail) (Redacted)
|
Consultation Response
|
15/11/2019 16:31:12 |
Response to BIA audit queries
|
Supporting Documents
|
01/11/2019 10:15:43 |
GLA stage 1 decision letter and report
|
Consultation Response
|
01/11/2019 10:11:01 |
Sustainability and Energy Statement - Response to GLA
|
Supporting Documents
|
01/11/2019 10:04:31 |
Ground Investigation Report (updated)
|
Supporting Documents
|
01/11/2019 10:01:19 |
Letter commenting on light industrial offer (existing and proposed)
|
Supporting Documents
|
29/10/2019 10:09:53 |
South Kentish Town CAAC response part 2
|
Consultation Response
|
29/10/2019 10:02:22 |
South Kentish Town CAAC response
|
Consultation Response
|
23/10/2019 12:05:53 |
Transport for London response (Redacted)
|
Consultation Response
|
23/10/2019 12:05:02 |
Thames Water response (Redacted)
|
Consultation Response
|
23/10/2019 11:37:06 |
Regents Network + Regent's Canal CAAC response
|
Consultation Response
|
18/10/2019 14:21:23 |
St Pancras Commercial Centre - BIA Audit Report Rev D1
|
Other
|
11/10/2019 15:32:06 |
477_CSJ_00_GF_FP_A_3102_S1_P05 - GA ground floor plan - revised
|
Revised Drawing
|
08/10/2019 11:51:47 |
GLA stage 1 water & energy comments
|
Consultation Response
|
08/10/2019 11:29:02 |
Daylight and Sunlight report (amended)
|
Supporting Documents
|
04/10/2019 10:18:20 |
477_St Pancras_Drawing Issue Register_191001_Rev A
|
Other
|
04/10/2019 10:14:33 |
SPCC Planning Statement Addendum
|
Supporting Documents
|
02/10/2019 16:23:05 |
477_CSJ_M1_ZZ_DE_A_7022_S1_P02 - detailed elevation - residential - typical - revised
|
Revised Drawing
|
02/10/2019 16:22:46 |
477_CSJ_M1_ZZ_DE_A_7021_S1_P02 - detailed elevation - residential - terrace with retail entrance - revised
|
Revised Drawing
|
02/10/2019 16:22:24 |
477_CSJ_M1_ZZ_DE_A_7020_S1_P02 - detailed elevation - residential - terrace with resi entrance - revised
|
Revised Drawing
|
02/10/2019 16:22:01 |
477_CSJ_C1_ZZ_DE_A_7006_S1_P02 - detailed elevation - office - gate - revised
|
Revised Drawing
|
02/10/2019 16:21:40 |
477_CSJ_C1_ZZ_DE_A_7005_S1_P02 - detailed elevation - office - plant screen - revised
|
Revised Drawing
|
02/10/2019 16:21:19 |
477_CSJ_C1_ZZ_DE_A_7004_S1_P02 - detailed elevation - light industry - facade - revised
|
Revised Drawing
|
02/10/2019 16:20:59 |
477_CSJ_C1_ZZ_DE_A_7003_S1_P02 - detailed elevation - office - 4th floor terrace - revised
|
Revised Drawing
|
02/10/2019 16:20:35 |
477_CSJ_C1_ZZ_DE_A_7002_S1_P02 - detailed elevation - office - entrance - revised
|
Revised Drawing
|
02/10/2019 16:20:12 |
477_CSJ_C1_ZZ_DE_A_7001_S1_P02 - detailed elevation - office - typical - revised
|
Revised Drawing
|
02/10/2019 16:19:32 |
housing plans to show furniture
|
Proposed Drawing
|
02/10/2019 16:18:23 |
GA sections - revised
|
Revised Drawing
|
02/10/2019 16:17:09 |
477_CSJ_00_ZZ_EL_A_3301_S1_P02 - GA elevation St Pancras Way + Pratt St - revised
|
Revised Drawing
|
02/10/2019 16:16:47 |
477_CSJ_00_ZZ_EL_A_3300_S1_P02 - GA elevation Royal College St + Georgiana St - revised
|
Revised Drawing
|
02/10/2019 16:16:05 |
GA floor plans - revised (ground floor plan superseded)
|
Revised Drawing
|
18/09/2019 13:18:03 |
SPCC BIA audit instruction ABCD - no personal data
|
Other
|
18/09/2019 11:32:42 |
**SUPERSEDED** Basement Impact Assessment (updated)
|
