25/06/2014 23:26:00 |
BASEMENT CONTAINING & CABLING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:01 |
BASEMENT COORDINATED ELECTRICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:02 |
BASEMENT COORDINATED MECHANICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:04 |
BASEMENT COORDINATED SERVICES SECTIONS 1
|
Proposed Drawing
|
25/06/2014 23:26:04 |
BASEMENT COORDINATED SERVICES SECTIONS 2
|
Proposed Drawing
|
25/06/2014 23:26:05 |
BASEMENT COORDINATED SERVICES SECTIONS 3
|
Proposed Drawing
|
25/06/2014 23:26:06 |
BASEMENT DOMESTIC WATER SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:07 |
BASEMENT DRAINAGE SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:08 |
BASEMENT FIRE PROTECTION ZONES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:08 |
BASEMENT HEATING SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:09 |
BASEMENT LIGHTING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:10 |
BASEMENT SMALL POWER & ANCILLARY LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:11 |
BASEMENT VENTILATION SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:12 |
ELECTRICAL SERVICES ISSUE SHEET
|
Supporting Documents
|
25/06/2014 23:26:12 |
FIRST FLOOR CONTAINMENT & CABLING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:13 |
FIRST FLOOR COORDINATED ELECTRICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:14 |
FIRST FLOOR COORDINATED MECHANICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:14 |
FIRST FLOOR COORDINATED SERVICES SECTIONS 1
|
Proposed Drawing
|
25/06/2014 23:26:15 |
FIRST FLOOR COORDINATED SERVICES SECTIONS 2
|
Proposed Drawing
|
25/06/2014 23:26:16 |
FIRST FLOOR COORDINATED SERVICES SECTIONS 3.PDF
|
Proposed Drawing
|
25/06/2014 23:26:16 |
FIRST FLOOR DOMESTIC WATER SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:17 |
FIRST FLOOR DRAINAGE SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:17 |
FIRST FLOOR FIRE PROTECTION ZONES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:18 |
FIRST FLOOR HEATING SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:19 |
FIRST FLOOR LIGHTING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:19 |
FIRST FLOOR SMALL POWER & ANCILLARY LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:20 |
FIRST FLOOR VENTILATION SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:21 |
GROUND FLOOR CONTAINMENT & CABLING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:21 |
GROUND FLOOR COORDINATED ELECTRICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:22 |
GROUND FLOOR COORDINATED MECHANICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:23 |
GROUND FLOOR COORDINATED SERVICES SECTIONS 1
|
Proposed Drawing
|
25/06/2014 23:26:23 |
GROUND FLOOR COORDINATED SERVICES SECTIONS 2
|
Proposed Drawing
|
25/06/2014 23:26:24 |
GROUND FLOOR COORDINATED SERVICES SECTIONS 3
|
Proposed Drawing
|
25/06/2014 23:26:25 |
GROUND FLOOR DOMESTIC WATER SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:25 |
GROUND FLOOR DRAINAGE SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:26 |
