04/04/2025 09:11:55 |
1 x Response (Redacted)
|
Consultation Response
|
03/04/2025 10:15:56 |
1 x Response (Redacted)
|
Consultation Response
|
26/03/2025 16:14:54 |
Proposed Maximum Heights 4602_001-GRID-00-100L-DR-A-(02)_P111
|
Proposed Drawing
|
26/03/2025 16:14:36 |
Proposed Site Levels 4602_001-GRID-00-100L-DR-A-(02)_P110
|
Proposed Drawing
|
26/03/2025 16:14:17 |
Proposed Predominant Upper Level Uses 4602_001-GRID-00-100L-DR-A-(02)_P109
|
Proposed Drawing
|
26/03/2025 16:13:55 |
Proposed Lower Ground & Ground Uses 4602_001-GRID-00-100L-DR-A-(02)_P108
|
Proposed Drawing
|
26/03/2025 16:13:36 |
Proposed Below Ground Uses 4602_001-GRID-00-100L-DR-A-(02)_P107
|
Proposed Drawing
|
26/03/2025 16:13:14 |
Proposed Vehicular Access from Planning Application Boundary 4602_001-GRID-00-100L-DR-A-(02)_P106
|
Proposed Drawing
|
26/03/2025 16:12:53 |
Proposed Basement Extents 4602_001-GRID-00-100L-DR-A-(02)_P105
|
Proposed Drawing
|
26/03/2025 16:12:31 |
Minimum and Maximum Building Footprints 4602_001-GRID-00-100L-DR-A-(02)_P104
|
Proposed Drawing
|
26/03/2025 16:12:11 |
Proposed Development Plots and Public Realm 4602_001-GRID-00-100L-DR-A-(02)_P103
|
Proposed Drawing
|
26/03/2025 16:11:50 |
Proposed Detail and Outline Elements and Development Plots 4602_001-GRID-00-100L-DR-A-(02)_P102
|
Proposed Drawing
|
26/03/2025 16:11:21 |
Outline Elements - Buildings To Be Demolished 4602_001-GRID-00-100L-DR-A-(02)_P101
|
Proposed Drawing
|
26/03/2025 16:10:58 |
Planning Application Boundary Plan 4602_001-GRID-00-100L-DR-A-(02)_P100
|
Proposed Drawing
|
21/03/2025 15:39:10 |
1 x Response (Redacted) NNA
|
Consultation Response
|
18/03/2025 09:52:01 |
1 x Response (Redacted)
|
Consultation Response
|
17/03/2025 12:07:54 |
1 x Response (Redacted)
|
Consultation Response
|
14/03/2025 11:10:52 |
7 x Responses (Redacted)
|
Consultation Response
|
14/03/2025 10:50:46 |
1 x Response from Cllrs Dixey, Kirk & Chung
|
Consultation Response
|
14/03/2025 10:50:27 |
1 x Response Cllr Jirra
|
Consultation Response
|
14/03/2025 10:50:05 |
1 x Response (Redacted) Heath Drive Association
|
Consultation Response
|
13/03/2025 17:36:36 |
1 x Response (Redacted)
|
Consultation Response
|
13/03/2025 16:13:11 |
1 x Response (Redacted)
|
Consultation Response
|
13/03/2025 15:43:23 |
1 x Response (Redacted)
|
Consultation Response
|
13/03/2025 10:43:26 |
1 x Response WHAT
|
Consultation Response
|
13/03/2025 10:28:31 |
1 x Response (Redacted)
|
Consultation Response
|
13/03/2025 10:03:05 |
9 x Responses
|
Consultation Response
|
12/03/2025 15:15:22 |
1 x Response (Redacted)
|
Consultation Response
|
12/03/2025 15:11:55 |
1 x Response (Redacted)
|
Consultation Response
|
12/03/2025 15:07:29 |
1 x Response CRASH
|
Consultation Response
|
12/03/2025 15:02:50 |
4 x Responses (Redacted)
|
Consultation Response
|
11/03/2025 15:55:56 |
1 x Response (Redacted)
|
Consultation Response
|
11/03/2025 15:53:44 |
1 x Response (Redacted)