Supporting Documents
|
11/09/2019 15:33:52 |
1 x Response Thames Water (Redacted)
|
Consultation Response
|
11/09/2019 10:46:18 |
1 x Response - Camden Cycling Campaign
|
Consultation Response
|
09/09/2019 11:39:07 |
1 x Response Camden Cycling Campaign
|
Consultation Response
|
30/08/2019 10:54:41 |
1 x response
|
Consultation Response
|
30/08/2019 10:03:35 |
Met police response (Redacted)
|
Consultation Response
|
29/08/2019 10:40:58 |
1 x response
|
Consultation Response
|
21/08/2019 12:03:33 |
2018/5948/PRE: St Pancras Commercial Centre - Final pre-app notes
|
Other
|
19/08/2019 15:22:22 |
**superseded** 477_CSJ_00_01_FP_A_3104_S1_P01 - Proposed 1st floor plan
|
Proposed Drawing
|
19/08/2019 15:22:14 |
Townscape, Visual Impact and Heritage Assessment Part 6 of 6
|
Supporting Documents
|
19/08/2019 15:22:05 |
Townscape, Visual Impact and Heritage Assessment Part 5 of 6
|
Supporting Documents
|
19/08/2019 15:21:31 |
Townscape, Visual Impact and Heritage Assessment Part 4 of 6
|
Supporting Documents
|
19/08/2019 15:21:22 |
Townscape, Visual Impact and Heritage Assessment Part 3 of 6
|
Supporting Documents
|
19/08/2019 15:21:12 |
Townscape, Visual Impact and Heritage Assessment Part 2 of 6
|
Supporting Documents
|
19/08/2019 15:21:03 |
Townscape, Visual Impact and Heritage Assessment Part 1 of 6
|
Supporting Documents
|
19/08/2019 15:20:56 |
Tree and Landscape Strategy (refer to updated version)
|
Supporting Documents
|
19/08/2019 15:20:37 |
Servicing Management Plan
|
Supporting Documents
|
19/08/2019 15:20:24 |
Transport Assessment Part 3
|
Supporting Documents
|
19/08/2019 15:19:57 |
Transport Assessment Part 2
|
Supporting Documents
|
19/08/2019 15:19:48 |
Transport Assessment Part 1
|
Supporting Documents
|
19/08/2019 15:19:36 |
Sustainability + Energy Statement Pt 2 Final
|
Supporting Documents
|
19/08/2019 15:19:23 |
Sustainability + Energy Statement Pt 1 Final
|
Supporting Documents
|
19/08/2019 15:19:02 |
Contaminated Land Assessment STR4646 - Part 7
|
Supporting Documents
|
19/08/2019 15:18:53 |
Contaminated Land Assessment STR4646 - Part 6
|
Supporting Documents
|
19/08/2019 15:18:43 |
Contaminated Land Assessment STR4646 - Part 5
|
Supporting Documents
|
19/08/2019 15:18:31 |
Contaminated Land Assessment STR4646 - Part 4
|
Supporting Documents
|
19/08/2019 15:18:23 |
Contaminated Land Assessment STR4646 - Part 3
|
Supporting Documents
|
19/08/2019 15:18:05 |
Contaminated Land Assessment STR4646 - Part 2
|
Supporting Documents
|
19/08/2019 15:17:57 |
Contaminated Land Assessment STR4646 - Part 1
|
Supporting Documents
|
19/08/2019 15:17:31 |
Statement of Community Involvement
|
Supporting Documents
|
19/08/2019 15:17:22 |
DAS_Rev D_10 of 10
|
Design and Access Statement
|
19/08/2019 15:16:25 |
DAS_Rev D_9 of 10
|
Design and Access Statement
|
19/08/2019 15:16:16 |
DAS_Rev D_8 of 10
|
Design and Access Statement
|
19/08/2019 15:15:18 |
DAS_Rev D_7 of 10
|
Design and Access Statement
|
19/08/2019 15:15:07 |
DAS_Rev D_6 of 10
|
Design and Access Statement
|
19/08/2019 15:14:52 |
DAS_Rev D_5 of 10
|
Design and Access Statement
|
19/08/2019 15:14:35 |
DAS_Rev D_4 of 10
|
Design and Access Statement
|
19/08/2019 15:14:24 |
DAS_Rev D_3 of 10
|
Design and Access Statement
|
19/08/2019 15:14:13 |