GROUND FLOOR FIRE PROTECTION ZONES
|
Proposed Drawing
|
25/06/2014 23:26:27 |
GROUND FLOOR HEATING SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:28 |
GROUND FLOOR LIGHTING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:30 |
GROUND FLOOR SMALL POWER & ANCILLARY LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:31 |
GROUND FLOOR VENTILATION SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:34 |
MECHANICAL SERVICES ISSUE SHEET
|
Supporting Documents
|
25/06/2014 23:26:36 |
ROOF LEVEL COORDINATED ELECTRICAL SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:38 |
ROOF LEVEL ELECTRIC CONTAINMENT LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:39 |
ROOF LEVEL FIRE PROTECTION LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:41 |
ROOF LEVEL LIGHTING LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:42 |
ROOF LEVEL SMALL POWER & ANCILLARY LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:42 |
ROOF LEVEL VENTILATION SERVICES LAYOUT
|
Proposed Drawing
|
25/06/2014 23:26:43 |
THE ELMS MECHANICAL AND ELECTRICAL METHOD STATEMENT
|
Supporting Documents
|
26/06/2014 19:14:40 |
REPORT ON SKIRTING, CORNICES, ETC (BY LUARD CONSERVATION LTD)
|
Supporting Documents
|
26/06/2014 19:14:40 |
REPORT ON WINDOWS (BY LUARD CONSERVATION LTD)
|
Supporting Documents
|
26/06/2014 19:14:41 |
REPORT ON WINDOWS OPENINGS (BY LUARD CONSERVATION LTD)
|
Supporting Documents
|
26/06/2014 19:14:41 |
RESPONSE TO CAMDEN COUNCIL BY LUARD CONSERVATION LTD
|
Supporting Documents
|
26/06/2014 19:14:43 |
ATRIUM DESIGN REVIEW
|
Supporting Documents
|
26/06/2014 19:14:43 |
CONCRETE FLOOR REVIEW
|
Supporting Documents
|
26/06/2014 19:14:44 |
ROOF OPTIONS - PLANS & SECTIONS
|
Proposed Drawing
|
26/06/2014 19:14:45 |
HERITAGE STATEMENT
|
Supporting Documents
|
26/06/2014 19:14:46 |
WINDOW PAINT REPORT
|
Supporting Documents
|
26/06/2014 19:14:57 |
BATHROOM DETAILS
|
Superseded
|
26/06/2014 19:15:42 |
SCHEDULE OF WORKS
|
Supporting Documents
|
26/06/2014 19:15:42 |
VERANDA CONDITION REPORT
|
Supporting Documents
|
26/06/2014 19:15:44 |
VERANDA REPORT COVER LETTER
|
Supporting Documents
|
26/06/2014 19:15:46 |
FOR FURTHER INFORMATION SEE 2013/5764/P
|
Application Form
|
26/06/2014 19:16:13 |
SITE PLAN
|
Existing Drawing
|
26/06/2014 19:16:14 |
BASEMENT PLAN
|
Proposed Drawing
|
26/06/2014 19:16:14 |
GROUND FLOOR PLAN
|
Proposed Drawing
|
26/06/2014 19:16:15 |
FIRST FLOOR PLAN
|
Proposed Drawing
|
26/06/2014 19:16:16 |
EAST ELEVATION
|
Proposed Drawing
|
26/06/2014 19:16:16 |
SOUTH ELEVATION
|
Proposed Drawing
|
26/06/2014 19:16:17 |
WEST ELEVATION
|
Proposed Drawing
|
26/06/2014 19:16:18 |
WINTER GARDEN SECTION
|
Proposed Drawing
|
26/06/2014 19:16:18 |
REPORT ON THE SIGNIFICANCE OF 'THE ELMS'
|
Supporting Documents
|
26/06/2014 19:16:19 |
COVER LETTER
|
Applicant Correspondence
|
26/06/2014 19:16:26 |
APPENDIX 1
|
Design and Access Statement
|
26/06/2014 19:16:28 |
APPENDIX 2
|
Design and Access Statement
|
26/06/2014 19:16:29 |