|
Consultation Response
|
11/03/2025 15:47:23 |
1 x Response (Redacted)
|
Consultation Response
|
11/03/2025 10:42:45 |
2 x Responses
|
Consultation Response
|
10/03/2025 16:33:07 |
3 x Responses
|
Consultation Response
|
07/03/2025 13:42:28 |
1 x Response
|
Consultation Response
|
06/03/2025 14:56:54 |
1 x Response (Redacted)
|
Consultation Response
|
06/03/2025 09:26:24 |
1 x Response
|
Consultation Response
|
05/03/2025 09:35:40 |
1 x Response
|
Consultation Response
|
05/03/2025 07:40:43 |
Southwark - No Comments
|
Consultation Response
|
03/03/2025 16:57:27 |
1 x Response HSE
|
Consultation Response
|
03/03/2025 10:38:51 |
2 x Responses
|
Consultation Response
|
28/02/2025 12:56:05 |
1 x Response
|
Consultation Response
|
28/02/2025 11:25:21 |
Historic England comments
|
Consultation Response
|
28/02/2025 10:27:29 |
Westminster - No objection
|
Consultation Response
|
27/02/2025 09:10:21 |
1 x Response (Redacted) UK Power Networks
|
Consultation Response
|
26/02/2025 15:34:21 |
London Underground Response
|
Consultation Response
|
25/02/2025 15:19:53 |
1 x response
|
Consultation Response
|
25/02/2025 11:09:35 |
1 x Response
|
Consultation Response
|
24/02/2025 14:32:34 |
1 x response
|
Consultation Response
|
24/02/2025 14:32:10 |
2 x Responses
|
Consultation Response
|
21/02/2025 09:04:45 |
Haringey - no objection
|
Consultation Response
|
13/02/2025 12:32:16 |
O2 Finchley Road - Basement Impact Assessment
|
Supporting Documents
|
13/02/2025 12:05:59 |
Supplementary Internal DLSLO Report
|
Supporting Documents
|
13/02/2025 12:02:08 |
Appendix 6.11.5.pdf
|
Supporting Documents
|
13/02/2025 12:01:47 |
Statement of Community Involvement
|
Supporting Documents
|
13/02/2025 12:01:25 |
Energy Statement Addendum - O2 Masterplan – Section 73 Application
|
Supporting Documents
|
13/02/2025 09:00:46 |
22036_Area Schedule
|
Supporting Documents
|
11/02/2025 15:31:38 |
1 x Response Env Health
|
Consultation Response
|
10/02/2025 11:22:39 |
Drawing Register O2 Finchley Road S73 Detailed Element
|
Supporting Documents
|
10/02/2025 11:20:46 |
22036 Design and Access Statement (Combined)
|
Design and Access Statement
|
10/02/2025 11:20:14 |
22036 Design and Access Statement - Section 11
|
Design and Access Statement
|
10/02/2025 11:19:42 |
22036 Design and Access Statement - Section 10
|
Design and Access Statement
|
10/02/2025 11:19:17 |
22036 Design and Access Statement - Section 09
|
Design and Access Statement
|
10/02/2025 11:18:48 |
22036 Design and Access Statement - Section 08
|
Design and Access Statement
|
10/02/2025 11:17:53 |
22036 Design and Access Statement - Section 07
|
Design and Access Statement
|
10/02/2025 11:17:28 |
22036 Design and Access Statement - Section 06
|
Design and Access Statement
|
10/02/2025 11:16:53 |
22036 Design and Access Statement - Section 05
|
Design and Access Statement
|
10/02/2025 11:16:31 |
22036 Design and Access Statement - Section 04
|