DAS_Rev D_2 of 10
|
Design and Access Statement
|
19/08/2019 15:13:50 |
DAS_Rev D_1 of 10
|
Design and Access Statement
|
19/08/2019 15:13:38 |
SP108_SK15_ET - Existing trees
|
Existing Drawing
|
19/08/2019 15:13:32 |
**superseded** SP108_Doc01_TM_P1 - Proposed tree matrix
|
Supporting Documents
|
19/08/2019 15:13:24 |
SP108_61_RT_P1 - Proposed roof terrace section
|
Proposed Drawing
|
19/08/2019 15:13:17 |
**superseded** SP108_54_EF_P1 - Proposed landscape section EE FF
|
Proposed Drawing
|
19/08/2019 15:13:10 |
**superseded** SP108_53_CD_P1 - Proposed landscape section CC DD
|
Proposed Drawing
|
19/08/2019 15:12:59 |
**superseded** SP108_52_BB_P1 - Proposed landscape section BB
|
Proposed Drawing
|
19/08/2019 15:12:51 |
**superseded** SP108_51_A2_P1 - Proposed landscape section looking south
|
Proposed Drawing
|
19/08/2019 15:12:37 |
**superseded** SP108_51_A1_P1 - Proposed landscape section looking north
|
Proposed Drawing
|
19/08/2019 15:12:22 |
SP108_32_PT_P1 - Roof terrace sample planting plan
|
Proposed Drawing
|
19/08/2019 15:12:15 |
**superseded** SP108_31_PP_P1 - Proposed planting plan - public space
|
Proposed Drawing
|
19/08/2019 15:11:37 |
**superseded** SP108_12_02_P1 - Proposed plan - St Pancras Way landscaping
|
Proposed Drawing
|
19/08/2019 15:10:54 |
**superseded** SP108_11_01_P1 - Proposed plan - public space Georgiana Street
|
Proposed Drawing
|
19/08/2019 15:10:36 |
**superseded** SP108_03_RF_P1 - Proposed plan - ROOF LANDSCAPE
|
Proposed Drawing
|
19/08/2019 15:10:30 |
**superseded** SP108_02_GM_P1 - Proposed plan - GROUND MATERIALS
|
Proposed Drawing
|
19/08/2019 14:42:59 |
**superseded** 477_CSJ_00_02_FP_A_3105_S1_P01 - Proposed 2nd floor plan
|
Proposed Drawing
|
19/08/2019 14:43:13 |
**superseded** 477_CSJ_00_03_FP_A_3106_S1_P01 - Proposed 3rd floor plan
|
Proposed Drawing
|
19/08/2019 14:43:20 |
**superseded** 477_CSJ_00_04_FP_A_3107_S1_P01 - Proposed 4th floor plan
|
Proposed Drawing
|
19/08/2019 14:43:27 |
**superseded** 477_CSJ_00_05_FP_A_3108_S1_P01 - Proposed 5th floor plan
|
Proposed Drawing
|
19/08/2019 14:43:34 |
**superseded** 477_CSJ_00_06_FP_A_3109_S1_P01 - Proposed 6th floor
|
Proposed Drawing
|
19/08/2019 14:43:41 |
**superseded** 477_CSJ_00_07_FP_A_3110_S1_P01 - Proposed 7th floor
|
Proposed Drawing
|
19/08/2019 14:43:52 |
**superseded** 477_CSJ_00_B1_FP_A_3101_S1_P01 - Proposed basement plan
|
Proposed Drawing
|
19/08/2019 14:43:58 |
477_CSJ_00_GF_FP_A_0100_S1_P02 - Existing ground floor
|
Existing Drawing
|
19/08/2019 14:44:05 |
**superseded** 477_CSJ_00_GF_FP_A_3102_S1_P03 - Proposed ground floor plan
|
Proposed Drawing
|
19/08/2019 14:44:12 |
477_CSJ_00_GF_SI_A_0003_S1_P01(1) - Existing site plan ground floor
|
Existing Drawing
|
19/08/2019 14:44:38 |
477_CSJ_00_GF_SI_A_2000_S1_P02 - Proposed site plan
|
Proposed Drawing
|
19/08/2019 14:44:44 |
477_CSJ_00_M1_FP_A_0101_S1_P01 - Existing mezzanine
|
Existing Drawing
|
19/08/2019 14:44:52 |
**superseded** 477_CSJ_00_M1_FP_A_3103_S1_P01 - Proposed mezzanine
|
Proposed Drawing
|
19/08/2019 14:44:58 |
477_CSJ_00_ZZ_EL_A_0300_S1_P01 - Existing elevation internal street
|
Existing Drawing
|
19/08/2019 14:45:04 |
477_CSJ_00_ZZ_EL_A_0301_S1_P01 - Existing - Elevation - Royal College St & St Pancras Way
|
Existing Drawing
|