APPENDIX 3 (PART 1)
|
Design and Access Statement
|
26/06/2014 19:16:30 |
APPENDIX 3 (PART 2)
|
Design and Access Statement
|
26/06/2014 19:16:32 |
APPENDIX 3 (PART 3)
|
Design and Access Statement
|
26/06/2014 19:16:33 |
APPENDIX 3 (PART 4)
|
Design and Access Statement
|
26/06/2014 19:16:33 |
APPENDIX 4
|
Design and Access Statement
|
26/06/2014 19:16:35 |
PART 1-2
|
Design and Access Statement
|
26/06/2014 19:16:35 |
PART 3
|
Design and Access Statement
|
26/06/2014 19:16:36 |
PART 4
|
Design and Access Statement
|
26/06/2014 19:16:37 |
PART 5-6
|
Design and Access Statement
|
26/06/2014 19:16:38 |
PART 7
|
Design and Access Statement
|
26/06/2014 19:20:22 |
DRAWING ISSUE 3
|
Supporting Documents
|
21/07/2014 14:26:01 |
PROTOCOL FOR THE REPAIR OF THE TIMBER WINDOWS
|
Supporting Documents
|
21/07/2014 18:32:32 |
SCHEDULE OF DOCUMENTS
|
Supporting Documents
|
21/07/2014 19:16:44 |
WINDOW REPORT - WINDOW 11
|
Supporting Documents
|
21/07/2014 19:16:45 |
WINDOW REPORT - WINDOW 13
|
Supporting Documents
|
21/07/2014 19:16:45 |
WINDOW REPORT - WINDOW 20
|
Supporting Documents
|
21/07/2014 20:03:39 |
AS EXISTING DRAWING SCHEDULE
|
Drawing
|
21/07/2014 20:03:39 |
AS EXISTING BASEMENT PLAN
|
Drawing
|
21/07/2014 20:03:40 |
AS EXISTING BASEMENT PLAN - PHOTO
|
Drawing
|
21/07/2014 20:03:41 |
AS EXISTING GROUND FLOOR PLAN
|
Drawing
|
21/07/2014 20:03:41 |
AS EXISTING GROUND FLOOR PLAN - PHOTO
|
Drawing
|
21/07/2014 20:03:43 |
AS EXISTING FIRST FLOOR PLAN
|
Drawing
|
21/07/2014 20:03:43 |
AS EXISTING FIRST FLOOR PLAN - PHOTO
|
Drawing
|
21/07/2014 20:03:44 |
AS EXISTING SECOND FLOOR PLAN
|
Drawing
|
21/07/2014 20:03:47 |
AS EXISTING ROOF PLAN
|
Drawing
|
21/07/2014 20:03:47 |
AS EXISTING EAST ELEVATION
|
Drawing
|
21/07/2014 20:03:48 |
AS EXISTING SOUTH ELEVATION
|
Drawing
|
21/07/2014 20:03:49 |
AS EXISTING WEST ELEVATION
|
Drawing
|
21/07/2014 20:03:49 |
AS EXISTING WINTER GARDEN SECTION
|
Drawing
|
21/07/2014 20:03:51 |
AS EXISTING SECTION AA
|
Drawing
|
21/07/2014 20:03:52 |
AS EXISTING SECTION BB
|
Drawing
|
21/07/2014 20:03:53 |
AS EXISTING SECTION CC
|
Drawing
|
21/07/2014 21:14:11 |
MORTAR ANALYSIS COVER LETTER
|
Supporting Documents
|
21/07/2014 21:14:11 |
MORTAR ANALYSIS REPORT
|
Supporting Documents
|
24/03/2015 11:27:33 |
492 - Revised The Elms Windows Drawings Package EFP 001-022
|
Supporting Documents
|
24/03/2015 11:29:04 |
492-109D - First Floor Plan Revised v2015
|
Proposed Drawing
|
24/03/2015 11:29:17 |
492-111C - Second Floor Plan Revised v2015
|
Proposed Drawing
|
24/03/2015 11:29:34 |
492-112C - Roof Plan Revised v2015
|
Proposed Drawing
|
24/03/2015 11:29:45 |
492-210C East Elevation Revised v2015
|
Proposed Drawing
|
24/03/2015 11:29:57 |
492-213C Winter Gdn Section E-W Revised v2015
|
Proposed Drawing
|
01/06/2015 12:46:58 |
Proposed Second Floor v2015 - 492-111F
|
Proposed Drawing
|
09/06/2015 15:13:28 |
492-109D - First Floor Plan v2015(2)
|
Proposed Drawing
|
09/06/2015 15:13:46 |
492-210C East Elevation v2015
|
Proposed Drawing
|
09/06/2015 15:14:06 |