Design and Access Statement
|
10/02/2025 11:16:07 |
22036 Design and Access Statement - Section 03
|
Design and Access Statement
|
10/02/2025 11:15:40 |
22036 Design and Access Statement - Section 02
|
Design and Access Statement
|
10/02/2025 11:15:10 |
22036 Design and Access Statement - Section 01
|
Design and Access Statement
|
10/02/2025 11:14:20 |
Proposed N5 Level 17 GA Plan 4602_001-GRID-N5Z-117R-DR-A-PL310117
|
Proposed Drawing
|
10/02/2025 11:13:40 |
Proposed N5 Level 16 GA Plan 4602_001-GRID-N5Z-116L-DR-A-PL310116
|
Proposed Drawing
|
10/02/2025 11:13:02 |
Proposed N5 Level 12-15 GA Plan 4602_001-GRID-N5Z-112L-DR-A-PL310112
|
Proposed Drawing
|
10/02/2025 11:12:30 |
Proposed N5 Level 11 GA Plan 4602_001-GRID-N5Z-111L-DR-A-PL310111
|
Proposed Drawing
|
10/02/2025 11:11:57 |
Proposed N5 Level 10 GA Plan 4602_001-GRID-N5Z-109L-DR-A-PL310110
|
Proposed Drawing
|
10/02/2025 11:11:19 |
Proposed N5 Level 02-09 GA Plan 4602_001-GRID-N5Z-102L-DR-A-PL310102
|
Proposed Drawing
|
10/02/2025 11:10:29 |
Proposed N5 Level 01 GA Plan 4602_001-GRID-N5Z-101L-DR-A-PL310101
|
Proposed Drawing
|
10/02/2025 11:09:14 |
Proposed N5 Ground Floor GA Plan 4602_001-GRID-N5Z-100L-DR-A-PL310100
|
Proposed Drawing
|
10/02/2025 11:08:34 |
Proposed N4 Level 16 GA Roof Plan 4602_001-GRID-N4Z-116R-DR-A-PL210116
|
Proposed Drawing
|
10/02/2025 11:07:54 |
Proposed N4 Level 15 GA Plan 4602_001-GRID-N4Z-115L-DR-A-PL210115
|
Proposed Drawing
|
10/02/2025 11:07:23 |
Proposed N4 Level 10 GA Plan 4602_001-GRID-N4Z-110L-DR-A-PL210110
|
Proposed Drawing
|
10/02/2025 11:06:41 |
Proposed N4 Level 9 GA Plan 4602_001-GRID-N4Z-109L-DR-A-PL210109
|
Proposed Drawing
|
10/02/2025 11:06:06 |
Proposed N4 Level 2-8 GA Plan 4602_001-GRID-N4Z-102L-DR-A-PL210102.pdf
|
Proposed Drawing
|
10/02/2025 11:05:30 |
Proposed N4 Level 1 GA Plan 4602_001-GRID-N4Z-101L-DR-A-PL210101
|
Proposed Drawing
|
10/02/2025 11:04:22 |
Proposed N4 Ground Floor GA Plan 4602_001-GRID-N4Z-100L-DR-A-PL210100
|
Proposed Drawing
|
06/02/2025 09:20:42 |
250205 Revised Application Covering Letter (Redacted)
|
Supporting Documents
|
06/02/2025 09:06:47 |
250205 S73 Condition Amendments
|
Supporting Documents
|
05/02/2025 10:58:23 |
CIL S73 Covering Letter (Redacted)
|
Supporting Documents
|
04/02/2025 17:11:01 |
Proposed N5 North GA Elevation 4602_001-GRID-N5Z-ZZZ-DR-A-PL300320.pdf
|
Proposed Drawing
|
04/02/2025 17:10:53 |
Proposed N5 2B3P 4602_001-GRID-N5Z-ZZZ-DR-A-PL310443.pdf
|
Proposed Drawing
|
04/02/2025 17:10:52 |
Proposed N5 2B3P 4602_001-GRID-N5Z-ZZZ-DR-A-PL310411.pdf
|
Proposed Drawing
|
04/02/2025 17:10:52 |
Proposed N5 Short GA Section East 4602_001-GRID-N5Z-ZZZ-DR-A-PL310302.pdf
|
Proposed Drawing
|
04/02/2025 17:10:51 |
Proposed N5 Short GA Section West 4602_001-GRID-N5Z-ZZZ-DR-A-PL310301.pdf
|
Proposed Drawing
|
04/02/2025 17:10:50 |
Proposed N5 West GA Elevation 4602_001-GRID-N5Z-ZZZ-DR-A-PL300323.pdf
|
Proposed Drawing
|
04/02/2025 17:10:50 |