19/08/2019 14:45:15 |
477_CSJ_00_ZZ_EL_A_0302_S1_P01 - Existing - Elevation - Pratt St & Georgiana St
|
Existing Drawing
|
19/08/2019 14:45:22 |
**superseded** 477_CSJ_00_ZZ_EL_A_3300_S1_P01 - Proposed Elevation - Royal College St & Georgiana St
|
Proposed Drawing
|
19/08/2019 14:45:32 |
**superseded** 477_CSJ_00_ZZ_EL_A_3301_S1_P01 - Proposed Elevation - St Pancras Way & Pratt St
|
Proposed Drawing
|
19/08/2019 14:45:42 |
477_CSJ_00_ZZ_SC_A_0200_S1_P02 - Existing - Section
|
Existing Drawing
|
19/08/2019 14:45:49 |
**superseded** 477_CSJ_00_ZZ_SC_A_3200_S1_P01 - Proposed Section - AA1/BB1
|
Proposed Drawing
|
19/08/2019 14:45:57 |
**superseded** 477_CSJ_00_ZZ_SC_A_3201_S1_P01 - Proposed Section - AA2/BB2
|
Proposed Drawing
|
19/08/2019 14:46:07 |
**superseded** 477_CSJ_00_ZZ_SC_A_3202_S1_P01 - Proposed Section - AA3/BB3
|
Proposed Drawing
|
19/08/2019 14:46:17 |
**superseded** 477_CSJ_00_ZZ_SC_A_3203_S1_P01 - Proposed Section - AA4/BB6
|
Proposed Drawing
|
19/08/2019 14:46:27 |
**superseded** 477_CSJ_00_ZZ_SC_A_3204_S1_P01 - Proposed Section - AA5/AA6
|
Proposed Drawing
|
19/08/2019 14:46:37 |
477_CSJ_00_ZZ_SI_A_0001_S1_P02(1) - Location plan
|
OS Extract
|
19/08/2019 14:46:52 |
477_CSJ_00_ZZ_SI_A_0002_S1_P02 - Exisitng Site Plan
|
Existing Drawing
|
19/08/2019 14:46:59 |
477_CSJ_A1_ZZ_DE_A_7030_S1_P01 - Proposed Detail Elevation - Residential - Top Floor
|
Proposed Drawing
|
19/08/2019 14:47:06 |
**superseded** 477_CSJ_C1_ZZ_DE_A_7001_S1_P01 - Proposed Detail Elevation - Office - Typical
|
Proposed Drawing
|
19/08/2019 14:47:16 |
**superseded** 477_CSJ_C1_ZZ_DE_A_7002_S1_P01 - Proposed Detail Elevation - Office - Entrance
|
Proposed Drawing
|
19/08/2019 14:49:05 |
**superseded** 477_CSJ_C1_ZZ_DE_A_7003_S1_P01 - Proposed Detail Elevation - Office - 4th Floor Terrace
|
Proposed Drawing
|
19/08/2019 14:49:14 |
**superseded** 477_CSJ_C1_ZZ_DE_A_7004_S1_P01 - Proposed Detail Elevation - Light Industry - Facade
|
Proposed Drawing
|
19/08/2019 14:49:24 |
**superseded** 477_CSJ_C1_ZZ_DE_A_7005_S1_P01 - Proposed Detail Elevation - Office - Plant Screen
|
Proposed Drawing
|
19/08/2019 14:49:35 |
**superseded** 477_CSJ_C1_ZZ_DE_A_7006_S1_P01 - Proposed Detail Elevation - Office - Gate
|
Proposed Drawing
|
19/08/2019 14:49:43 |
**superseded** 477_CSJ_M1_ZZ_DE_A_7020_S1_P01 - Proposed Detail Elevation - Residential - Terrace with residential entrance
|
Proposed Drawing
|
19/08/2019 14:49:53 |
**superseded** 477_CSJ_M1_ZZ_DE_A_7021_S1_P01 - Proposed Detail Elevation - Residential - Terrace with retail entrance
|
Proposed Drawing
|
19/08/2019 14:50:00 |
**superseded** 477_CSJ_M1_ZZ_DE_A_7022_S1_P01 - Proposed Detail Elevation - Residential - Typical
|
Proposed Drawing
|
19/08/2019 14:50:08 |
**superseded** 477_St Pancras_Drawing Issue Register_190808
|
Other
|
19/08/2019 14:50:14 |
2930_01_D18259_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:50:27 |
2930_01_D18259_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:50:44 |
2930_01_D18259_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:50:55 |
2930_02_D18260_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:51:05 |
2930_02_D18260_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:51:16 |
2930_02_D18260_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:51:25 |