492-111C - Second Floor Plan v2015
|
Proposed Drawing
|
09/06/2015 15:14:34 |
492-213C Winter Gdn Section E-W v2015
|
Proposed Drawing
|
09/06/2015 15:14:48 |
492-112C - Roof Plan v2015
|
Proposed Drawing
|
30/06/2015 14:24:45 |
150212 Drawing cover letter copy (Redacted)
|
Supporting Documents
|
16/07/2015 19:36:15 |
Delegated Report
|
Officer Delegated Report
|
20/07/2015 18:17:13 |
Decision Notice Final
|
Decision Notice
|
25/06/2014 20:05:12 |
LIBRARY DOOR REPORT
|
Supporting Documents
|
25/06/2014 21:27:59 |
WINDOW REPORT
|
Supporting Documents
|
25/06/2014 21:40:16 |
SCHEDULE OF DOCS (AS OF 15/02/2014)
|
Supporting Documents
|
25/06/2014 21:40:17 |
BASEMENT PLAN
|
Proposed Drawing
|
25/06/2014 21:40:17 |
ENFORCEMENT NOTICE SCHEDULE
|
Supporting Documents
|
25/06/2014 21:40:18 |
WINTER GARDEN DETAILS
|
Existing Drawing
|
25/06/2014 22:51:24 |
GROUND FLOOR STUDY (ROOF G13)
|
Existing Drawing
|
25/06/2014 22:51:26 |
FIRST FLOOR BATHROOM (ROOM 1.15)
|
Existing Drawing
|
25/06/2014 22:51:27 |
FIRST FLOOR BEDROOM (ROOM 1.11)
|
Existing Drawing
|
25/06/2014 22:51:28 |
FIRST FLOOR BEDROOM (ROOM 1.18 & 19)
|
Existing Drawing
|
25/06/2014 22:51:29 |
BASEMENT BEDROOM (ROOM B9)
|
Existing Drawing
|
25/06/2014 22:51:29 |
FIRST FLOOR BEDROOM, BATHROOM, LOBBY (ROOM 1.16, 17 & 20) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:51:31 |
FIRST FLOOR BEDROOM, BATHROOM, LOBBY (ROOM 1.16, 17 & 20) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:51:31 |
FIRST FLOOR BEDROOM (ROOM 1.12) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:51:33 |
FIRST FLOOR BEDROOM (ROOM 1.12) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:51:34 |
BASEMENT CENTRAL STAIR (ROOM B 22) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:51:35 |
BASEMENT CENTRAL STAIR (ROOM B 22) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:51:36 |
FIRST FLOOR DRESSING ROOM (ROOM 1.14)
|
Existing Drawing
|
25/06/2014 22:51:37 |
GROUND FLOOR ENTRANCE HALL & DRESSING ROOM (ROOM G14 & 15) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:51:39 |
GROUND FLOOR ENTRANCE HALL & DRESSING ROOM (ROOM G14 & 15) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:51:40 |
BASEMENT ENTRANCE HALL & DRESSING ROOM (ROOM B7)
|
Existing Drawing
|
25/06/2014 22:51:41 |
EXISTING DRAWING GENERAL ARRANGEMENT SCHEDULE 1
|
Supporting Documents
|
25/06/2014 22:51:42 |
EXISTING DRAWING GENERAL ARRANGEMENT SCHEDULE 2
|
Supporting Documents
|
25/06/2014 22:51:43 |
EXISTING DRAWING GENERAL ARRANGEMENT SCHEDULE 3
|
Supporting Documents
|
25/06/2014 22:51:43 |
INTERNAL DOORS
|
Existing Drawing
|
25/06/2014 22:51:44 |
JOINERY ( 2 OF 2)
|
Existing Drawing
|
25/06/2014 22:51:45 |
JOINERY ( 1 OF 2)
|
Existing Drawing
|
25/06/2014 22:51:46 |
BASEMENT KITCHEN (ROOM B10)
|
Existing Drawing
|
25/06/2014 22:51:46 |
BASEMENT LAUNDRY ROOM (ROOM B6)
|
Existing Drawing
|
25/06/2014 22:51:47 |
GROUND FLOOR LIBRARY (ROOM G10)
|
Existing Drawing
|
25/06/2014 22:51:49 |
BASEMENT LOBBY (ROOM B24)
|
Existing Drawing
|
25/06/2014 22:51:49 |