Proposed N5 South GA Elevation 4602_001-GRID-N5Z-ZZZ-DR-A-PL300322.pdf
|
Proposed Drawing
|
04/02/2025 17:10:49 |
Proposed N5 East GA Elevation 4602_001-GRID-N5Z-ZZZ-DR-A-PL300321.pdf
|
Proposed Drawing
|
04/02/2025 17:10:35 |
Proposed N4 3B4P 34602_001-GRID-N4Z-ZZZ-DR-A-PL210409.pdf
|
Proposed Drawing
|
04/02/2025 17:10:35 |
Proposed N4 2B3P 4602_001-GRID-N4Z-ZZZ-DR-A-PL210407.pdf
|
Proposed Drawing
|
04/02/2025 17:10:34 |
Proposed N4 Short GA Section East 4602_001-GRID-N4Z-ZZZ-DR-A-PL210302.pdf
|
Proposed Drawing
|
04/02/2025 17:10:33 |
Proposed N4 Short GA Section West 4602_001-GRID-N4Z-ZZZ-DR-A-PL210301.pdf
|
Proposed Drawing
|
04/02/2025 17:10:33 |
Proposed N4 West GA Elevation 4602_001-GRID-N4Z-ZZZ-DR-A-PL200313.pdf
|
Proposed Drawing
|
04/02/2025 17:10:32 |
Proposed N4 South GA Elevation 4602_001-GRID-N4Z-ZZZ-DR-A-PL200312.pdf
|
Proposed Drawing
|
04/02/2025 17:10:31 |
Proposed N4 East GA Elevation 4602_001-GRID-N4Z-ZZZ-DR-A-PL200311.pdf
|
Proposed Drawing
|
04/02/2025 17:10:30 |
Proposed N4 North GA Elevation 4602_001-GRID-N4Z-ZZZ-DR-A-PL200310.pdf
|
Proposed Drawing
|
04/02/2025 17:10:28 |
Proposed N3E GA Section North 4602_001-GRID-N3E-ZZ-DR-A-PL110300.pdf
|
Proposed Drawing
|
04/02/2025 17:10:28 |
Proposed N3E Roof GA Plan 4602_001-GRID-N3E-112R-DR-A-PL110112.pdf
|
Proposed Drawing
|
04/02/2025 17:10:27 |
Proposed N3E Level 11 GA Plan 4602_001-GRID-N3E-111L-DR-A-PL110111.pdf
|
Proposed Drawing
|
04/02/2025 17:10:26 |
Proposed N3E Level 01-10 GA Plan 4602_001-GRID-N3E-102L-DR-A-PL110102.pdf
|
Proposed Drawing
|
04/02/2025 17:10:26 |
Proposed Ground Floor GA Plan 4602_001-GRID-N3E-100L-DR-A-PL110100.pdf
|
Proposed Drawing
|
04/02/2025 17:10:25 |
Proposed Basement GA Plan 4602_001-GRID-N3E-099B-DR-A-PL110099.pdf
|
Proposed Drawing
|
04/02/2025 17:10:24 |
Proposed West GA Elevation 4602_001-GRID-N3E-ZZZ-DR-A-PL100303.pdf
|
Proposed Drawing
|
04/02/2025 17:10:24 |
Proposed South GA Elevation 4602_001-GRID-N3E-ZZZ-DR-A-PL100302.pdf
|
Proposed Drawing
|
04/02/2025 17:10:23 |
Proposed East GA Elevation 4602_001-GRID-N3E-ZZZ-DR-A-PL100301.pdf
|
Proposed Drawing
|
04/02/2025 17:10:22 |
Proposed North GA Eleavtion 4602_001-GRID-N3E-ZZZ-DR-A-PL100300.pdf
|
Proposed Drawing
|
04/02/2025 17:10:21 |
Bay Study South Elevation 4602_001-GRID-N3E-ZZZ-DR-A-PL121401.pdf
|
Proposed Drawing
|
04/02/2025 17:10:20 |
Plot N5 Bay Study N5-A 4602_001-GRID-N5Z-ZZZ-DR-A-PL321406.pdf
|
Proposed Drawing
|
04/02/2025 17:10:19 |
Plot N5 Bay Study N5-D 4602_001-GRID-N5Z-ZZZ-DR-A-PL321405.pdf
|
Proposed Drawing
|
04/02/2025 17:10:18 |
Plot N5 Bay Study N5-A, C & D 4602_001-GRID-N5Z-ZZZ-DR-A-PL321404.pdf
|
Proposed Drawing
|
04/02/2025 17:10:18 |
Plot N4 Bay Study N4-D 4602_001-GRID-N4Z-ZZZ-DR-A-PL221403.pdf
|
Proposed Drawing
|
04/02/2025 17:10:17 |
Plot N4 Bay Study N4-A, B & C 4602_001-GRID-N4Z-ZZZ-DR-A-PL221402.pdf
|
Proposed Drawing
|
04/02/2025 17:10:16 |
Proposed Site Plan First Floor 4602_001-GRID-00-100L-DR-A-PL000012.pdf