2930_06_D18261_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:51:36 |
2930_06_D18261_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:51:46 |
2930_06_D18261_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:52:04 |
2930_07_D18262_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:52:24 |
2930_07_D18262_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:52:33 |
2930_07_D18262_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:52:45 |
2930_08_D18263_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:52:53 |
2930_08_D18263_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:53:03 |
2930_08_D18263_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:53:12 |
2930_09_D18264_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:53:20 |
2930_09_D18264_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:53:28 |
2930_09_D18264_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:53:40 |
PL2930_10_D18268_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:53:55 |
2930_10_D18268_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:54:05 |
2930_10_D18268_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:54:16 |
2930_14_D18269_E_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:54:32 |
2930_14_D18269_EP_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:54:43 |
2930_14_D18269_EPC_Fullres_260719
|
Supporting Documents
|
19/08/2019 14:54:51 |
190229-PD-10 Tree Schedule
|
Supporting Documents
|
19/08/2019 14:55:04 |
Archaeological Assessment Pt 1
|
Supporting Documents
|
19/08/2019 14:55:15 |
Archaeological Assessment Pt 2
|
Supporting Documents
|
19/08/2019 14:56:10 |
Archaeological Assessment Pt 3
|
Supporting Documents
|
19/08/2019 14:56:58 |
Affordable Housing Statement
|
Supporting Documents
|
19/08/2019 14:57:05 |
Air Quality Assessment
|
Supporting Documents
|
19/08/2019 14:57:39 |
Application Form - No Personal Data
|
Application Form
|
19/08/2019 14:57:50 |
Arboricultural Impact Assessment Report
|
Supporting Documents
|
19/08/2019 14:58:09 |
**superseded** Basement Impact Assessment
|
Supporting Documents
|
19/08/2019 14:58:23 |
CIL Questions Form
|
CIL
|
19/08/2019 15:05:12 |
Construction Environment Management Plan Pt 1
|
Supporting Documents
|
19/08/2019 15:05:25 |
Construction Environment Management Plan Pt 2
|
Supporting Documents
|
19/08/2019 15:05:57 |
Covering Letter
|
Supporting Documents
|
19/08/2019 15:06:15 |
Daylight and Sunlight Assessment (see later amended version)
|
Supporting Documents
|
19/08/2019 15:07:18 |
Delivery and Servicing Plan
|
Supporting Documents
|
19/08/2019 15:07:31 |
Ecology Report
|
Supporting Documents
|
19/08/2019 15:08:22 |
Flood Risk Assessment Pt 1
|
Supporting Documents
|
19/08/2019 15:08:36 |
Flood Risk Assessment Pt 2
|
Supporting Documents
|
19/08/2019 15:08:46 |
Noise Vibration and Ventilation Assessment
|
Supporting Documents
|
19/08/2019 15:09:29 |
Planning Statement
|
Supporting Documents
|
19/08/2019 15:09:37 |
Proposed Area Schedule (see later amended version)
|
Supporting Documents
|
19/08/2019 15:09:45 |
Existing Site Block Plan
|
Existing Drawing
|
19/08/2019 15:10:14 |
SP108_00_ET_P1 - Existing / tree removals plan
|
Existing Drawing
|
19/08/2019 15:10:20 |
**superseded** SP108_01_GP_P1: Proposed plan TREES
|
Proposed Drawing
|