GROUND FLOOR ORIGINAL HALLWAY (ROOM G12)
|
Existing Drawing
|
25/06/2014 22:51:51 |
BASEMENT SECURITY ROOM (ROOM B8)
|
Existing Drawing
|
25/06/2014 22:51:52 |
BASEMENT SHOWER (ROOM B11)
|
Existing Drawing
|
25/06/2014 22:51:53 |
FIRST FLOOR SHOWER (ROOM 1.10)
|
Existing Drawing
|
25/06/2014 22:51:54 |
GROUND FLOOR SITTING ROOM (ROOM G11) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:51:56 |
GROUND FLOOR SITTING ROOM (ROOM G11) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:51:56 |
FIRST FLOOR LANDING STAIR (ROOM 1.13
|
Existing Drawing
|
25/06/2014 22:51:57 |
BASEMENT STORE (ROOM B12
|
Existing Drawing
|
25/06/2014 22:51:58 |
GROUND FLOOR STUDY (ROOM G.16) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:51:59 |
GROUND FLOOR STUDY (ROOM G.16) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:52:00 |
BASEMENT TENNIS ROOM (ROOM B13) 1 OF 2
|
Existing Drawing
|
25/06/2014 22:52:01 |
BASEMENT TENNIS ROOM (ROOM B13) 2 OF 2
|
Existing Drawing
|
25/06/2014 22:52:01 |
UPPER GALLERY/HALLWAY (ROOM 1.9)
|
Existing Drawing
|
25/06/2014 22:52:02 |
GROUND FLOOR WC (ROOM G19)
|
Existing Drawing
|
25/06/2014 22:52:03 |
BASEMENT WC (ROOM B23)
|
Existing Drawing
|
25/06/2014 22:52:04 |
BASEMENT WINE BAR (ROOM B15)
|
Existing Drawing
|
25/06/2014 22:52:04 |
BASEMENT WINE CELLAR (ROOM B15)
|
Existing Drawing
|
25/06/2014 22:52:05 |
SCHEDULE OF WORKS
|
Supporting Documents
|
25/06/2014 22:52:05 |
SPECIFICATIONS OF WORK
|
Supporting Documents
|
25/06/2014 23:05:55 |
PROPOSED PLANS & ELEVATIONS DRAWING SCHEDULE
|
Supporting Documents
|
25/06/2014 23:05:55 |
BASEMENT PLAN
|
Proposed Drawing
|
25/06/2014 23:05:56 |
EAST ELEVATION
|
Proposed Drawing
|
25/06/2014 23:05:57 |
FIRST FLOOR PLAN
|
Proposed Drawing
|
25/06/2014 23:05:58 |
GROUND FLOOR PLAN
|
Proposed Drawing
|
25/06/2014 23:05:59 |
NORTH ELEVATION
|
Proposed Drawing
|
25/06/2014 23:05:59 |
SECOND FLOOR PLAN
|
Proposed Drawing
|
25/06/2014 23:06:00 |
SECTION AA
|
Proposed Drawing
|
25/06/2014 23:06:01 |
SECTION BB
|
Proposed Drawing
|
25/06/2014 23:06:02 |
SECTION CC
|
Proposed Drawing
|
25/06/2014 23:06:03 |
SOUTH ELEVATION
|
Proposed Drawing
|
25/06/2014 23:06:04 |
WEST ELEVATION
|
Proposed Drawing
|
25/06/2014 23:06:05 |
WINTER GARDEN SECTION EAST - WEST
|
Proposed Drawing
|
25/06/2014 23:09:29 |
ROOF PLAN
|
Proposed Drawing
|
26/06/2014 16:42:27 |
OS Extract
|
OS Extract
|
26/06/2014 16:42:28 |
MORTAN ANALYSIS REPORT
|
Supporting Documents
|
26/06/2014 16:42:28 |
MORTAN ANALYSIS BY METHODS REPORT
|
Supporting Documents
|
26/06/2014 19:13:55 |
DRAWING ISSUE 1
|
Supporting Documents
|
26/06/2014 19:13:56 |
DRAWING ISSUE 2
|
Supporting Documents
|
26/06/2014 19:13:57 |
DRAWING ISSUE - GENERAL ARRANGEMENTS
|
Supporting Documents
|
26/06/2014 19:14:37 |
ASSESSMENT OF TIMBER (BY LUARD CONSERVATION LTD)
|
Supporting Documents
|
26/06/2014 19:14:38 |
REPORT ON DOORS (BY LUARD CONSERVATION LTD)
|
Supporting Documents
|
26/06/2014 19:14:39 |
REPORT ON FLOORS (BY LUARD CONSERVATION LTD)
|
Supporting Documents
|