|
Proposed Drawing
|
04/02/2025 17:10:15 |
Proposed Site Plan Ground Floor 4602_001-GRID-00-100L-DR-A-PL000011.pdf
|
Proposed Drawing
|
04/02/2025 17:10:15 |
Exsiting Site Plan 4602_001-GRID-00-100L-DR-A-PL000010.pdf
|
Existing Drawing
|
04/02/2025 17:10:14 |
Site Location Plan 4602_001-GRID-00-100L-DR-A-PL000009.pdf
|
OS Extract
|
04/02/2025 17:10:13 |
Severability Plan 4602_001-GRID-00-100L-DR-A-00_P011.pdf
|
Proposed Drawing
|
04/02/2025 17:10:13 |
Proposed Long Section South 4602_001-GRID-00-100L-DR-A-PL000017.pdf
|
Proposed Drawing
|
04/02/2025 17:10:12 |
Proposed Long Section North 4602_001-GRID-00-100L-DR-A-PL000016.pdf
|
Proposed Drawing
|
04/02/2025 17:10:11 |
Proposed Section AA & BB 4602_001-GRID-00-100L-DR-A-PL000015.pdf
|
Proposed Drawing
|
04/02/2025 17:10:10 |
Proposed Site Elevation North & South CC & DD 4602_001-GRID-00-100L-DR-A-PL000014.pdf
|
Proposed Drawing
|
04/02/2025 17:10:08 |
Proposed Site Plan Roof 4602_001-GRID-00-100L-DR-A-PL000013.pdf
|
Proposed Drawing
|
04/02/2025 17:10:07 |
Appendix 6.7.1 - 6.7.30_Part8.pdf
|
Supporting Documents
|
04/02/2025 17:10:06 |
Appendix 6.7.1 - 6.7.30_Part7.pdf
|
Supporting Documents
|
04/02/2025 17:10:05 |
Appendix 6.7.1 - 6.7.30_Part6.pdf
|
Supporting Documents
|
04/02/2025 17:10:03 |
Appendix 6.7.1 - 6.7.30_Part5.pdf
|
Supporting Documents
|
04/02/2025 17:10:01 |
Appendix 6.7.1 - 6.7.30_Part4.pdf
|
Supporting Documents
|
04/02/2025 17:09:59 |
Appendix 6.7.1 - 6.7.30_Part3.pdf
|
Supporting Documents
|
04/02/2025 17:09:57 |
Appendix 6.7.1 - 6.7.30_Part2.pdf
|
Supporting Documents
|
04/02/2025 17:09:56 |
Appendix 6.7.1 - 6.7.30_Part1.pdf
|
Supporting Documents
|
04/02/2025 17:09:54 |
Appendix 6.6.1_3.pdf
|
Supporting Documents
|
04/02/2025 17:09:50 |
Appendix 6.6.1_2.pdf
|
Supporting Documents
|
04/02/2025 17:09:49 |
Appendix 6.6.1_1.pdf
|
Supporting Documents
|
04/02/2025 17:09:48 |
Appendix 6.6.1.pdf
|
Supporting Documents
|
04/02/2025 17:09:44 |
Appendix 6.4.2_8.pdf
|
Supporting Documents
|
04/02/2025 17:09:44 |
Appendix 6.4.2_7.pdf
|
Supporting Documents
|
04/02/2025 17:09:43 |
Appendix 6.4.2_6.pdf
|
Supporting Documents
|
04/02/2025 17:09:43 |
Appendix 6.4.2_5.pdf
|
Supporting Documents
|
04/02/2025 17:09:42 |
Appendix 6.4.2_4.pdf
|
Supporting Documents
|
04/02/2025 17:09:41 |
Appendix 6.4.2_3.pdf
|
Supporting Documents
|
04/02/2025 17:09:40 |
Appendix 6.4.2_2.pdf
|
Supporting Documents
|
04/02/2025 17:09:39 |
Appendix 6.4.2_1.pdf
|
Supporting Documents
|
04/02/2025 17:09:38 |
Appendix 6.4.2.pdf
|
Supporting Documents
|
04/02/2025 17:09:35 |
Appendix 6.4.1.pdf
|
Supporting Documents
|
04/02/2025 17:09:34 |
Appendix 6.3.1_3.pdf
|
Supporting Documents
|
04/02/2025 17:09:33 |
Appendix 6.3.1_2.pdf
|
Supporting Documents
|
04/02/2025 17:09:32 |
Appendix 6.3.1_1.pdf
|
Supporting Documents
|
04/02/2025 17:09:31 |
Appendix 6.3.1.pdf
|
Supporting Documents
|
04/02/2025 17:09:30 |
Appendix 6.11.4.pdf
|
Supporting Documents
|
04/02/2025 17:09:29 |
Appendix 6.11.3.pdf
|
Supporting Documents
|
04/02/2025 17:09:28 |
Appendix 6.11.2.pdf
|
Supporting Documents
|
04/02/2025 17:09:28 |
Appendix 6.11.1.pdf
|
Supporting Documents
|
04/02/2025 17:09:27 |
Appendix 6.7.1 - 6.7.30_Part17.pdf
|
Supporting Documents
|
04/02/2025 17:09:25 |
Appendix 6.7.1 - 6.7.30_Part16.pdf
|
Supporting Documents
|
04/02/2025 17:09:23 |
Appendix 6.7.1 - 6.7.30_Part15.pdf
|
Supporting Documents
|
04/02/2025 17:09:21 |
Appendix 6.7.1 - 6.7.30_Part14.pdf
|
Supporting Documents
|
04/02/2025 17:09:20 |
Appendix 6.7.1 - 6.7.30_Part13.pdf
|
Supporting Documents
|
04/02/2025 17:09:19 |
Appendix 6.7.1 - 6.7.30_Part12.pdf
|
Supporting Documents
|
04/02/2025 17:09:18 |
Appendix 6.7.1 - 6.7.30_Part11.pdf
|
Supporting Documents
|
04/02/2025 17:09:16 |
Appendix 6.7.1 - 6.7.30_Part10.pdf
|
Supporting Documents
|
04/02/2025 17:09:14 |
Appendix 6.7.1 - 6.7.30_Part9.pdf
|
Supporting Documents
|
04/02/2025 17:09:12 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part4.pdf
|
Supporting Documents
|
04/02/2025 17:09:11 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part3.pdf
|
Supporting Documents
|
04/02/2025 17:09:10 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part2.pdf
|
Supporting Documents
|
04/02/2025 17:09:09 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part1.pdf
|
Supporting Documents
|
04/02/2025 17:09:08 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part8.pdf
|
Supporting Documents
|
04/02/2025 17:09:07 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part7.pdf
|
Supporting Documents
|
04/02/2025 17:09:06 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part6.pdf
|
Supporting Documents
|
04/02/2025 17:09:05 |
4271_O2 Finchley_THVIA_2025-01-29_144dpi_Part5.pdf
|
Supporting Documents
|
04/02/2025 17:09:04 |
Chapter 6.4 Flood Risk_Final.pdf
|
Supporting Documents
|
04/02/2025 17:09:03 |
Chapter 6.3 Transport_Final.pdf
|
Supporting Documents
|
04/02/2025 17:09:03 |
Chapter 6.2 Air Quality_Final.pdf
|
Supporting Documents
|
04/02/2025 17:09:02 |
Chapter 6.1 Noise and Vibration_Final.pdf
|
Supporting Documents
|
04/02/2025 17:09:01 |
O2 Masterplan Section 73 Application_Non-Technical Summary Addendum_Final_31.01.2025.pdf
|
Supporting Documents
|
04/02/2025 17:09:01 |
O2 Masterplan Section 73 Application_ES Addendum_Final_31.01.2025.pdf
|
Supporting Documents
|
04/02/2025 17:09:00 |
Chapter 6.11 Climate Change_Final.pdf
|
Supporting Documents
|
04/02/2025 17:09:00 |
Chapter 6.10 Socio-economics_Final.pdf
|
Supporting Documents
|
04/02/2025 17:08:59 |
Chapter 6.9 Ecology_Final.pdf
|
Supporting Documents
|
04/02/2025 17:08:58 |
Chapter 6.8 Wind_Final.pdf
|
Supporting Documents
|
04/02/2025 17:08:57 |
Chapter 6.7 DSO_Final.pdf
|
Supporting Documents
|
04/02/2025 17:08:57 |
Chapter 6.6 Archaeology_Final.pdf
|
Supporting Documents
|
04/02/2025 17:08:56 |
Chapter 6.5 Ground Conditions and Contamination_Final.pdf
|
Supporting Documents
|
04/02/2025 17:06:02 |
Application Form (No Personal Data)
|
Application Form
|
04/02/2025 17:06:05 |
Q220244 O2 S73 AIF Phase 1b 300125.pdf
|
Supporting Documents
|
04/02/2025 17:06:09 |
Q220244 O2 S73 AIF Phase 1c 300125.pdf
|
Supporting Documents
|
04/02/2025 17:06:10 |
Sustainability Statement Addendum incl WLCA.pdf
|
Supporting Documents
|
04/02/2025 17:06:13 |
Sustainable Drainage Report Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:06:16 |
Transport Assessment Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:06:19 |
UGF Statement Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:06:20 |
Updated BNG Assessment.pdf
|
Supporting Documents
|
04/02/2025 17:06:24 |
Updated CAVAT Assessment.pdf
|
Supporting Documents
|
04/02/2025 17:06:25 |
Waste Management Plan Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:06:26 |
Affordable Housing Statement Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:08:31 |
CIL Phasing Strategy.pdf
|
Supporting Documents
|
04/02/2025 17:08:32 |
Circular Economy Statement Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:08:34 |
Development Specification Document.pdf
|
Supporting Documents
|
04/02/2025 17:08:35 |
Fire Statement Form.pdf
|
Supporting Documents
|
04/02/2025 17:08:36 |
Fire Statement.pdf
|
Supporting Documents
|
04/02/2025 17:08:38 |
Flood Risk Assessment Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:08:39 |
Health Impact Assessment Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:08:40 |
Open Space and Landscape Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:08:41 |
Planning Statement Addendum.pdf
|
Supporting Documents
|
04/02/2025 17:08:41 |
Q220244 O2 S73 AIF Phase 1a 300125.pdf
|
CIL
|
04/02/2025 17:08:42 |
Biodiversity Metric 2.0 Calculation Tool.xlsx
|
Supporting Documents
|
04/02/2025 17:08:43 |
Neighbouring Lane Cross Section.pdf
|
Proposed Drawing
|
04/02/2025 17:08:44 |
Play Spaces.pdf
|
Proposed Drawing
|
04/02/2025 17:08:45 |
Residential Neighbourhood Plan.pdf
|
Proposed Drawing
|
04/02/2025 17:08:46 |
Residential Podium Gardens.pdf
|
Proposed Drawing
|
04/02/2025 17:08:46 |
Tree Plan.pdf
|
Proposed Drawing
|
04/02/2025 17:08:47 |
Upper Podium Section.pdf
|
Proposed Drawing
|
04/02/2025 17:08:48 |
Amenity Terrace and Joiner Block.pdf
|
Proposed Drawing
|
04/02/2025 17:08:49 |
Blackburn Road Sections A.pdf
|
Proposed Drawing
|
04/02/2025 17:08:50 |
Central Square Section.pdf
|
Proposed Drawing
|
04/02/2025 17:08:50 |
Community Garden Plan.pdf
|
Proposed Drawing
|
04/02/2025 17:08:51 |
Detailed Roof Plan.pdf
|
Proposed Drawing
|
04/02/2025 17:08:52 |
Landscape and Public Realm Plan.pdf
|
Proposed Drawing
|
04/02/2025 17:08:53 |
Linear park podium section.pdf
|
Proposed Drawing
|
04/02/2025 17:08:54 |
Linear Park Section 2 and Podium.pdf
|
Proposed Drawing
|
04/02/2025 17:08:55 |
Linear park section 03.pdf
|
Proposed Drawing
|